Adds review records RC-001 to RC-005 for the Business Case, Stakeholder Analysis and MIL-001 to MIL-003, each checked against its QC checklist, plus a traceability matrix. RC and TM are registered in the artifact registry.

The reviews found one defect: the Business Case had no duration constraint although the milestones and the plan cite one. BC-001 v2 adds it, and SA-001 v2 records the sign-off.

Plans MIL-004 (review the source against QC-PY-001, add a CI workflow) as Proposed, with Business Case objective 6 (v3, Proposed), a Project Plan gateway row (v2, Proposed) and a matrix entry. MIL-004 is not yet synced to the git host.

Notes for the reviewer:

  • The reviewer-is-not-author rule cannot be met in a one-person project; each RC states this.
  • The RC records are Proposed until S01 signs them.
  • The QC checklists come from the nested framework/qc submodule, checked out locally at its pinned commit; no submodule change is in this PR.

No issue closed: planning and review documents only, no code changed.

Adds review records RC-001 to RC-005 for the Business Case, Stakeholder Analysis and MIL-001 to MIL-003, each checked against its QC checklist, plus a traceability matrix. RC and TM are registered in the artifact registry. The reviews found one defect: the Business Case had no duration constraint although the milestones and the plan cite one. BC-001 v2 adds it, and SA-001 v2 records the sign-off. Plans MIL-004 (review the source against QC-PY-001, add a CI workflow) as Proposed, with Business Case objective 6 (v3, Proposed), a Project Plan gateway row (v2, Proposed) and a matrix entry. MIL-004 is not yet synced to the git host. Notes for the reviewer: - The reviewer-is-not-author rule cannot be met in a one-person project; each RC states this. - The RC records are Proposed until S01 signs them. - The QC checklists come from the nested framework/qc submodule, checked out locally at its pinned commit; no submodule change is in this PR. No issue closed: planning and review documents only, no code changed.
Tirsvad added 2 commits 2026-10-06 14:43:27 +02:00
Add RC-001 to RC-005 for the Business Case, Stakeholder Analysis and
MIL-001 to MIL-003, checked against their QC checklists, and a
traceability matrix. The reviews found a missing duration constraint in
the Business Case; BC-001 v2 adds it, and SA-001 v2 records the
sign-off. Register RC and TM in the artifact registry.

Plan MIL-004 (review the source against QC-PY-001, add a CI workflow)
as Proposed, with Business Case objective 6, a Project Plan gateway
row and a matrix entry. The milestone is not yet synced to the git host.

No issue closed: planning and review documents only, no code changed.
Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
Tirsvad merged commit ffffee04f4 into main 2026-10-06 14:44:58 +02:00
Sign in to join this conversation.
No Reviewers
No labels
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: Tirsvad-Udemy-100-days-of-code/015-coffee-machine#23