S01 accepts the nine SQA review records RC-001 to RC-009: the Version History row of each record changes from Proposed to Accepted. Nothing else in them changes.
Notes for the reviewer:
The reviewer-is-not-author rule still cannot be met in a one-person project; each record states this, and signing does not make the reviews independent.
The traceability matrix (TM-001) is not a review record and stays Proposed.
No issue closed: documentation status only, no code changed.
S01 accepts the nine SQA review records RC-001 to RC-009: the Version History row of each record changes from Proposed to Accepted. Nothing else in them changes.
Notes for the reviewer:
- The reviewer-is-not-author rule still cannot be met in a one-person project; each record states this, and signing does not make the reviews independent.
- The traceability matrix (TM-001) is not a review record and stays Proposed.
No issue closed: documentation status only, no code changed.
S01 accepts the nine SQA review records. The one-person independence
limit stays recorded in each record.
No issue closed: documentation status only, no code changed.
Tirsvad
merged commit eb037f3ad2 into main2026-10-06 16:09:15 +02:00
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.
S01 accepts the nine SQA review records RC-001 to RC-009: the Version History row of each record changes from Proposed to Accepted. Nothing else in them changes.
Notes for the reviewer:
No issue closed: documentation status only, no code changed.