  • e68e210eb8 Merge pull request 'Accept the traceability matrix' (#34) from accept-traceability-matrix into main main Tirsvad 2026-10-06 16:14:26 +02:00
  • 8ada9ea5cf Accept the traceability matrix S01 accepts TM-001. With this, no document in docs/ is Proposed. No issue closed: documentation status only, no code changed. accept-traceability-matrix Tirsvad 2026-10-06 22:11:54 +08:00
  • eb037f3ad2 Merge pull request 'Sign review records RC-001 to RC-009 as accepted' (#33) from sign-review-records into main Tirsvad 2026-10-06 16:09:15 +02:00
  • 69021844af Sign review records RC-001 to RC-009 as accepted S01 accepts the nine SQA review records. The one-person independence limit stays recorded in each record. No issue closed: documentation status only, no code changed. sign-review-records Tirsvad 2026-10-06 22:05:23 +08:00
  • c7df22c82a Merge pull request 'Review the Project Plan (RC-009) and accept v3' (#32) from rc-009-project-plan-v2 into main Tirsvad 2026-10-06 16:00:07 +02:00
  • 865ca9cd35 Resolve pending commit links in the RC-009 change rc-009-project-plan-v2 TirsvadandClaude Sonnet 5.5 2026-10-06 21:55:34 +08:00
  • 52b972520d Review the Project Plan (RC-009) and accept v3 Tirsvad 2026-10-06 21:55:08 +08:00
  • 83f3acdc68 Merge pull request 'Re-review the Business Case (RC-008) and accept v4' (#31) from rc-008-business-case-v3 into main Tirsvad 2026-10-06 15:46:50 +02:00
  • 2b65618c1a Resolve pending commit links in the RC-008 change rc-008-business-case-v3 TirsvadandClaude Sonnet 5.5 2026-10-06 21:46:06 +08:00
  • 861edbfa92 Re-review the Business Case and accept v4 Add RC-008 for the Business Case after v3 added objective 6. Two defects found: objective 6 had no success criterion, and the Python version was worded differently in the assumption and the constraint. BC-001 v4 fixes both and is accepted; v3 is deprecated. The traceability matrix now points to RC-008. No issue closed: review and documentation only, no code changed. Tirsvad 2026-10-06 21:44:11 +08:00
  • 71a27ddc1f Re-review the Business Case and accept v4 Add RC-008 for the Business Case after v3 added objective 6. Two defects found: objective 6 had no success criterion, and the Python version was worded differently in the assumption and the constraint. BC-001 v4 fixes both and is accepted; v3 is deprecated. The traceability matrix now points to RC-008. No issue closed: review and documentation only, no code changed. Tirsvad 2026-10-06 21:44:02 +08:00
  • 693cfd5b24 Merge pull request 'README: mention docs/sqa in the project layout' (#30) from docs-readme-layout into main Tirsvad 2026-10-06 15:16:40 +02:00
  • 93928b5f27 Describe docs/sqa in the README project layout docs-readme-layout TirsvadandClaude Sonnet 5.5 2026-10-06 21:16:03 +08:00
  • 58116dcb5d Merge pull request 'MIL-004: source code review and CI' (#29) from mil-004-code-review-and-ci into main Tirsvad 2026-10-06 14:59:32 +02:00
  • f192f227e2 Resolve pending commit links in MIL-004 review records mil-004-code-review-and-ci TirsvadandClaude Sonnet 5.5 2026-10-06 20:56:18 +08:00
  • 00d47e244c Review source code and add CI for MIL-004 Tirsvad 2026-10-06 20:50:41 +08:00
  • ffffee04f4 Merge pull request 'SQA review records and MIL-004 plan (Code Review and CI)' (#23) from rc-planning-review into main Tirsvad 2026-10-06 14:44:57 +02:00
  • 2b9e46b81f Resolve pending commit links in review and planning documents rc-planning-review TirsvadandClaude Sonnet 5.5 2026-10-06 20:43:23 +08:00
  • 8ef00aafaa Add SQA review records and plan MIL-004 Code Review and CI Tirsvad 2026-10-06 20:42:51 +08:00
  • 1403dacf0e Merge pull request 'MIL-003: tests, Doxygen check and repository metadata' (#22) from mil-003-quality-and-publication into main Tirsvad 2026-10-06 13:57:11 +02:00
  • 8a0e03a6ff Add tests and publish repository metadata for MIL-003 mil-003-quality-and-publication Tirsvad 2026-10-06 19:56:08 +08:00
  • 9b5eff7163 Merge pull request 'MIL-002: coffee machine core' (#21) from mil-002-coffee-machine-core into main Tirsvad 2026-10-06 13:52:17 +02:00
  • d570489a33 Implement coffee machine core for MIL-002 mil-002-coffee-machine-core Tirsvad 2026-10-06 19:49:49 +08:00
  • 0f26d8d91e Merge pull request 'MIL-001: README with setup, run and test instructions' (#20) from mil-001-readme into main Tirsvad 2026-10-06 13:45:59 +02:00
  • c2a8767fb0 Add README with setup, run, test and Doxygen instructions mil-001-readme Tirsvad 2026-10-06 19:45:09 +08:00
  • 322efae5b4 Merge pull request 'MIL-001: project skeleton and tooling' (#19) from mil-001-project-setup into main Tirsvad 2026-10-04 18:31:21 +02:00
  • 572074ae73 Set up project skeleton and tooling for MIL-001 mil-001-project-setup Tirsvad 2026-10-05 00:30:18 +08:00
  • c3e225b049 Merge pull request 'Add planning baseline: BC, SA, PP and MIL-001 to MIL-003' (#18) from plan-baseline into main Tirsvad 2026-10-04 18:26:38 +02:00
  • b448cde56d Resolve pending commit links in planning documents plan-baseline TirsvadandClaude Sonnet 5.5 2026-10-05 00:25:39 +08:00
  • c0c3940551 Add planning baseline: BC, SA, PP and MIL-001 to MIL-003 Tirsvad 2026-10-05 00:24:54 +08:00
  • 7e03449336 Initial commit Tirsvad 2026-10-04 18:12:54 +02:00