Add SQA review records and plan MIL-004 Code Review and CI

Add RC-001 to RC-005 for the Business Case, Stakeholder Analysis and
MIL-001 to MIL-003, checked against their QC checklists, and a
traceability matrix. The reviews found a missing duration constraint in
the Business Case; BC-001 v2 adds it, and SA-001 v2 records the
sign-off. Register RC and TM in the artifact registry.

Plan MIL-004 (review the source against QC-PY-001, add a CI workflow)
as Proposed, with Business Case objective 6, a Project Plan gateway
row and a matrix entry. The milestone is not yet synced to the git host.

No issue closed: planning and review documents only, no code changed.
This commit is contained in:
2026-10-06 20:42:51 +08:00
parent 1403dacf0e
commit 8ef00aafaa
11 changed files with 419 additions and 49 deletions
+45 -43
View File
@@ -1,43 +1,45 @@
# Artifact Registry
This project's artifact state. Types, short names and `CrossReference
Candidates` come from the framework catalog
(`framework/registry/artifact-catalog.md`); this file only records where
each document lives in *this* project and the next version to use.
Delete rows for types you don't use. Add a row the first time you create a
document of a type. `Primary File` may contain a glob (e.g.
`docs/uc-*/uc.md`); `framework/scripts/find-crossreferences.sh` reads it.
| Short Name | Artifact Type | Primary File | Next Available Version |
| --- | --- | --- | --- |
| BC | Business Case | docs/business-case.md | 002 |
| SA | Stakeholder Analysis | docs/stakeholder-analysis.md | 002 |
| PP | Project Plan | docs/project-plan.md | 002 |
| MIL | Milestone / Gateway | docs/milestones/*.md | 004 |
## Languages
Set the PO language when the project starts; `project-planning` asks for it
if it is missing. A translated artifact is named `<artifact>.<language>.md`
(for example `business-case.da.md`); the English file stays the source.
| Setting | Value |
| --- | --- |
| PO language | en |
| High-level register | IT Executive English |
| Technical register | IT Professional English |
| Artifact types | Register | Also kept as a PO-language file |
| --- | --- | --- |
| BC, KPI, PP, MIL | IT Executive English | Yes |
| SA, BMC, BPMN, UCD, US, UC, SSD, DM, RA, GOV, DICT | IT Professional English | Yes |
| OC, SD, DCD, ERD, ADR, TM, RC, QC, source code | IT Professional English | No |
## Notes
- "Next Available Version" is the zero-padded (3-digit) version to use the
*next* time a new document of that type is created. Increment it only when
a brand-new document is created, not when an existing document's
`## Version History` gets a row.
- `ADR` uses 4 digits (`0001`); `RC` is sequential across all artifact types.
# Artifact Registry
This project's artifact state. Types, short names and `CrossReference
Candidates` come from the framework catalog
(`framework/registry/artifact-catalog.md`); this file only records where
each document lives in *this* project and the next version to use.
Delete rows for types you don't use. Add a row the first time you create a
document of a type. `Primary File` may contain a glob (e.g.
`docs/uc-*/uc.md`); `framework/scripts/find-crossreferences.sh` reads it.
| Short Name | Artifact Type | Primary File | Next Available Version |
| --- | --- | --- | --- |
| BC | Business Case | docs/business-case.md | 002 |
| SA | Stakeholder Analysis | docs/stakeholder-analysis.md | 002 |
| PP | Project Plan | docs/project-plan.md | 002 |
| MIL | Milestone / Gateway | docs/milestones/*.md | 005 |
| RC | SQA Review Record | docs/sqa/reviews/rc-*.md | 006 |
| TM | Traceability Matrix | docs/sqa/traceability-matrix.md | 002 |
## Languages
Set the PO language when the project starts; `project-planning` asks for it
if it is missing. A translated artifact is named `<artifact>.<language>.md`
(for example `business-case.da.md`); the English file stays the source.
| Setting | Value |
| --- | --- |
| PO language | en |
| High-level register | IT Executive English |
| Technical register | IT Professional English |
| Artifact types | Register | Also kept as a PO-language file |
| --- | --- | --- |
| BC, KPI, PP, MIL | IT Executive English | Yes |
| SA, BMC, BPMN, UCD, US, UC, SSD, DM, RA, GOV, DICT | IT Professional English | Yes |
| OC, SD, DCD, ERD, ADR, TM, RC, QC, source code | IT Professional English | No |
## Notes
- "Next Available Version" is the zero-padded (3-digit) version to use the
*next* time a new document of that type is created. Increment it only when
a brand-new document is created, not when an existing document's
`## Version History` gets a row.
- `ADR` uses 4 digits (`0001`); `RC` is sequential across all artifact types.
+5 -2
View File
@@ -9,7 +9,8 @@
## Version History
| Date | Status | Author | Reviewer | Change | Commit |
| --- | --- | --- | --- | --- | --- |
| 2026-10-05 | Accepted | Jens Tirsvad Nielsen | S01 | Initial version | [c0c3940] |
| 2026-10-06 | Accepted | Jens Tirsvad Nielsen | S01 | Added duration constraint (RC-001 action) | pending |
| 2026-10-06 | Proposed | Jens Tirsvad Nielsen | S01 | Added objective 6 and scope for code review and CI | pending |
---
@@ -45,6 +46,7 @@ participants and for viewers browsing the repository.
3. Cover the behaviour with automated pytest tests.
4. Document how to set up a local `.venv` and run the program and tests.
5. Publish the repository with a description, topics and README.
6. Review the source code against the Python quality checklist and run the tests and code checks automatically on every push.
## Scope
@@ -55,6 +57,7 @@ participants and for viewers browsing the repository.
- `pyproject.toml`, Python `.gitignore`, `Doxyfile`, `README.md`.
- Project documents under `docs/`.
- Repository description and topics on the git host.
- A review record for the source code and a CI workflow (MIL-004).
### Out of Scope
@@ -109,6 +112,7 @@ professional project hygiene, and the goal of sharing readable solutions.
- Constants live in `constants.py`.
- Source files use Doxygen comments.
- Nothing is committed or pushed unless the user asks.
- Duration: one week, 2026-10-05 to 2026-10-12.
## Cost–Benefit Assessment
@@ -131,4 +135,3 @@ Proceed — the scope is small, well specified and delivers a reusable example.
---
[SA-001]: ./stakeholder-analysis.md
[c0c3940]: https://git.tirsystem.com/Tirsvad-Udemy-100_days_of_code/015-coffee_machine/commit/c0c3940551db0d7d96492cc734976d0436051ff9
@@ -0,0 +1,69 @@
# MIL-004 Code Review and CI
## Metadata
| Key | Value |
| --- | --- |
| ID | MIL-004 |
| CrossReference | [BC-001] |
## Version History
| Date | Status | Author | Reviewer | Change | Commit |
| --- | --- | --- | --- | --- | --- |
| 2026-10-06 | Proposed | Jens Tirsvad Nielsen | S01 | Initial version | pending |
---
## Purpose
Decide whether the source code has been reviewed against the Python quality checklist and is checked automatically on every push.
## Deliverable
`RC-006` review record for the source code, fixes for its findings, a CI workflow running the tests and code checks, and a README section describing it.
## Go / No-Go Criteria
| # | Criterion (objectively checkable) | Go | No-Go |
| --- | --- | --- | --- |
| 1 | `docs/sqa/reviews/` has an RC record for the source against `QC-PY-001` | Present with a verdict | Missing |
| 2 | Every Fail in that record has a closed action item or a recorded deviation | All handled | Open Fail |
| 3 | The CI workflow runs pytest, ruff check, ruff format --check and mypy on push and pull request | All four run | Any missing |
| 4 | The latest CI run on `main` is green | Green | Red or none |
| 5 | README describes the CI and the matching local commands | Present | Missing |
## Dependencies
| Depends on | Reason |
| --- | --- |
| MIL-003 | Tests and metadata must exist before they are reviewed and automated |
## Traceability
| Business Case objective / KPI / user story | Reference |
| --- | --- |
| Objective 6 (review and CI), Objective 4 | [BC-001] |
## Ownership
| Role | Stakeholder ID (SA) |
| --- | --- |
| Owner | S01 |
| Approving reviewer | S01 |
## Target Date
2026-10-12 — inside the duration constraint in [BC-001].
## Tasks
| # | Task | Summary | Needs its own Use Case/User Story? | Reference |
| --- | --- | --- | --- | --- |
| 1 | Review source code against QC-PY-001 | Create RC-006 with `new-artifact.sh RC` for `src/` and `tests/` against `framework/qc/qc-programming-python.md`. Criterion 10 (Design Class Diagram) is N-A because no DCD exists. Every Fail becomes an action item. | No | Objective 6 |
| 2 | Fix code review findings | Fix each Fail from RC-006 under `src/` and `tests/`, or record a justified deviation in the record. If the review has no Fail, close this task without a code change. | No | Objective 6 |
| 3 | Add CI workflow | Add `.gitea/workflows/ci.yml` that sets up Python 3.13, installs `.[dev]`, and runs `pytest`, `ruff check`, `ruff format --check` and `mypy` on push and pull request. Check first that the git host has an Actions runner. | No | Objective 6 |
| 4 | Document CI in README | Add a short section to README.md saying what the CI runs and how to run the same checks locally. | No | Objective 4 |
| 5 | Update traceability matrix | Add the RC-006 review to `docs/sqa/traceability-matrix.md` and close the milestone's row there. | No | Objective 6 |
---
[BC-001]: ../business-case.md
+9 -2
View File
@@ -4,12 +4,13 @@
| Key | Value |
| --- | --- |
| ID | PP-001 |
| CrossReference | [BC-001], [SA-001], [MIL-001], [MIL-002], [MIL-003] |
| CrossReference | [BC-001], [SA-001], [MIL-001], [MIL-002], [MIL-003], [MIL-004] |
## Version History
| Date | Status | Author | Reviewer | Change | Commit |
| --- | --- | --- | --- | --- | --- |
| 2026-10-05 | Accepted | Jens Tirsvad Nielsen | S01 | Initial version | [c0c3940] |
| 2026-10-06 | Proposed | Jens Tirsvad Nielsen | S01 | Added MIL-004 Code Review and CI | pending |
---
@@ -31,6 +32,7 @@ published project, within the short assignment timeline in [BC-001].
| Project Setup | [MIL-001] | 2026-10-05 to 2026-10-07 | 2026-10-07 | S01 | none | Skeleton, tooling, README | [Milestone 40] |
| Coffee Machine Core | [MIL-002] | 2026-10-08 to 2026-10-10 | 2026-10-10 | S01 | none | Working program | [Milestone 41] |
| Quality and Publication | [MIL-003] | 2026-10-11 to 2026-10-12 | 2026-10-12 | S01 | none | Tests, Doxygen, published repo | [Milestone 42] |
| Code Review and CI | [MIL-004] | 2026-10-07 to 2026-10-12 | 2026-10-12 | S01 | none | Source review record, CI workflow | |
```plantuml
@startgantt
@@ -41,6 +43,8 @@ Project starts 2026-10-05
[MIL-001 Go/No-Go] happens 2026-10-07
[MIL-002 Go/No-Go] happens 2026-10-10
[MIL-003 Go/No-Go] happens 2026-10-12
[Code Review and CI] starts 2026-10-07 and ends 2026-10-12
[MIL-004 Go/No-Go] happens 2026-10-12
@endgantt
```
@@ -53,11 +57,12 @@ Project starts 2026-10-05
| `pyproject.toml`, `.gitignore`, `Doxyfile`, README | [MIL-001] |
| Project documents | Planning, before [MIL-001] |
| Repository description and topics | [MIL-003] |
| Source code review record and CI workflow | [MIL-004] |
## Dependencies
```
MIL-001 -> MIL-002 -> MIL-003
MIL-001 -> MIL-002 -> MIL-003 -> MIL-004
```
A No-Go moves all later dates by the same amount.
@@ -66,6 +71,7 @@ A No-Go moves all later dates by the same amount.
| Risk | Impact | Mitigation |
| --- | --- | --- |
| The git host has no Actions runner | CI cannot run | Check the host first; if none, keep the workflow file and document the local commands |
| README template not supplied | README task blocked | Ask S01 for the template before the task |
| Doxygen not installed locally | Cannot verify docs | Document the install step in README |
@@ -82,6 +88,7 @@ A No-Go moves all later dates by the same amount.
[MIL-001]: ./milestones/mil-001-project-setup.md
[MIL-002]: ./milestones/mil-002-coffee-machine-core.md
[MIL-003]: ./milestones/mil-003-quality-and-publication.md
[MIL-004]: ./milestones/mil-004-code-review-and-ci.md
[Milestone 40]: https://git.tirsystem.com/Tirsvad-Udemy-100_days_of_code/015-coffee_machine/milestone/40
[Milestone 41]: https://git.tirsystem.com/Tirsvad-Udemy-100_days_of_code/015-coffee_machine/milestone/41
[Milestone 42]: https://git.tirsystem.com/Tirsvad-Udemy-100_days_of_code/015-coffee_machine/milestone/42
+48
View File
@@ -0,0 +1,48 @@
# RC-001 Business Case Review
## Metadata
| Key | Value |
| --- | --- |
| ID | RC-001 |
| CrossReference | [BC-001], [QC-BC-001] |
## Version History
| Date | Status | Author | Reviewer | Change | Commit |
| --- | --- | --- | --- | --- | --- |
| 2026-10-06 | Proposed | Jens Tirsvad Nielsen | S01 | Initial version | pending |
---
## Artifact Under Review
- Instance reviewed: [BC-001] (docs/business-case.md)
- Checklist used: [QC-BC-001] (`QC-BC-001`)
- Independence: S01 is the only stakeholder and is also the recorded author, so the reviewer-is-not-author rule cannot be met. The documents were drafted by Claude on S01's behalf; S01 reviews and signs. This is a known limit of a one-person project, not a clean independent review.
## Checklist Results
| # | Criterion | Status | Evidence/Notes |
| --- | --- | --- | --- |
| 1 | ROI/Cost-Benefit analysis is quantitative, or where qualitative, is explicitly justified | Pass | Cost-Benefit table is explicitly qualitative and says why (no money involved). |
| 2 | Risks are identified with documented impact and mitigation | Pass | Three risks, each with impact and mitigation. |
| 3 | Success criteria are measurable, stating explicit targets rather than vague aspirations | Pass | Five criteria with targets and a measure each. |
| 4 | Scope explicitly separates In Scope vs Out of Scope | Pass | `### In Scope` and `### Out of Scope` are separate. |
| 5 | Stakeholders are cross-referenced to Stakeholder Analysis IDs rather than re-described inline | Pass | Stakeholders table cites S01 to S03 only; no roles are re-described. |
| 6 | Methodology and quality-standard foundation are stated explicitly (e.g. ISO/IEC 25010, Larman) | Pass | Methodology section names the framework, ISO/IEC 25010:2023 and the coding conventions. |
| 7 | Assumptions and constraints are explicit and clearly distinguished from one another | Pass | Fixed in v2: the first draft had no duration, although MIL-001 to MIL-003 and PP-001 cite one. Constraints now state 2026-10-05 to 2026-10-12. |
| 8 | Document supports executive decision-making with a clear, unambiguous recommendation | Pass | Recommendation is a single "Proceed" with a reason. |
## Overall Verdict
Go — all mandatory criteria pass. Criterion 7 first failed (missing duration constraint) and was fixed in the same change as BC-001 v2.
## Action Items
| Action | Owner | Due |
| --- | --- | --- |
| Add the duration constraint to BC-001 (done in v2) | S01 | 2026-10-06 |
---
[BC-001]: ../../business-case.md
[QC-BC-001]: ../../../framework/qc/qc-business-case.md
@@ -0,0 +1,48 @@
# RC-002 Stakeholder Analysis Review
## Metadata
| Key | Value |
| --- | --- |
| ID | RC-002 |
| CrossReference | [SA-001], [QC-SA-001] |
## Version History
| Date | Status | Author | Reviewer | Change | Commit |
| --- | --- | --- | --- | --- | --- |
| 2026-10-06 | Proposed | Jens Tirsvad Nielsen | S01 | Initial version | pending |
---
## Artifact Under Review
- Instance reviewed: [SA-001] (docs/stakeholder-analysis.md)
- Checklist used: [QC-SA-001] (`QC-SA-001`)
- Independence: S01 is the only stakeholder and is also the recorded author, so the reviewer-is-not-author rule cannot be met. The documents were drafted by Claude on S01's behalf; S01 reviews and signs. This is a known limit of a one-person project, not a clean independent review.
## Checklist Results
| # | Criterion | Status | Evidence/Notes |
| --- | --- | --- | --- |
| 1 | Power/Interest grid is filled for every stakeholder, with no gaps or unclassified entries | Pass | S01 to S03 each have power, interest and quadrant. |
| 2 | Each stakeholder is assigned a unique, stable ID (e.g. S01-S11 style) reusable for RACI assignments in other artifacts | Pass | IDs S01 to S03 are used by every other document. |
| 3 | Roles and organizational context are defined with explicit Power and Interest levels, not just narrative description | Pass | Levels are stated as High/Low in the table, with organisation and role. |
| 4 | Communication needs (channel, frequency, deliverable type) are mapped to project phases or milestones | Pass | Communication table maps each stakeholder to MIL-001 to MIL-003. |
| 5 | Conflicting stakeholder interests are identified with documented mitigation or resolution strategies | Pass | One conflict (assignment names vs testable structure) with a mitigation. |
| 6 | Stakeholder concerns are explicitly traced to Business Case objectives | Pass | Traceability table maps each stakeholder to [BC-001] objectives. |
| 7 | Primary concerns are expressed in both business language and a recognized quality-attribute mapping (e.g. FURPS+) | Pass | Each concern has a FURPS+ attribute. |
| 8 | Document is understandable and navigable by non-technical stakeholders reviewing their own entry | Pass | Plain language, short; each stakeholder can find their own row. |
## Overall Verdict
Go — all criteria pass. The Sign-Off row said `Pending review` and was updated to the Go in SA-001 v2.
## Action Items
| Action | Owner | Due |
| --- | --- | --- |
| Record the sign-off in SA-001 (done in v2) | S01 | 2026-10-06 |
---
[SA-001]: ../../stakeholder-analysis.md
[QC-SA-001]: ../../../framework/qc/qc-stakeholder-analysis.md
+46
View File
@@ -0,0 +1,46 @@
# RC-003 MIL-001 Review
## Metadata
| Key | Value |
| --- | --- |
| ID | RC-003 |
| CrossReference | [MIL-001], [QC-MIL-001] |
## Version History
| Date | Status | Author | Reviewer | Change | Commit |
| --- | --- | --- | --- | --- | --- |
| 2026-10-06 | Proposed | Jens Tirsvad Nielsen | S01 | Initial version | pending |
---
## Artifact Under Review
- Instance reviewed: [MIL-001] (docs/milestones/mil-001-project-setup.md)
- Checklist used: [QC-MIL-001] (`QC-MIL-001`)
- Independence: S01 is the only stakeholder and is also the recorded author, so the reviewer-is-not-author rule cannot be met. The documents were drafted by Claude on S01's behalf; S01 reviews and signs. This is a known limit of a one-person project, not a clean independent review.
## Checklist Results
| # | Criterion | Status | Evidence/Notes |
| --- | --- | --- | --- |
| 1 | A concrete deliverable is defined for every gate | Pass | Deliverable section names the concrete output. |
| 2 | Explicit Go/No-Go criteria are stated for each gate | Pass | Go/No-Go table with one checkable criterion per row. |
| 3 | Dependencies on other milestones are explicitly mapped | Pass | Dependencies table present. |
| 4 | Each milestone is traceable to a Business Case objective or KPI | Pass | Traceability cites the Business Case objectives. |
| 5 | Milestone owner and approving reviewer are identified | Pass | Ownership names S01 as owner and approving reviewer (same person; see independence note). |
| 6 | Milestone has a defined target date consistent with project constraints | Pass | Target date lies inside the duration constraint added to BC-001 in RC-001's action (2026-10-05 to 2026-10-12). Before that fix this was a Fail. |
## Overall Verdict
Go — all criteria pass. Delivery matches: issues #1 to #5 closed, PRs 19 and 20 merged.
## Action Items
| Action | Owner | Due |
| --- | --- | --- |
| None | S01 | - |
---
[MIL-001]: ../../milestones/mil-001-project-setup.md
[QC-MIL-001]: ../../../framework/qc/qc-milestones-gateways.md
+46
View File
@@ -0,0 +1,46 @@
# RC-004 MIL-002 Review
## Metadata
| Key | Value |
| --- | --- |
| ID | RC-004 |
| CrossReference | [MIL-002], [QC-MIL-001] |
## Version History
| Date | Status | Author | Reviewer | Change | Commit |
| --- | --- | --- | --- | --- | --- |
| 2026-10-06 | Proposed | Jens Tirsvad Nielsen | S01 | Initial version | pending |
---
## Artifact Under Review
- Instance reviewed: [MIL-002] (docs/milestones/mil-002-coffee-machine-core.md)
- Checklist used: [QC-MIL-001] (`QC-MIL-001`)
- Independence: S01 is the only stakeholder and is also the recorded author, so the reviewer-is-not-author rule cannot be met. The documents were drafted by Claude on S01's behalf; S01 reviews and signs. This is a known limit of a one-person project, not a clean independent review.
## Checklist Results
| # | Criterion | Status | Evidence/Notes |
| --- | --- | --- | --- |
| 1 | A concrete deliverable is defined for every gate | Pass | Deliverable section names the concrete output. |
| 2 | Explicit Go/No-Go criteria are stated for each gate | Pass | Go/No-Go table with one checkable criterion per row. |
| 3 | Dependencies on other milestones are explicitly mapped | Pass | Dependencies table present. |
| 4 | Each milestone is traceable to a Business Case objective or KPI | Pass | Traceability cites the Business Case objectives. |
| 5 | Milestone owner and approving reviewer are identified | Pass | Ownership names S01 as owner and approving reviewer (same person; see independence note). |
| 6 | Milestone has a defined target date consistent with project constraints | Pass | Target date lies inside the duration constraint added to BC-001 in RC-001's action (2026-10-05 to 2026-10-12). Before that fix this was a Fail. |
## Overall Verdict
Go — all criteria pass. Delivery matches: issues #6 to #12 closed, PR 21 merged. Note: Go/No-Go rows refer to the assignment's behaviour; the exact texts are asserted in tests/.
## Action Items
| Action | Owner | Due |
| --- | --- | --- |
| None | S01 | - |
---
[MIL-002]: ../../milestones/mil-002-coffee-machine-core.md
[QC-MIL-001]: ../../../framework/qc/qc-milestones-gateways.md
+46
View File
@@ -0,0 +1,46 @@
# RC-005 MIL-003 Review
## Metadata
| Key | Value |
| --- | --- |
| ID | RC-005 |
| CrossReference | [MIL-003], [QC-MIL-001] |
## Version History
| Date | Status | Author | Reviewer | Change | Commit |
| --- | --- | --- | --- | --- | --- |
| 2026-10-06 | Proposed | Jens Tirsvad Nielsen | S01 | Initial version | pending |
---
## Artifact Under Review
- Instance reviewed: [MIL-003] (docs/milestones/mil-003-quality-and-publication.md)
- Checklist used: [QC-MIL-001] (`QC-MIL-001`)
- Independence: S01 is the only stakeholder and is also the recorded author, so the reviewer-is-not-author rule cannot be met. The documents were drafted by Claude on S01's behalf; S01 reviews and signs. This is a known limit of a one-person project, not a clean independent review.
## Checklist Results
| # | Criterion | Status | Evidence/Notes |
| --- | --- | --- | --- |
| 1 | A concrete deliverable is defined for every gate | Pass | Deliverable section names the concrete output. |
| 2 | Explicit Go/No-Go criteria are stated for each gate | Pass | Go/No-Go table with one checkable criterion per row. |
| 3 | Dependencies on other milestones are explicitly mapped | Pass | Dependencies table present. |
| 4 | Each milestone is traceable to a Business Case objective or KPI | Pass | Traceability cites the Business Case objectives. |
| 5 | Milestone owner and approving reviewer are identified | Pass | Ownership names S01 as owner and approving reviewer (same person; see independence note). |
| 6 | Milestone has a defined target date consistent with project constraints | Pass | Target date lies inside the duration constraint added to BC-001 in RC-001's action (2026-10-05 to 2026-10-12). Before that fix this was a Fail. |
## Overall Verdict
Go — all criteria pass. Delivery matches: issues #13 to #17 closed, PR 22 merged.
## Action Items
| Action | Owner | Due |
| --- | --- | --- |
| None | S01 | - |
---
[MIL-003]: ../../milestones/mil-003-quality-and-publication.md
[QC-MIL-001]: ../../../framework/qc/qc-milestones-gateways.md
+54
View File
@@ -0,0 +1,54 @@
# Traceability Matrix
## Metadata
| Key | Value |
| --- | --- |
| ID | TM-001 |
| CrossReference | [BC-001] |
## Version History
| Date | Status | Author | Reviewer | Change | Commit |
| --- | --- | --- | --- | --- | --- |
| 2026-10-06 | Proposed | Jens Tirsvad Nielsen | S01 | Initial version | pending |
| 2026-10-06 | Proposed | Jens Tirsvad Nielsen | S01 | Added MIL-004 | pending |
---
## Purpose
Tracks backward/forward links between artifact instances so that the Business Case's
cross-artifact traceability can be measured. A row is added or updated whenever an
artifact instance is created or reviewed.
## Traceability Table
| Artifact Instance | Type | Upstream (Backward Link) | Downstream (Forward Link) | Last Reviewed (RC-ID) |
| --- | --- | --- | --- | --- |
| [SA-001] | Stakeholder Analysis | - | [BC-001] | [RC-002] |
| [BC-001] | Business Case | [SA-001] | [PP-001], [MIL-001], [MIL-002], [MIL-003], [MIL-004] | [RC-001] |
| [PP-001] | Project Plan | [BC-001], [SA-001] | [MIL-001], [MIL-002], [MIL-003], [MIL-004] | - |
| [MIL-001] | Milestone | [BC-001], [PP-001] | - | [RC-003] |
| [MIL-002] | Milestone | [BC-001], [PP-001] | - | [RC-004] |
| [MIL-003] | Milestone | [BC-001], [PP-001] | - | [RC-005] |
| [MIL-004] | Milestone | [BC-001], [PP-001] | - | - |
## Coverage Notes
- `-` in Upstream means foundational; in Downstream, nothing is built on it yet; in Last Reviewed, no `RC-*` exists yet.
- [PP-001] has no QC checklist in the framework, so it has no `RC-*`.
- No use case, domain model, design or data artifacts exist; the plan treats all tasks as plain technical tasks. The source code is covered by the tests, not by an `RC-*`.
---
[SA-001]: ../stakeholder-analysis.md
[BC-001]: ../business-case.md
[PP-001]: ../project-plan.md
[MIL-001]: ../milestones/mil-001-project-setup.md
[MIL-002]: ../milestones/mil-002-coffee-machine-core.md
[MIL-003]: ../milestones/mil-003-quality-and-publication.md
[MIL-004]: ../milestones/mil-004-code-review-and-ci.md
[RC-001]: ./reviews/rc-001-business-case.md
[RC-002]: ./reviews/rc-002-stakeholder-analysis.md
[RC-003]: ./reviews/rc-003-mil-001.md
[RC-004]: ./reviews/rc-004-mil-002.md
[RC-005]: ./reviews/rc-005-mil-003.md
+3 -2
View File
@@ -9,7 +9,8 @@
## Version History
| Date | Status | Author | Reviewer | Change | Commit |
| --- | --- | --- | --- | --- | --- |
| 2026-10-05 | Accepted | Jens Tirsvad Nielsen | S01 | Initial version | [c0c3940] |
| 2026-10-05 | Deprecated | Jens Tirsvad Nielsen | S01 | Initial version | [c0c3940] |
| 2026-10-06 | Accepted | Jens Tirsvad Nielsen | S01 | Recorded S01 sign-off after RC-002 | pending |
---
@@ -70,7 +71,7 @@ Monitor).
| Stakeholder | Decision | Date |
| --- | --- | --- |
| S01 | Pending review | |
| S01 | Go (RC-002) | 2026-10-06 |
---