Compare commits
24
Commits
mil-001-readme
...
main
| Author | SHA1 | Date | |
|---|---|---|---|
|
|
e68e210eb8 | ||
|
|
8ada9ea5cf | ||
|
|
eb037f3ad2 | ||
|
|
69021844af | ||
|
|
c7df22c82a | ||
|
|
865ca9cd35 | ||
|
|
52b972520d | ||
|
|
83f3acdc68 | ||
|
|
2b65618c1a | ||
|
|
861edbfa92 | ||
|
|
71a27ddc1f | ||
|
|
693cfd5b24 | ||
|
|
93928b5f27 | ||
|
|
58116dcb5d | ||
|
|
f192f227e2 | ||
|
|
00d47e244c | ||
|
|
ffffee04f4 | ||
|
|
2b9e46b81f | ||
|
|
8ef00aafaa | ||
|
|
1403dacf0e | ||
|
|
8a0e03a6ff | ||
|
|
9b5eff7163 | ||
|
|
d570489a33 | ||
|
|
0f26d8d91e |
@@ -0,0 +1,26 @@
|
||||
name: CI
|
||||
|
||||
on:
|
||||
push:
|
||||
pull_request:
|
||||
|
||||
jobs:
|
||||
checks:
|
||||
runs-on: ubuntu-latest
|
||||
steps:
|
||||
- uses: actions/checkout@v4
|
||||
- uses: actions/setup-python@v5
|
||||
with:
|
||||
python-version: "3.13"
|
||||
- name: Install
|
||||
run: |
|
||||
python -m pip install --upgrade pip
|
||||
python -m pip install -e ".[dev]"
|
||||
- name: Tests
|
||||
run: python -m pytest
|
||||
- name: Lint
|
||||
run: python -m ruff check src tests
|
||||
- name: Format check
|
||||
run: python -m ruff format --check src tests
|
||||
- name: Types
|
||||
run: python -m mypy src tests
|
||||
@@ -79,6 +79,16 @@ python -m ruff format --check src tests
|
||||
python -m mypy src tests
|
||||
```
|
||||
|
||||
## Continuous integration
|
||||
|
||||
On every push and pull request, `.gitea/workflows/ci.yml` installs the project on
|
||||
Python 3.13 and runs the same checks as above: `pytest`, `ruff check`,
|
||||
`ruff format --check` and `mypy`. To run all of them locally:
|
||||
|
||||
```bash
|
||||
python -m pytest && python -m ruff check src tests && python -m ruff format --check src tests && python -m mypy src tests
|
||||
```
|
||||
|
||||
## Build the source documentation
|
||||
|
||||
The source uses Doxygen comments. The HTML output goes to `docs/doxygen/html`.
|
||||
@@ -93,9 +103,10 @@ doxygen Doxyfile
|
||||
| --- | --- |
|
||||
| `src/coffee_machine/` | The machine: `main.py` (the loop), `constants.py` (menu, coins, starting resources) |
|
||||
| `tests/` | pytest tests |
|
||||
| `docs/` | Planning and review documents (business case, plan, milestones) |
|
||||
| `docs/` | Planning documents (business case, plan, milestones) and SQA review records with the traceability matrix (`docs/sqa/`) |
|
||||
| `pyproject.toml` | Project configuration |
|
||||
| `Doxyfile` | Doxygen configuration |
|
||||
| `.gitea/workflows/` | CI workflow |
|
||||
|
||||
## License
|
||||
|
||||
|
||||
@@ -14,7 +14,9 @@ document of a type. `Primary File` may contain a glob (e.g.
|
||||
| BC | Business Case | docs/business-case.md | 002 |
|
||||
| SA | Stakeholder Analysis | docs/stakeholder-analysis.md | 002 |
|
||||
| PP | Project Plan | docs/project-plan.md | 002 |
|
||||
| MIL | Milestone / Gateway | docs/milestones/*.md | 004 |
|
||||
| MIL | Milestone / Gateway | docs/milestones/*.md | 005 |
|
||||
| RC | SQA Review Record | docs/sqa/reviews/rc-*.md | 010 |
|
||||
| TM | Traceability Matrix | docs/sqa/traceability-matrix.md | 002 |
|
||||
|
||||
## Languages
|
||||
|
||||
|
||||
@@ -9,7 +9,8 @@
|
||||
## Version History
|
||||
| Date | Status | Author | Reviewer | Change | Commit |
|
||||
| --- | --- | --- | --- | --- | --- |
|
||||
| 2026-10-05 | Accepted | Jens Tirsvad Nielsen | S01 | Initial version | [c0c3940] |
|
||||
| 2026-10-06 | Deprecated | Jens Tirsvad Nielsen | S01 | Added objective 6 and scope for code review and CI | [8ef00aa] |
|
||||
| 2026-10-06 | Accepted | Jens Tirsvad Nielsen | S01 | Added success criterion 6 and clarified the Python version (RC-008 actions) | [71a27dd] |
|
||||
|
||||
---
|
||||
|
||||
@@ -45,6 +46,7 @@ participants and for viewers browsing the repository.
|
||||
3. Cover the behaviour with automated pytest tests.
|
||||
4. Document how to set up a local `.venv` and run the program and tests.
|
||||
5. Publish the repository with a description, topics and README.
|
||||
6. Review the source code against the Python quality checklist and run the tests and code checks automatically on every push.
|
||||
|
||||
## Scope
|
||||
|
||||
@@ -55,6 +57,7 @@ participants and for viewers browsing the repository.
|
||||
- `pyproject.toml`, Python `.gitignore`, `Doxyfile`, `README.md`.
|
||||
- Project documents under `docs/`.
|
||||
- Repository description and topics on the git host.
|
||||
- A review record for the source code and a CI workflow (MIL-004).
|
||||
|
||||
### Out of Scope
|
||||
|
||||
@@ -89,6 +92,7 @@ professional project hygiene, and the goal of sharing readable solutions.
|
||||
| 3 | Runtime dependencies | 0 | `pyproject.toml` `dependencies` is empty |
|
||||
| 4 | Setup documented | A new reader can run program and tests from README | README walkthrough |
|
||||
| 5 | Repository metadata | Description and at least 3 topics set | Repository page |
|
||||
| 6 | Code reviewed and checked automatically | Source review record with verdict Go; latest CI run on `main` green | `docs/sqa/reviews/` and the CI run on the git host |
|
||||
|
||||
## Risks
|
||||
|
||||
@@ -105,10 +109,11 @@ professional project hygiene, and the goal of sharing readable solutions.
|
||||
|
||||
## Constraints
|
||||
|
||||
- Python greater than 3.13 as requested, `venv` for environments, pytest for tests.
|
||||
- Python 3.13 or newer (the request says "greater than 3.13"; read as `>=3.13`), `venv` for environments, pytest for tests.
|
||||
- Constants live in `constants.py`.
|
||||
- Source files use Doxygen comments.
|
||||
- Nothing is committed or pushed unless the user asks.
|
||||
- Duration: one week, 2026-10-05 to 2026-10-12.
|
||||
|
||||
## Cost–Benefit Assessment
|
||||
|
||||
@@ -131,4 +136,5 @@ Proceed — the scope is small, well specified and delivers a reusable example.
|
||||
---
|
||||
|
||||
[SA-001]: ./stakeholder-analysis.md
|
||||
[c0c3940]: https://git.tirsystem.com/Tirsvad-Udemy-100_days_of_code/015-coffee_machine/commit/c0c3940551db0d7d96492cc734976d0436051ff9
|
||||
[8ef00aa]: https://git.tirsystem.com/Tirsvad-Udemy-100_days_of_code/015-coffee_machine/commit/8ef00aafaaa193ea565f1a45238d31e963a5e05d
|
||||
[71a27dd]: https://git.tirsystem.com/Tirsvad-Udemy-100_days_of_code/015-coffee_machine/commit/71a27ddc1f5555c1b836b1556fab292ebc9deb62
|
||||
|
||||
@@ -0,0 +1,70 @@
|
||||
# MIL-004 Code Review and CI
|
||||
|
||||
## Metadata
|
||||
| Key | Value |
|
||||
| --- | --- |
|
||||
| ID | MIL-004 |
|
||||
| CrossReference | [BC-001] |
|
||||
|
||||
## Version History
|
||||
| Date | Status | Author | Reviewer | Change | Commit |
|
||||
| --- | --- | --- | --- | --- | --- |
|
||||
| 2026-10-06 | Accepted | Jens Tirsvad Nielsen | S01 | Initial version | [8ef00aa] |
|
||||
|
||||
---
|
||||
|
||||
## Purpose
|
||||
|
||||
Decide whether the source code has been reviewed against the Python quality checklist and is checked automatically on every push.
|
||||
|
||||
## Deliverable
|
||||
|
||||
`RC-006` review record for the source code, fixes for its findings, a CI workflow running the tests and code checks, and a README section describing it.
|
||||
|
||||
## Go / No-Go Criteria
|
||||
|
||||
| # | Criterion (objectively checkable) | Go | No-Go |
|
||||
| --- | --- | --- | --- |
|
||||
| 1 | `docs/sqa/reviews/` has an RC record for the source against `QC-PY-001` | Present with a verdict | Missing |
|
||||
| 2 | Every Fail in that record has a closed action item or a recorded deviation | All handled | Open Fail |
|
||||
| 3 | The CI workflow runs pytest, ruff check, ruff format --check and mypy on push and pull request | All four run | Any missing |
|
||||
| 4 | The latest CI run on `main` is green | Green | Red or none |
|
||||
| 5 | README describes the CI and the matching local commands | Present | Missing |
|
||||
|
||||
## Dependencies
|
||||
|
||||
| Depends on | Reason |
|
||||
| --- | --- |
|
||||
| MIL-003 | Tests and metadata must exist before they are reviewed and automated |
|
||||
|
||||
## Traceability
|
||||
|
||||
| Business Case objective / KPI / user story | Reference |
|
||||
| --- | --- |
|
||||
| Objective 6 (review and CI), Objective 4 | [BC-001] |
|
||||
|
||||
## Ownership
|
||||
|
||||
| Role | Stakeholder ID (SA) |
|
||||
| --- | --- |
|
||||
| Owner | S01 |
|
||||
| Approving reviewer | S01 |
|
||||
|
||||
## Target Date
|
||||
|
||||
2026-10-12 — inside the duration constraint in [BC-001].
|
||||
|
||||
## Tasks
|
||||
|
||||
| # | Task | Summary | Needs its own Use Case/User Story? | Reference |
|
||||
| --- | --- | --- | --- | --- |
|
||||
| 1 | Review source code against QC-PY-001 | Create RC-006 with `new-artifact.sh RC` for `src/` and `tests/` against `framework/qc/qc-programming-python.md`. Criterion 10 (Design Class Diagram) is N-A because no DCD exists. Every Fail becomes an action item. | No | Objective 6 |
|
||||
| 2 | Fix code review findings | Fix each Fail from RC-006 under `src/` and `tests/`, or record a justified deviation in the record. If the review has no Fail, close this task without a code change. | No | Objective 6 |
|
||||
| 3 | Add CI workflow | Add `.gitea/workflows/ci.yml` that sets up Python 3.13, installs `.[dev]`, and runs `pytest`, `ruff check`, `ruff format --check` and `mypy` on push and pull request. Check first that the git host has an Actions runner. | No | Objective 6 |
|
||||
| 4 | Document CI in README | Add a short section to README.md saying what the CI runs and how to run the same checks locally. | No | Objective 4 |
|
||||
| 5 | Update traceability matrix | Add the RC-006 review to `docs/sqa/traceability-matrix.md` and close the milestone's row there. | No | Objective 6 |
|
||||
|
||||
---
|
||||
|
||||
[BC-001]: ../business-case.md
|
||||
[8ef00aa]: https://git.tirsystem.com/Tirsvad-Udemy-100_days_of_code/015-coffee_machine/commit/8ef00aafaaa193ea565f1a45238d31e963a5e05d
|
||||
+18
-10
@@ -4,25 +4,26 @@
|
||||
| Key | Value |
|
||||
| --- | --- |
|
||||
| ID | PP-001 |
|
||||
| CrossReference | [BC-001], [SA-001], [MIL-001], [MIL-002], [MIL-003] |
|
||||
| CrossReference | [BC-001], [SA-001], [MIL-001], [MIL-002], [MIL-003], [MIL-004] |
|
||||
|
||||
## Version History
|
||||
| Date | Status | Author | Reviewer | Change | Commit |
|
||||
| --- | --- | --- | --- | --- | --- |
|
||||
| 2026-10-05 | Accepted | Jens Tirsvad Nielsen | S01 | Initial version | [c0c3940] |
|
||||
| 2026-10-06 | Deprecated | Jens Tirsvad Nielsen | S01 | Added MIL-004 Code Review and CI | [8ef00aa] |
|
||||
| 2026-10-06 | Accepted | Jens Tirsvad Nielsen | S01 | Fixed phase count, dependency overlap and stale risks and open issues (RC-009 actions) | [52b9725] |
|
||||
|
||||
---
|
||||
|
||||
## Purpose
|
||||
|
||||
Schedule the three phases that take the coffee machine from empty repository to
|
||||
published project, within the short assignment timeline in [BC-001].
|
||||
Schedule the four phases that take the coffee machine from empty repository to a
|
||||
reviewed, published project, within the one-week duration in [BC-001].
|
||||
|
||||
## Planning Assumptions
|
||||
|
||||
- Week 1 starts 2026-10-05; the plan ends by 2026-10-12.
|
||||
- Phase length: two to three days; S01 reviews each phase through a pull request (see [SA-001]).
|
||||
- Each phase is one branch and one pull request.
|
||||
- Each phase is delivered through one or more branches and pull requests.
|
||||
|
||||
## Gateway Schedule
|
||||
|
||||
@@ -31,6 +32,7 @@ published project, within the short assignment timeline in [BC-001].
|
||||
| Project Setup | [MIL-001] | 2026-10-05 to 2026-10-07 | 2026-10-07 | S01 | none | Skeleton, tooling, README | [Milestone 40] |
|
||||
| Coffee Machine Core | [MIL-002] | 2026-10-08 to 2026-10-10 | 2026-10-10 | S01 | none | Working program | [Milestone 41] |
|
||||
| Quality and Publication | [MIL-003] | 2026-10-11 to 2026-10-12 | 2026-10-12 | S01 | none | Tests, Doxygen, published repo | [Milestone 42] |
|
||||
| Code Review and CI | [MIL-004] | 2026-10-07 to 2026-10-12 | 2026-10-12 | S01 | none | Source review record, CI workflow | [Milestone 48] |
|
||||
|
||||
```plantuml
|
||||
@startgantt
|
||||
@@ -41,6 +43,8 @@ Project starts 2026-10-05
|
||||
[MIL-001 Go/No-Go] happens 2026-10-07
|
||||
[MIL-002 Go/No-Go] happens 2026-10-10
|
||||
[MIL-003 Go/No-Go] happens 2026-10-12
|
||||
[Code Review and CI] starts 2026-10-07 and ends 2026-10-12
|
||||
[MIL-004 Go/No-Go] happens 2026-10-12
|
||||
@endgantt
|
||||
```
|
||||
|
||||
@@ -53,27 +57,28 @@ Project starts 2026-10-05
|
||||
| `pyproject.toml`, `.gitignore`, `Doxyfile`, README | [MIL-001] |
|
||||
| Project documents | Planning, before [MIL-001] |
|
||||
| Repository description and topics | [MIL-003] |
|
||||
| Source code review record and CI workflow | [MIL-004] |
|
||||
|
||||
## Dependencies
|
||||
|
||||
```
|
||||
MIL-001 -> MIL-002 -> MIL-003
|
||||
MIL-001 -> MIL-002 -> MIL-003 -> MIL-004
|
||||
```
|
||||
|
||||
[MIL-004] may start once the [MIL-003] tests are merged, so their windows overlap; its decision follows the decision of [MIL-003].
|
||||
|
||||
A No-Go moves all later dates by the same amount.
|
||||
|
||||
## Plan Risks
|
||||
|
||||
| Risk | Impact | Mitigation |
|
||||
| --- | --- | --- |
|
||||
| README template not supplied | README task blocked | Ask S01 for the template before the task |
|
||||
| The git host has no Actions runner | CI cannot run | Check the host first; if none, keep the workflow file and document the local commands |
|
||||
| Doxygen not installed locally | Cannot verify docs | Document the install step in README |
|
||||
|
||||
## Open Issues
|
||||
|
||||
- The README template referenced in the request ("template below") was not included.
|
||||
- No use cases or user stories are written; tasks are plain technical tasks implementing the assignment specification. S01 can ask for a use case ("Order a drink") if wanted.
|
||||
- Python ">3.13" is read as 3.13 or newer (`>=3.13`).
|
||||
|
||||
---
|
||||
|
||||
@@ -82,7 +87,10 @@ A No-Go moves all later dates by the same amount.
|
||||
[MIL-001]: ./milestones/mil-001-project-setup.md
|
||||
[MIL-002]: ./milestones/mil-002-coffee-machine-core.md
|
||||
[MIL-003]: ./milestones/mil-003-quality-and-publication.md
|
||||
[MIL-004]: ./milestones/mil-004-code-review-and-ci.md
|
||||
[Milestone 40]: https://git.tirsystem.com/Tirsvad-Udemy-100_days_of_code/015-coffee_machine/milestone/40
|
||||
[Milestone 41]: https://git.tirsystem.com/Tirsvad-Udemy-100_days_of_code/015-coffee_machine/milestone/41
|
||||
[Milestone 42]: https://git.tirsystem.com/Tirsvad-Udemy-100_days_of_code/015-coffee_machine/milestone/42
|
||||
[c0c3940]: https://git.tirsystem.com/Tirsvad-Udemy-100_days_of_code/015-coffee_machine/commit/c0c3940551db0d7d96492cc734976d0436051ff9
|
||||
[8ef00aa]: https://git.tirsystem.com/Tirsvad-Udemy-100_days_of_code/015-coffee_machine/commit/8ef00aafaaa193ea565f1a45238d31e963a5e05d
|
||||
[Milestone 48]: https://git.tirsystem.com/Tirsvad-Udemy-100_days_of_code/015-coffee_machine/milestone/48
|
||||
[52b9725]: https://git.tirsystem.com/Tirsvad-Udemy-100_days_of_code/015-coffee_machine/commit/52b972520d33dc3b50f1c050d874aaeb7293a557
|
||||
|
||||
@@ -0,0 +1,49 @@
|
||||
# RC-001 Business Case Review
|
||||
|
||||
## Metadata
|
||||
| Key | Value |
|
||||
| --- | --- |
|
||||
| ID | RC-001 |
|
||||
| CrossReference | [BC-001], [QC-BC-001] |
|
||||
|
||||
## Version History
|
||||
| Date | Status | Author | Reviewer | Change | Commit |
|
||||
| --- | --- | --- | --- | --- | --- |
|
||||
| 2026-10-06 | Accepted | Jens Tirsvad Nielsen | S01 | Initial version | [8ef00aa] |
|
||||
|
||||
---
|
||||
|
||||
## Artifact Under Review
|
||||
|
||||
- Instance reviewed: [BC-001] (docs/business-case.md)
|
||||
- Checklist used: [QC-BC-001] (`QC-BC-001`)
|
||||
- Independence: S01 is the only stakeholder and is also the recorded author, so the reviewer-is-not-author rule cannot be met. The documents were drafted by Claude on S01's behalf; S01 reviews and signs. This is a known limit of a one-person project, not a clean independent review.
|
||||
|
||||
## Checklist Results
|
||||
|
||||
| # | Criterion | Status | Evidence/Notes |
|
||||
| --- | --- | --- | --- |
|
||||
| 1 | ROI/Cost-Benefit analysis is quantitative, or where qualitative, is explicitly justified | Pass | Cost-Benefit table is explicitly qualitative and says why (no money involved). |
|
||||
| 2 | Risks are identified with documented impact and mitigation | Pass | Three risks, each with impact and mitigation. |
|
||||
| 3 | Success criteria are measurable, stating explicit targets rather than vague aspirations | Pass | Five criteria with targets and a measure each. |
|
||||
| 4 | Scope explicitly separates In Scope vs Out of Scope | Pass | `### In Scope` and `### Out of Scope` are separate. |
|
||||
| 5 | Stakeholders are cross-referenced to Stakeholder Analysis IDs rather than re-described inline | Pass | Stakeholders table cites S01 to S03 only; no roles are re-described. |
|
||||
| 6 | Methodology and quality-standard foundation are stated explicitly (e.g. ISO/IEC 25010, Larman) | Pass | Methodology section names the framework, ISO/IEC 25010:2023 and the coding conventions. |
|
||||
| 7 | Assumptions and constraints are explicit and clearly distinguished from one another | Pass | Fixed in v2: the first draft had no duration, although MIL-001 to MIL-003 and PP-001 cite one. Constraints now state 2026-10-05 to 2026-10-12. |
|
||||
| 8 | Document supports executive decision-making with a clear, unambiguous recommendation | Pass | Recommendation is a single "Proceed" with a reason. |
|
||||
|
||||
## Overall Verdict
|
||||
|
||||
Go — all mandatory criteria pass. Criterion 7 first failed (missing duration constraint) and was fixed in the same change as BC-001 v2.
|
||||
|
||||
## Action Items
|
||||
|
||||
| Action | Owner | Due |
|
||||
| --- | --- | --- |
|
||||
| Add the duration constraint to BC-001 (done in v2) | S01 | 2026-10-06 |
|
||||
|
||||
---
|
||||
|
||||
[BC-001]: ../../business-case.md
|
||||
[QC-BC-001]: ../../../framework/qc/qc-business-case.md
|
||||
[8ef00aa]: https://git.tirsystem.com/Tirsvad-Udemy-100_days_of_code/015-coffee_machine/commit/8ef00aafaaa193ea565f1a45238d31e963a5e05d
|
||||
@@ -0,0 +1,49 @@
|
||||
# RC-002 Stakeholder Analysis Review
|
||||
|
||||
## Metadata
|
||||
| Key | Value |
|
||||
| --- | --- |
|
||||
| ID | RC-002 |
|
||||
| CrossReference | [SA-001], [QC-SA-001] |
|
||||
|
||||
## Version History
|
||||
| Date | Status | Author | Reviewer | Change | Commit |
|
||||
| --- | --- | --- | --- | --- | --- |
|
||||
| 2026-10-06 | Accepted | Jens Tirsvad Nielsen | S01 | Initial version | [8ef00aa] |
|
||||
|
||||
---
|
||||
|
||||
## Artifact Under Review
|
||||
|
||||
- Instance reviewed: [SA-001] (docs/stakeholder-analysis.md)
|
||||
- Checklist used: [QC-SA-001] (`QC-SA-001`)
|
||||
- Independence: S01 is the only stakeholder and is also the recorded author, so the reviewer-is-not-author rule cannot be met. The documents were drafted by Claude on S01's behalf; S01 reviews and signs. This is a known limit of a one-person project, not a clean independent review.
|
||||
|
||||
## Checklist Results
|
||||
|
||||
| # | Criterion | Status | Evidence/Notes |
|
||||
| --- | --- | --- | --- |
|
||||
| 1 | Power/Interest grid is filled for every stakeholder, with no gaps or unclassified entries | Pass | S01 to S03 each have power, interest and quadrant. |
|
||||
| 2 | Each stakeholder is assigned a unique, stable ID (e.g. S01-S11 style) reusable for RACI assignments in other artifacts | Pass | IDs S01 to S03 are used by every other document. |
|
||||
| 3 | Roles and organizational context are defined with explicit Power and Interest levels, not just narrative description | Pass | Levels are stated as High/Low in the table, with organisation and role. |
|
||||
| 4 | Communication needs (channel, frequency, deliverable type) are mapped to project phases or milestones | Pass | Communication table maps each stakeholder to MIL-001 to MIL-003. |
|
||||
| 5 | Conflicting stakeholder interests are identified with documented mitigation or resolution strategies | Pass | One conflict (assignment names vs testable structure) with a mitigation. |
|
||||
| 6 | Stakeholder concerns are explicitly traced to Business Case objectives | Pass | Traceability table maps each stakeholder to [BC-001] objectives. |
|
||||
| 7 | Primary concerns are expressed in both business language and a recognized quality-attribute mapping (e.g. FURPS+) | Pass | Each concern has a FURPS+ attribute. |
|
||||
| 8 | Document is understandable and navigable by non-technical stakeholders reviewing their own entry | Pass | Plain language, short; each stakeholder can find their own row. |
|
||||
|
||||
## Overall Verdict
|
||||
|
||||
Go — all criteria pass. The Sign-Off row said `Pending review` and was updated to the Go in SA-001 v2.
|
||||
|
||||
## Action Items
|
||||
|
||||
| Action | Owner | Due |
|
||||
| --- | --- | --- |
|
||||
| Record the sign-off in SA-001 (done in v2) | S01 | 2026-10-06 |
|
||||
|
||||
---
|
||||
|
||||
[SA-001]: ../../stakeholder-analysis.md
|
||||
[QC-SA-001]: ../../../framework/qc/qc-stakeholder-analysis.md
|
||||
[8ef00aa]: https://git.tirsystem.com/Tirsvad-Udemy-100_days_of_code/015-coffee_machine/commit/8ef00aafaaa193ea565f1a45238d31e963a5e05d
|
||||
@@ -0,0 +1,47 @@
|
||||
# RC-003 MIL-001 Review
|
||||
|
||||
## Metadata
|
||||
| Key | Value |
|
||||
| --- | --- |
|
||||
| ID | RC-003 |
|
||||
| CrossReference | [MIL-001], [QC-MIL-001] |
|
||||
|
||||
## Version History
|
||||
| Date | Status | Author | Reviewer | Change | Commit |
|
||||
| --- | --- | --- | --- | --- | --- |
|
||||
| 2026-10-06 | Accepted | Jens Tirsvad Nielsen | S01 | Initial version | [8ef00aa] |
|
||||
|
||||
---
|
||||
|
||||
## Artifact Under Review
|
||||
|
||||
- Instance reviewed: [MIL-001] (docs/milestones/mil-001-project-setup.md)
|
||||
- Checklist used: [QC-MIL-001] (`QC-MIL-001`)
|
||||
- Independence: S01 is the only stakeholder and is also the recorded author, so the reviewer-is-not-author rule cannot be met. The documents were drafted by Claude on S01's behalf; S01 reviews and signs. This is a known limit of a one-person project, not a clean independent review.
|
||||
|
||||
## Checklist Results
|
||||
|
||||
| # | Criterion | Status | Evidence/Notes |
|
||||
| --- | --- | --- | --- |
|
||||
| 1 | A concrete deliverable is defined for every gate | Pass | Deliverable section names the concrete output. |
|
||||
| 2 | Explicit Go/No-Go criteria are stated for each gate | Pass | Go/No-Go table with one checkable criterion per row. |
|
||||
| 3 | Dependencies on other milestones are explicitly mapped | Pass | Dependencies table present. |
|
||||
| 4 | Each milestone is traceable to a Business Case objective or KPI | Pass | Traceability cites the Business Case objectives. |
|
||||
| 5 | Milestone owner and approving reviewer are identified | Pass | Ownership names S01 as owner and approving reviewer (same person; see independence note). |
|
||||
| 6 | Milestone has a defined target date consistent with project constraints | Pass | Target date lies inside the duration constraint added to BC-001 in RC-001's action (2026-10-05 to 2026-10-12). Before that fix this was a Fail. |
|
||||
|
||||
## Overall Verdict
|
||||
|
||||
Go — all criteria pass. Delivery matches: issues #1 to #5 closed, PRs 19 and 20 merged.
|
||||
|
||||
## Action Items
|
||||
|
||||
| Action | Owner | Due |
|
||||
| --- | --- | --- |
|
||||
| None | S01 | - |
|
||||
|
||||
---
|
||||
|
||||
[MIL-001]: ../../milestones/mil-001-project-setup.md
|
||||
[QC-MIL-001]: ../../../framework/qc/qc-milestones-gateways.md
|
||||
[8ef00aa]: https://git.tirsystem.com/Tirsvad-Udemy-100_days_of_code/015-coffee_machine/commit/8ef00aafaaa193ea565f1a45238d31e963a5e05d
|
||||
@@ -0,0 +1,47 @@
|
||||
# RC-004 MIL-002 Review
|
||||
|
||||
## Metadata
|
||||
| Key | Value |
|
||||
| --- | --- |
|
||||
| ID | RC-004 |
|
||||
| CrossReference | [MIL-002], [QC-MIL-001] |
|
||||
|
||||
## Version History
|
||||
| Date | Status | Author | Reviewer | Change | Commit |
|
||||
| --- | --- | --- | --- | --- | --- |
|
||||
| 2026-10-06 | Accepted | Jens Tirsvad Nielsen | S01 | Initial version | [8ef00aa] |
|
||||
|
||||
---
|
||||
|
||||
## Artifact Under Review
|
||||
|
||||
- Instance reviewed: [MIL-002] (docs/milestones/mil-002-coffee-machine-core.md)
|
||||
- Checklist used: [QC-MIL-001] (`QC-MIL-001`)
|
||||
- Independence: S01 is the only stakeholder and is also the recorded author, so the reviewer-is-not-author rule cannot be met. The documents were drafted by Claude on S01's behalf; S01 reviews and signs. This is a known limit of a one-person project, not a clean independent review.
|
||||
|
||||
## Checklist Results
|
||||
|
||||
| # | Criterion | Status | Evidence/Notes |
|
||||
| --- | --- | --- | --- |
|
||||
| 1 | A concrete deliverable is defined for every gate | Pass | Deliverable section names the concrete output. |
|
||||
| 2 | Explicit Go/No-Go criteria are stated for each gate | Pass | Go/No-Go table with one checkable criterion per row. |
|
||||
| 3 | Dependencies on other milestones are explicitly mapped | Pass | Dependencies table present. |
|
||||
| 4 | Each milestone is traceable to a Business Case objective or KPI | Pass | Traceability cites the Business Case objectives. |
|
||||
| 5 | Milestone owner and approving reviewer are identified | Pass | Ownership names S01 as owner and approving reviewer (same person; see independence note). |
|
||||
| 6 | Milestone has a defined target date consistent with project constraints | Pass | Target date lies inside the duration constraint added to BC-001 in RC-001's action (2026-10-05 to 2026-10-12). Before that fix this was a Fail. |
|
||||
|
||||
## Overall Verdict
|
||||
|
||||
Go — all criteria pass. Delivery matches: issues #6 to #12 closed, PR 21 merged. Note: Go/No-Go rows refer to the assignment's behaviour; the exact texts are asserted in tests/.
|
||||
|
||||
## Action Items
|
||||
|
||||
| Action | Owner | Due |
|
||||
| --- | --- | --- |
|
||||
| None | S01 | - |
|
||||
|
||||
---
|
||||
|
||||
[MIL-002]: ../../milestones/mil-002-coffee-machine-core.md
|
||||
[QC-MIL-001]: ../../../framework/qc/qc-milestones-gateways.md
|
||||
[8ef00aa]: https://git.tirsystem.com/Tirsvad-Udemy-100_days_of_code/015-coffee_machine/commit/8ef00aafaaa193ea565f1a45238d31e963a5e05d
|
||||
@@ -0,0 +1,47 @@
|
||||
# RC-005 MIL-003 Review
|
||||
|
||||
## Metadata
|
||||
| Key | Value |
|
||||
| --- | --- |
|
||||
| ID | RC-005 |
|
||||
| CrossReference | [MIL-003], [QC-MIL-001] |
|
||||
|
||||
## Version History
|
||||
| Date | Status | Author | Reviewer | Change | Commit |
|
||||
| --- | --- | --- | --- | --- | --- |
|
||||
| 2026-10-06 | Accepted | Jens Tirsvad Nielsen | S01 | Initial version | [8ef00aa] |
|
||||
|
||||
---
|
||||
|
||||
## Artifact Under Review
|
||||
|
||||
- Instance reviewed: [MIL-003] (docs/milestones/mil-003-quality-and-publication.md)
|
||||
- Checklist used: [QC-MIL-001] (`QC-MIL-001`)
|
||||
- Independence: S01 is the only stakeholder and is also the recorded author, so the reviewer-is-not-author rule cannot be met. The documents were drafted by Claude on S01's behalf; S01 reviews and signs. This is a known limit of a one-person project, not a clean independent review.
|
||||
|
||||
## Checklist Results
|
||||
|
||||
| # | Criterion | Status | Evidence/Notes |
|
||||
| --- | --- | --- | --- |
|
||||
| 1 | A concrete deliverable is defined for every gate | Pass | Deliverable section names the concrete output. |
|
||||
| 2 | Explicit Go/No-Go criteria are stated for each gate | Pass | Go/No-Go table with one checkable criterion per row. |
|
||||
| 3 | Dependencies on other milestones are explicitly mapped | Pass | Dependencies table present. |
|
||||
| 4 | Each milestone is traceable to a Business Case objective or KPI | Pass | Traceability cites the Business Case objectives. |
|
||||
| 5 | Milestone owner and approving reviewer are identified | Pass | Ownership names S01 as owner and approving reviewer (same person; see independence note). |
|
||||
| 6 | Milestone has a defined target date consistent with project constraints | Pass | Target date lies inside the duration constraint added to BC-001 in RC-001's action (2026-10-05 to 2026-10-12). Before that fix this was a Fail. |
|
||||
|
||||
## Overall Verdict
|
||||
|
||||
Go — all criteria pass. Delivery matches: issues #13 to #17 closed, PR 22 merged.
|
||||
|
||||
## Action Items
|
||||
|
||||
| Action | Owner | Due |
|
||||
| --- | --- | --- |
|
||||
| None | S01 | - |
|
||||
|
||||
---
|
||||
|
||||
[MIL-003]: ../../milestones/mil-003-quality-and-publication.md
|
||||
[QC-MIL-001]: ../../../framework/qc/qc-milestones-gateways.md
|
||||
[8ef00aa]: https://git.tirsystem.com/Tirsvad-Udemy-100_days_of_code/015-coffee_machine/commit/8ef00aafaaa193ea565f1a45238d31e963a5e05d
|
||||
@@ -0,0 +1,54 @@
|
||||
# RC-006 Source Code Review
|
||||
|
||||
## Metadata
|
||||
| Key | Value |
|
||||
| --- | --- |
|
||||
| ID | RC-006 |
|
||||
| CrossReference | [MIL-004], [QC-PY-001] |
|
||||
|
||||
## Version History
|
||||
| Date | Status | Author | Reviewer | Change | Commit |
|
||||
| --- | --- | --- | --- | --- | --- |
|
||||
| 2026-10-06 | Accepted | Jens Tirsvad Nielsen | S01 | Initial version | [00d47e2] |
|
||||
|
||||
---
|
||||
|
||||
## Artifact Under Review
|
||||
|
||||
- Instance reviewed: `src/coffee_machine/` and `tests/` at the state of MIL-003 (`main` after PR 22)
|
||||
- Checklist used: [QC-PY-001] (`QC-PY-001`)
|
||||
- Independence: S01 is the only stakeholder and is also the recorded author, so the reviewer-is-not-author rule cannot be met. The code and documents were written by Claude on S01's behalf; S01 reviews and signs. This is a known limit of a one-person project, not a clean independent review.
|
||||
|
||||
## Checklist Results
|
||||
|
||||
| # | Criterion | Status | Evidence/Notes |
|
||||
| --- | --- | --- | --- |
|
||||
| 1 | Packages, modules, functions, variables, classes and constants follow PEP 8 casing (`snake_case`, `PascalCase`, `UPPER_SNAKE`) | Pass | Modules, functions and variables are `snake_case`, constants `UPPER_SNAKE`, `Drink` is `PascalCase`. |
|
||||
| 2 | Names state purpose in the domain's language; no unexplained abbreviations, no single-letter names outside tiny scopes | Pass | Names state purpose (`is_resource_sufficient`, `process_coins`); the only short names are loop variables. |
|
||||
| 3 | Code is produced by the project's formatter and passes its linter with no unexplained suppressions | Pass | `ruff check` and `ruff format --check` pass; no suppression comments. |
|
||||
| 4 | Every function and method signature is type-annotated, including `-> None` | Pass | Every function, including tests and the nested `feed`, is annotated. |
|
||||
| 5 | No bare `except:`, no swallowed exceptions; specific exceptions are raised and the cause is kept (`raise ... from`) | Pass | No bare `except`. `_ask_coin_count` catches only `ValueError` and answers it by asking again, so nothing is swallowed. |
|
||||
| 6 | No mutable default arguments and no shadowed builtins | Pass | No mutable defaults; no builtin is shadowed. |
|
||||
| 7 | Files, locks and connections are managed with context managers | N-A | The program opens no files, locks or connections. |
|
||||
| 8 | Public modules, classes and functions have docstrings that say what, not how | Pass | All modules, public functions and tests have Doxygen docstrings that say what the code does. |
|
||||
| 9 | Logging uses `logging`, not `print`; no secrets or personal data in log output | N-A | No logging exists. `print` is the program's own console output, not diagnostics. |
|
||||
| 10 | Classes and operations trace to the Design Class Diagram they implement; deviations are recorded | N-A | No Design Class Diagram exists; the plan treats the work as plain technical tasks. |
|
||||
| 11 | Tests exist for new behaviour, are named for the behaviour, and do not depend on order or the network | Pass | 19 tests named for behaviour, independent of order, no network. |
|
||||
| 12 | Type checker runs in strict mode without errors; `Any` is justified in a comment | Pass | `mypy --strict` runs clean and `Any` is not used. |
|
||||
| 13 | Dependencies are declared and pinned in the project's dependency file, none unused | Fail | Runtime dependencies: none. The dev tools had no lower bounds for ruff and mypy; fixed by action item 1, which sets `pytest>=9`, `ruff>=0.16`, `mypy>=2.4` (the tested versions). |
|
||||
|
||||
## Overall Verdict
|
||||
|
||||
Go — every mandatory criterion passes or is N-A. The one Fail (13) is optional and is fixed in the same change by issue #25.
|
||||
|
||||
## Action Items
|
||||
|
||||
| Action | Owner | Due |
|
||||
| --- | --- | --- |
|
||||
| Set lower bounds for the dev dependencies in pyproject.toml (done) | S01 | 2026-10-06 |
|
||||
|
||||
---
|
||||
|
||||
[MIL-004]: ../../milestones/mil-004-code-review-and-ci.md
|
||||
[QC-PY-001]: ../../../framework/qc/qc-programming-python.md
|
||||
[00d47e2]: https://git.tirsystem.com/Tirsvad-Udemy-100_days_of_code/015-coffee_machine/commit/00d47e244c82007bbc55e18312649189b175ec10
|
||||
@@ -0,0 +1,47 @@
|
||||
# RC-007 MIL-004 Review
|
||||
|
||||
## Metadata
|
||||
| Key | Value |
|
||||
| --- | --- |
|
||||
| ID | RC-007 |
|
||||
| CrossReference | [MIL-004], [QC-MIL-001] |
|
||||
|
||||
## Version History
|
||||
| Date | Status | Author | Reviewer | Change | Commit |
|
||||
| --- | --- | --- | --- | --- | --- |
|
||||
| 2026-10-06 | Accepted | Jens Tirsvad Nielsen | S01 | Initial version | [00d47e2] |
|
||||
|
||||
---
|
||||
|
||||
## Artifact Under Review
|
||||
|
||||
- Instance reviewed: [MIL-004] (docs/milestones/mil-004-code-review-and-ci.md)
|
||||
- Checklist used: [QC-MIL-001] (`QC-MIL-001`)
|
||||
- Independence: S01 is the only stakeholder and is also the recorded author, so the reviewer-is-not-author rule cannot be met. The code and documents were written by Claude on S01's behalf; S01 reviews and signs. This is a known limit of a one-person project, not a clean independent review.
|
||||
|
||||
## Checklist Results
|
||||
|
||||
| # | Criterion | Status | Evidence/Notes |
|
||||
| --- | --- | --- | --- |
|
||||
| 1 | A concrete deliverable is defined for every gate | Pass | Deliverable names the RC record, the fixes, the CI workflow and the README section. |
|
||||
| 2 | Explicit Go/No-Go criteria are stated for each gate | Pass | Five Go/No-Go rows, each checkable (a record exists, a workflow runs four commands, a run is green). |
|
||||
| 3 | Dependencies on other milestones are explicitly mapped | Pass | Depends on MIL-003 with a reason. |
|
||||
| 4 | Each milestone is traceable to a Business Case objective or KPI | Pass | Traceability cites Business Case objective 6 and 4. |
|
||||
| 5 | Milestone owner and approving reviewer are identified | Pass | Owner and approving reviewer are S01 (same person; see independence note). |
|
||||
| 6 | Milestone has a defined target date consistent with project constraints | Pass | Target date 2026-10-12 lies inside the duration constraint in the Business Case. |
|
||||
|
||||
## Overall Verdict
|
||||
|
||||
Go — all criteria pass.
|
||||
|
||||
## Action Items
|
||||
|
||||
| Action | Owner | Due |
|
||||
| --- | --- | --- |
|
||||
| None | S01 | - |
|
||||
|
||||
---
|
||||
|
||||
[MIL-004]: ../../milestones/mil-004-code-review-and-ci.md
|
||||
[QC-MIL-001]: ../../../framework/qc/qc-milestones-gateways.md
|
||||
[00d47e2]: https://git.tirsystem.com/Tirsvad-Udemy-100_days_of_code/015-coffee_machine/commit/00d47e244c82007bbc55e18312649189b175ec10
|
||||
@@ -0,0 +1,52 @@
|
||||
# RC-008 Business Case v3 Review
|
||||
|
||||
## Metadata
|
||||
| Key | Value |
|
||||
| --- | --- |
|
||||
| ID | RC-008 |
|
||||
| CrossReference | [BC-001], [QC-BC-001] |
|
||||
|
||||
## Version History
|
||||
| Date | Status | Author | Reviewer | Change | Commit |
|
||||
| --- | --- | --- | --- | --- | --- |
|
||||
| 2026-10-06 | Accepted | Jens Tirsvad Nielsen | S01 | Initial version | [861edbf] |
|
||||
|
||||
---
|
||||
|
||||
## Artifact Under Review
|
||||
|
||||
- Instance reviewed: [BC-001] (docs/business-case.md, version 3 as reviewed; version 4 after the actions below)
|
||||
- Checklist used: [QC-BC-001] (`QC-BC-001`)
|
||||
- Independence: S01 is the only stakeholder and is also the recorded author, so the reviewer-is-not-author rule cannot be met. The document was written by Claude on S01's behalf; S01 reviews and signs. This is a known limit of a one-person project, not a clean independent review.
|
||||
- This record re-reviews the Business Case after version 3 added objective 6 and scope for code review and CI. It follows [RC-001], which reviewed version 2.
|
||||
|
||||
## Checklist Results
|
||||
|
||||
| # | Criterion | Status | Evidence/Notes |
|
||||
| --- | --- | --- | --- |
|
||||
| 1 | ROI/Cost-Benefit analysis is quantitative, or where qualitative, is explicitly justified | Pass | Cost-Benefit table is explicitly qualitative and says why. |
|
||||
| 2 | Risks are identified with documented impact and mitigation | Pass | Three risks, each with impact and mitigation. No new risk comes from objective 6. |
|
||||
| 3 | Success criteria are measurable, stating explicit targets rather than vague aspirations | Pass | Fixed in v4: objective 6 (review and CI) had no success criterion. Criterion 6 now has a target and a measure; criteria 1 to 6 are all measurable. |
|
||||
| 4 | Scope explicitly separates In Scope vs Out of Scope | Pass | `### In Scope` and `### Out of Scope` are separate; v3 added the review and CI line to In Scope and nothing contradicts Out of Scope. |
|
||||
| 5 | Stakeholders are cross-referenced to Stakeholder Analysis IDs rather than re-described inline | Pass | Stakeholders table cites S01 to S03 only. |
|
||||
| 6 | Methodology and quality-standard foundation are stated explicitly (e.g. ISO/IEC 25010, Larman) | Pass | Methodology section names the framework, ISO/IEC 25010:2023 and the coding conventions. |
|
||||
| 7 | Assumptions and constraints are explicit and clearly distinguished from one another | Pass | Fixed in v4: the Assumption said "3.13 or newer" but the Constraint said "greater than 3.13". The Constraint now states the reading (`>=3.13`). The duration constraint added after RC-001 is still present. |
|
||||
| 8 | Document supports executive decision-making with a clear, unambiguous recommendation | Pass | Recommendation is a single "Proceed" with a reason. |
|
||||
|
||||
## Overall Verdict
|
||||
|
||||
Go — all mandatory criteria pass. Two defects were found in version 3 (no success criterion for objective 6; conflicting wording of the Python version) and fixed in the same change as BC-001 v4.
|
||||
|
||||
## Action Items
|
||||
|
||||
| Action | Owner | Due |
|
||||
| --- | --- | --- |
|
||||
| Add success criterion 6 for objective 6 (done in v4) | S01 | 2026-10-06 |
|
||||
| State the Python version reading in the constraint (done in v4) | S01 | 2026-10-06 |
|
||||
|
||||
---
|
||||
|
||||
[BC-001]: ../../business-case.md
|
||||
[QC-BC-001]: ../../../framework/qc/qc-business-case.md
|
||||
[RC-001]: ./rc-001-business-case.md
|
||||
[861edbf]: https://git.tirsystem.com/Tirsvad-Udemy-100_days_of_code/015-coffee_machine/commit/861edbfa92ed8b28b018c44ffd05a0b1eed035b5
|
||||
@@ -0,0 +1,54 @@
|
||||
# RC-009 Project Plan v2 Review
|
||||
|
||||
## Metadata
|
||||
| Key | Value |
|
||||
| --- | --- |
|
||||
| ID | RC-009 |
|
||||
| CrossReference | [PP-001] |
|
||||
|
||||
## Version History
|
||||
| Date | Status | Author | Reviewer | Change | Commit |
|
||||
| --- | --- | --- | --- | --- | --- |
|
||||
| 2026-10-06 | Accepted | Jens Tirsvad Nielsen | S01 | Initial version | [52b9725] |
|
||||
|
||||
---
|
||||
|
||||
## Artifact Under Review
|
||||
|
||||
- Instance reviewed: [PP-001] (docs/project-plan.md, version 2 as reviewed; version 3 after the actions below)
|
||||
- Checklist used: none. The framework has no QC checklist for the Project Plan. The criteria below are taken from the required sections and the "Validating" note in the framework's Project Plan reference ([PP-reference]); they are an ad hoc list, not a `QC-*` checklist.
|
||||
- Independence: S01 is the only stakeholder and is also the recorded author, so the reviewer-is-not-author rule cannot be met. The document was written by Claude on S01's behalf; S01 reviews and signs. This is a known limit of a one-person project, not a clean independent review.
|
||||
|
||||
## Checklist Results
|
||||
|
||||
| # | Criterion | Status | Evidence/Notes |
|
||||
| --- | --- | --- | --- |
|
||||
| 1 | Purpose states what is scheduled and over what constraint | Pass | Fixed in v3: it said "three phases" and "short assignment timeline"; it now says four phases and the one-week duration in [BC-001]. |
|
||||
| 2 | Planning assumptions give the start date and phase length, consistent with the Business Case duration | Pass | Start 2026-10-05, end 2026-10-12, as in the Business Case duration constraint. Fixed in v3: "one branch and one pull request per phase" did not match what happened. |
|
||||
| 3 | Gateway Schedule has one row per MIL-* document, with its Milestone link once synced | Pass | Four rows for MIL-001 to MIL-004; Milestones 40, 41, 42 and 48 are linked. |
|
||||
| 4 | Timeline diagram has one bar per phase and a marker per Go/No-Go decision | Pass | Four bars and four markers. The diagram was not rendered: no PlantUML server is configured. |
|
||||
| 5 | Scope Coverage maps every Business Case scope item to a gateway | Pass | All six In Scope items of BC-001 v4 map to MIL-001 to MIL-004 or to planning. |
|
||||
| 6 | Dependencies state the gateway order and what a No-Go does to later dates | Pass | Fixed in v3: the chain said MIL-004 follows MIL-003 but the windows overlap. The text now says MIL-004 may start once the MIL-003 tests are merged. |
|
||||
| 7 | Plan risks are specific to the plan and each has a mitigation | Pass | Fixed in v3: the "README template not supplied" risk was resolved and was removed. Two risks remain, each with a mitigation. |
|
||||
| 8 | Open Issues lists only unresolved items | Pass | Fixed in v3: the README template and the Python version reading were resolved (README written; BC-001 v4 states the reading). One open item remains: the optional use case. |
|
||||
| 9 | CrossReference cites the Business Case, the Stakeholder Analysis and every MIL-* document, and the links are defined | Pass | BC-001, SA-001 and MIL-001 to MIL-004 are cited and defined. |
|
||||
| 10 | Windows and decision dates agree with each MIL-* Target Date and the Business Case duration | Pass | Decision dates 2026-10-07, 10-10, 10-12, 10-12 equal the Target Dates; all lie inside 2026-10-05 to 2026-10-12. |
|
||||
|
||||
## Overall Verdict
|
||||
|
||||
Go — every criterion passes. Five defects were found in version 2 (wrong phase count, wrong delivery assumption, dependency and window overlap, a resolved risk, resolved open issues) and fixed in the same change as PP-001 v3.
|
||||
|
||||
## Action Items
|
||||
|
||||
| Action | Owner | Due |
|
||||
| --- | --- | --- |
|
||||
| Correct the phase count and the delivery assumption (done in v3) | S01 | 2026-10-06 |
|
||||
| State the MIL-003/MIL-004 overlap in Dependencies (done in v3) | S01 | 2026-10-06 |
|
||||
| Remove the resolved risk and open issues (done in v3) | S01 | 2026-10-06 |
|
||||
| Ask the framework to add a QC checklist for the Project Plan (upstream) | S01 | - |
|
||||
|
||||
---
|
||||
|
||||
[PP-001]: ../../project-plan.md
|
||||
[PP-reference]: ../../../framework/.agents/skills/artifact/references/PP.md
|
||||
[52b9725]: https://git.tirsystem.com/Tirsvad-Udemy-100_days_of_code/015-coffee_machine/commit/52b972520d33dc3b50f1c050d874aaeb7293a557
|
||||
@@ -0,0 +1,60 @@
|
||||
# Traceability Matrix
|
||||
|
||||
## Metadata
|
||||
| Key | Value |
|
||||
| --- | --- |
|
||||
| ID | TM-001 |
|
||||
| CrossReference | [BC-001] |
|
||||
|
||||
## Version History
|
||||
| Date | Status | Author | Reviewer | Change | Commit |
|
||||
| --- | --- | --- | --- | --- | --- |
|
||||
| 2026-10-06 | Deprecated | Jens Tirsvad Nielsen | S01 | Business Case last reviewed in RC-008 | [71a27dd] |
|
||||
| 2026-10-06 | Accepted | Jens Tirsvad Nielsen | S01 | Project Plan last reviewed in RC-009 | [52b9725] |
|
||||
|
||||
---
|
||||
|
||||
## Purpose
|
||||
|
||||
Tracks backward/forward links between artifact instances so that the Business Case's
|
||||
cross-artifact traceability can be measured. A row is added or updated whenever an
|
||||
artifact instance is created or reviewed.
|
||||
|
||||
## Traceability Table
|
||||
|
||||
| Artifact Instance | Type | Upstream (Backward Link) | Downstream (Forward Link) | Last Reviewed (RC-ID) |
|
||||
| --- | --- | --- | --- | --- |
|
||||
| [SA-001] | Stakeholder Analysis | - | [BC-001] | [RC-002] |
|
||||
| [BC-001] | Business Case | [SA-001] | [PP-001], [MIL-001], [MIL-002], [MIL-003], [MIL-004] | [RC-008] |
|
||||
| [PP-001] | Project Plan | [BC-001], [SA-001] | [MIL-001], [MIL-002], [MIL-003], [MIL-004] | [RC-009] |
|
||||
| [MIL-001] | Milestone | [BC-001], [PP-001] | - | [RC-003] |
|
||||
| [MIL-002] | Milestone | [BC-001], [PP-001] | - | [RC-004] |
|
||||
| [MIL-003] | Milestone | [BC-001], [PP-001] | - | [RC-005] |
|
||||
| [MIL-004] | Milestone | [BC-001], [PP-001] | - | [RC-007] |
|
||||
| Source code (`src/`, `tests/`) | Source code | [MIL-002], [MIL-003], [MIL-004] | - | [RC-006] |
|
||||
|
||||
## Coverage Notes
|
||||
|
||||
- `-` in Upstream means foundational; in Downstream, nothing is built on it yet; in Last Reviewed, no `RC-*` exists yet.
|
||||
- [PP-001] has no QC checklist in the framework; [RC-009] reviews it against criteria taken from the Project Plan reference.
|
||||
- No use case, domain model, design or data artifacts exist; the plan treats all tasks as plain technical tasks. The source code is reviewed in [RC-006].
|
||||
|
||||
---
|
||||
|
||||
[SA-001]: ../stakeholder-analysis.md
|
||||
[BC-001]: ../business-case.md
|
||||
[PP-001]: ../project-plan.md
|
||||
[MIL-001]: ../milestones/mil-001-project-setup.md
|
||||
[MIL-002]: ../milestones/mil-002-coffee-machine-core.md
|
||||
[MIL-003]: ../milestones/mil-003-quality-and-publication.md
|
||||
[MIL-004]: ../milestones/mil-004-code-review-and-ci.md
|
||||
[RC-002]: ./reviews/rc-002-stakeholder-analysis.md
|
||||
[RC-003]: ./reviews/rc-003-mil-001.md
|
||||
[RC-004]: ./reviews/rc-004-mil-002.md
|
||||
[RC-005]: ./reviews/rc-005-mil-003.md
|
||||
[RC-006]: ./reviews/rc-006-source-code.md
|
||||
[RC-007]: ./reviews/rc-007-mil-004.md
|
||||
[RC-008]: ./reviews/rc-008-business-case-v3.md
|
||||
[RC-009]: ./reviews/rc-009-project-plan-v2.md
|
||||
[71a27dd]: https://git.tirsystem.com/Tirsvad-Udemy-100_days_of_code/015-coffee_machine/commit/71a27ddc1f5555c1b836b1556fab292ebc9deb62
|
||||
[52b9725]: https://git.tirsystem.com/Tirsvad-Udemy-100_days_of_code/015-coffee_machine/commit/52b972520d33dc3b50f1c050d874aaeb7293a557
|
||||
@@ -9,7 +9,8 @@
|
||||
## Version History
|
||||
| Date | Status | Author | Reviewer | Change | Commit |
|
||||
| --- | --- | --- | --- | --- | --- |
|
||||
| 2026-10-05 | Accepted | Jens Tirsvad Nielsen | S01 | Initial version | [c0c3940] |
|
||||
| 2026-10-05 | Deprecated | Jens Tirsvad Nielsen | S01 | Initial version | [c0c3940] |
|
||||
| 2026-10-06 | Accepted | Jens Tirsvad Nielsen | S01 | Recorded S01 sign-off after RC-002 | [8ef00aa] |
|
||||
|
||||
---
|
||||
|
||||
@@ -70,9 +71,10 @@ Monitor).
|
||||
|
||||
| Stakeholder | Decision | Date |
|
||||
| --- | --- | --- |
|
||||
| S01 | Pending review | |
|
||||
| S01 | Go (RC-002) | 2026-10-06 |
|
||||
|
||||
---
|
||||
|
||||
[BC-001]: ./business-case.md
|
||||
[c0c3940]: https://git.tirsystem.com/Tirsvad-Udemy-100_days_of_code/015-coffee_machine/commit/c0c3940551db0d7d96492cc734976d0436051ff9
|
||||
[8ef00aa]: https://git.tirsystem.com/Tirsvad-Udemy-100_days_of_code/015-coffee_machine/commit/8ef00aafaaa193ea565f1a45238d31e963a5e05d
|
||||
|
||||
+2
-2
@@ -12,7 +12,7 @@ license = { file = "LICENSE" }
|
||||
dependencies = []
|
||||
|
||||
[project.optional-dependencies]
|
||||
dev = ["pytest>=8", "ruff", "mypy"]
|
||||
dev = ["pytest>=9", "ruff>=0.16", "mypy>=2.4"]
|
||||
|
||||
[project.scripts]
|
||||
coffee-machine = "coffee_machine.main:main"
|
||||
@@ -22,7 +22,7 @@ where = ["src"]
|
||||
|
||||
[tool.pytest.ini_options]
|
||||
testpaths = ["tests"]
|
||||
pythonpath = ["src"]
|
||||
pythonpath = ["src", "."]
|
||||
|
||||
[tool.ruff]
|
||||
line-length = 88
|
||||
|
||||
@@ -1,6 +1,54 @@
|
||||
"""!
|
||||
@file constants.py
|
||||
@brief Constants for the coffee machine: menu, coins and starting resources.
|
||||
@brief Constants for the coffee machine: menu, coins, starting resources, texts.
|
||||
|
||||
The values are added in MIL-002 ("Define constants").
|
||||
Money is stored in whole cents so that sums and change are exact.
|
||||
"""
|
||||
|
||||
from typing import TypedDict
|
||||
|
||||
|
||||
class Drink(TypedDict):
|
||||
"""!
|
||||
@brief A menu entry: the ingredients it needs and its price.
|
||||
"""
|
||||
|
||||
ingredients: dict[str, int]
|
||||
cost: int
|
||||
|
||||
|
||||
MENU: dict[str, Drink] = {
|
||||
"espresso": {"ingredients": {"water": 50, "coffee": 18}, "cost": 150},
|
||||
"latte": {
|
||||
"ingredients": {"water": 200, "milk": 150, "coffee": 24},
|
||||
"cost": 250,
|
||||
},
|
||||
"cappuccino": {
|
||||
"ingredients": {"water": 250, "milk": 100, "coffee": 24},
|
||||
"cost": 300,
|
||||
},
|
||||
}
|
||||
|
||||
## Value of each US coin in cents, in the order the machine asks for them.
|
||||
COIN_VALUES: dict[str, int] = {
|
||||
"quarters": 25,
|
||||
"dimes": 10,
|
||||
"nickels": 5,
|
||||
"pennies": 1,
|
||||
}
|
||||
|
||||
INITIAL_RESOURCES: dict[str, int] = {"water": 300, "milk": 200, "coffee": 100}
|
||||
|
||||
## Unit printed after each resource in the report.
|
||||
RESOURCE_UNITS: dict[str, str] = {"water": "ml", "milk": "ml", "coffee": "g"}
|
||||
|
||||
CENTS_PER_DOLLAR = 100
|
||||
|
||||
COMMAND_REPORT = "report"
|
||||
COMMAND_OFF = "off"
|
||||
|
||||
PROMPT_ORDER = "What would you like? (espresso/latte/cappuccino): "
|
||||
MESSAGE_INSERT_COINS = "Please insert coins."
|
||||
MESSAGE_NOT_ENOUGH_MONEY = "Sorry that's not enough money. Money refunded."
|
||||
MESSAGE_UNKNOWN_DRINK = "Sorry, we do not serve that."
|
||||
MESSAGE_INVALID_NUMBER = "Please enter a whole number of coins, zero or more."
|
||||
|
||||
+130
-4
@@ -1,12 +1,138 @@
|
||||
"""!
|
||||
@file main.py
|
||||
@brief Entry point of the coffee machine.
|
||||
@brief Entry point and logic of the coffee machine.
|
||||
"""
|
||||
|
||||
from coffee_machine.constants import (
|
||||
CENTS_PER_DOLLAR,
|
||||
COIN_VALUES,
|
||||
COMMAND_OFF,
|
||||
COMMAND_REPORT,
|
||||
INITIAL_RESOURCES,
|
||||
MENU,
|
||||
MESSAGE_INSERT_COINS,
|
||||
MESSAGE_INVALID_NUMBER,
|
||||
MESSAGE_NOT_ENOUGH_MONEY,
|
||||
MESSAGE_UNKNOWN_DRINK,
|
||||
PROMPT_ORDER,
|
||||
RESOURCE_UNITS,
|
||||
)
|
||||
|
||||
|
||||
def format_money(cents: int) -> str:
|
||||
"""!
|
||||
@brief Format an amount in cents as dollars.
|
||||
@param cents Amount in whole cents.
|
||||
@return The amount such as "$2.50".
|
||||
"""
|
||||
return f"${cents / CENTS_PER_DOLLAR:.2f}"
|
||||
|
||||
|
||||
def report(resources: dict[str, int], profit: int) -> None:
|
||||
"""!
|
||||
@brief Print the resources left in the machine and the money earned.
|
||||
@param resources Remaining amount of each resource.
|
||||
@param profit Money earned so far, in cents.
|
||||
"""
|
||||
for name, amount in resources.items():
|
||||
print(f"{name.capitalize()}: {amount}{RESOURCE_UNITS[name]}")
|
||||
print(f"Money: {format_money(profit)}")
|
||||
|
||||
|
||||
def is_resource_sufficient(
|
||||
order_ingredients: dict[str, int], resources: dict[str, int]
|
||||
) -> bool:
|
||||
"""!
|
||||
@brief Check that the machine has enough of every ingredient for an order.
|
||||
@param order_ingredients Amount of each ingredient the drink needs.
|
||||
@param resources Remaining amount of each resource.
|
||||
@return True if every ingredient is available, otherwise False after
|
||||
printing the first missing one.
|
||||
"""
|
||||
for name, needed in order_ingredients.items():
|
||||
if needed > resources[name]:
|
||||
print(f"Sorry there is not enough {name}.")
|
||||
return False
|
||||
return True
|
||||
|
||||
|
||||
def _ask_coin_count(coin_name: str) -> int:
|
||||
"""!
|
||||
@brief Ask how many coins of one kind are inserted, until the answer is valid.
|
||||
@param coin_name Plural coin name, such as "quarters".
|
||||
@return The number of coins, zero or more.
|
||||
"""
|
||||
while True:
|
||||
answer = input(f"How many {coin_name}?: ")
|
||||
try:
|
||||
count = int(answer)
|
||||
except ValueError:
|
||||
count = -1
|
||||
if count >= 0:
|
||||
return count
|
||||
print(MESSAGE_INVALID_NUMBER)
|
||||
|
||||
|
||||
def process_coins() -> int:
|
||||
"""!
|
||||
@brief Ask for the coins and total their value.
|
||||
@return The total inserted, in cents.
|
||||
"""
|
||||
print(MESSAGE_INSERT_COINS)
|
||||
return sum(
|
||||
_ask_coin_count(coin_name) * value for coin_name, value in COIN_VALUES.items()
|
||||
)
|
||||
|
||||
|
||||
def is_transaction_successful(money_received: int, drink_cost: int) -> bool:
|
||||
"""!
|
||||
@brief Check the payment, refund it if too small, otherwise give change.
|
||||
@param money_received Money inserted, in cents.
|
||||
@param drink_cost Price of the drink, in cents.
|
||||
@return True if the payment covers the price, otherwise False.
|
||||
"""
|
||||
if money_received < drink_cost:
|
||||
print(MESSAGE_NOT_ENOUGH_MONEY)
|
||||
return False
|
||||
change = money_received - drink_cost
|
||||
if change > 0:
|
||||
print(f"Here is {format_money(change)} in change.")
|
||||
return True
|
||||
|
||||
|
||||
def make_coffee(
|
||||
drink_name: str, order_ingredients: dict[str, int], resources: dict[str, int]
|
||||
) -> None:
|
||||
"""!
|
||||
@brief Use up the drink's ingredients and serve it.
|
||||
@param drink_name Name of the drink.
|
||||
@param order_ingredients Amount of each ingredient the drink needs.
|
||||
@param resources Remaining amount of each resource; updated in place.
|
||||
"""
|
||||
for name, needed in order_ingredients.items():
|
||||
resources[name] -= needed
|
||||
print(f"Here is your {drink_name}. Enjoy!")
|
||||
|
||||
|
||||
def main() -> None:
|
||||
"""!
|
||||
@brief Run the coffee machine.
|
||||
|
||||
The ordering loop is added in MIL-002 ("Implement main loop").
|
||||
@brief Run the coffee machine until the user types "off".
|
||||
"""
|
||||
resources = dict(INITIAL_RESOURCES)
|
||||
profit = 0
|
||||
while True:
|
||||
choice = input(PROMPT_ORDER).strip().lower()
|
||||
if choice == COMMAND_OFF:
|
||||
return
|
||||
if choice == COMMAND_REPORT:
|
||||
report(resources, profit)
|
||||
elif choice in MENU:
|
||||
drink = MENU[choice]
|
||||
if not is_resource_sufficient(drink["ingredients"], resources):
|
||||
continue
|
||||
payment = process_coins()
|
||||
if is_transaction_successful(payment, drink["cost"]):
|
||||
profit += drink["cost"]
|
||||
make_coffee(choice, drink["ingredients"], resources)
|
||||
else:
|
||||
print(MESSAGE_UNKNOWN_DRINK)
|
||||
|
||||
@@ -0,0 +1,4 @@
|
||||
"""!
|
||||
@file __init__.py
|
||||
@brief Test package.
|
||||
"""
|
||||
@@ -0,0 +1,25 @@
|
||||
"""!
|
||||
@file conftest.py
|
||||
@brief Shared pytest helpers.
|
||||
"""
|
||||
|
||||
from collections.abc import Callable, Iterable
|
||||
|
||||
import pytest
|
||||
|
||||
ScriptInput = Callable[[Iterable[str]], None]
|
||||
|
||||
|
||||
@pytest.fixture
|
||||
def script_input(monkeypatch: pytest.MonkeyPatch) -> ScriptInput:
|
||||
"""!
|
||||
@brief Provide a function that feeds the given answers to `input`.
|
||||
@param monkeypatch pytest's monkeypatch fixture.
|
||||
@return A function taking the answers in the order they are asked.
|
||||
"""
|
||||
|
||||
def feed(answers: Iterable[str]) -> None:
|
||||
remaining = iter(answers)
|
||||
monkeypatch.setattr("builtins.input", lambda _prompt: next(remaining))
|
||||
|
||||
return feed
|
||||
@@ -0,0 +1,107 @@
|
||||
"""!
|
||||
@file test_machine.py
|
||||
@brief Tests for making drinks and the main loop.
|
||||
"""
|
||||
|
||||
import pytest
|
||||
|
||||
from coffee_machine.constants import MENU
|
||||
from coffee_machine.main import main, make_coffee
|
||||
from tests.conftest import ScriptInput
|
||||
|
||||
COINS_FOR_LATTE = ["10", "0", "0", "0"]
|
||||
NO_COINS = ["0", "0", "0", "0"]
|
||||
FULL_REPORT = "Water: 300ml\nMilk: 200ml\nCoffee: 100g\nMoney: $0.00"
|
||||
|
||||
|
||||
def test_make_coffee_uses_up_ingredients(capsys: pytest.CaptureFixture[str]) -> None:
|
||||
"""!
|
||||
@brief The drink's ingredients are deducted and the drink is served.
|
||||
"""
|
||||
resources = {"water": 300, "milk": 200, "coffee": 100}
|
||||
make_coffee("latte", MENU["latte"]["ingredients"], resources)
|
||||
assert resources == {"water": 100, "milk": 50, "coffee": 76}
|
||||
assert capsys.readouterr().out == "Here is your latte. Enjoy!\n"
|
||||
|
||||
|
||||
def test_off_ends_the_machine(script_input: ScriptInput) -> None:
|
||||
"""!
|
||||
@brief Typing off returns from the loop.
|
||||
"""
|
||||
script_input(["off"])
|
||||
main()
|
||||
|
||||
|
||||
def test_report_shows_starting_resources(
|
||||
script_input: ScriptInput, capsys: pytest.CaptureFixture[str]
|
||||
) -> None:
|
||||
"""!
|
||||
@brief A fresh machine reports full resources and no money.
|
||||
"""
|
||||
script_input(["report", "off"])
|
||||
main()
|
||||
assert FULL_REPORT in capsys.readouterr().out
|
||||
|
||||
|
||||
def test_unknown_input_is_rejected(
|
||||
script_input: ScriptInput, capsys: pytest.CaptureFixture[str]
|
||||
) -> None:
|
||||
"""!
|
||||
@brief Anything that is not a drink or command prints a message.
|
||||
"""
|
||||
script_input(["tea", "off"])
|
||||
main()
|
||||
assert "Sorry, we do not serve that." in capsys.readouterr().out
|
||||
|
||||
|
||||
def test_sale_updates_resources_and_profit(
|
||||
script_input: ScriptInput, capsys: pytest.CaptureFixture[str]
|
||||
) -> None:
|
||||
"""!
|
||||
@brief A paid drink is served, resources drop and profit rises by the price.
|
||||
"""
|
||||
script_input(["latte", *COINS_FOR_LATTE, "report", "off"])
|
||||
main()
|
||||
out = capsys.readouterr().out
|
||||
assert "Here is your latte. Enjoy!" in out
|
||||
assert "Water: 100ml\nMilk: 50ml\nCoffee: 76g\nMoney: $2.50" in out
|
||||
|
||||
|
||||
def test_refund_changes_nothing(
|
||||
script_input: ScriptInput, capsys: pytest.CaptureFixture[str]
|
||||
) -> None:
|
||||
"""!
|
||||
@brief An underpaid order is refunded: no drink, no profit.
|
||||
"""
|
||||
script_input(["espresso", *NO_COINS, "report", "off"])
|
||||
main()
|
||||
out = capsys.readouterr().out
|
||||
assert "Money refunded." in out
|
||||
assert "Enjoy" not in out
|
||||
assert FULL_REPORT in out
|
||||
|
||||
|
||||
def test_overpayment_adds_only_price_to_profit(
|
||||
script_input: ScriptInput, capsys: pytest.CaptureFixture[str]
|
||||
) -> None:
|
||||
"""!
|
||||
@brief Change is returned and only the price is counted as profit.
|
||||
"""
|
||||
script_input(["espresso", "7", "0", "0", "0", "report", "off"])
|
||||
main()
|
||||
out = capsys.readouterr().out
|
||||
assert "Here is $0.25 in change." in out
|
||||
assert "Money: $1.50" in out
|
||||
|
||||
|
||||
def test_order_refused_when_resources_run_out(
|
||||
script_input: ScriptInput, capsys: pytest.CaptureFixture[str]
|
||||
) -> None:
|
||||
"""!
|
||||
@brief After the water is used up, the next order is refused before payment.
|
||||
"""
|
||||
script_input(["latte", *COINS_FOR_LATTE, "latte", "off"])
|
||||
main()
|
||||
out = capsys.readouterr().out
|
||||
assert out.count("Please insert coins.") == 1
|
||||
assert "Sorry there is not enough water." in out
|
||||
@@ -0,0 +1,52 @@
|
||||
"""!
|
||||
@file test_resources.py
|
||||
@brief Tests for the report and the resource check.
|
||||
"""
|
||||
|
||||
import pytest
|
||||
|
||||
from coffee_machine.constants import INITIAL_RESOURCES, MENU
|
||||
from coffee_machine.main import format_money, is_resource_sufficient, report
|
||||
|
||||
|
||||
def test_format_money_shows_two_decimals() -> None:
|
||||
"""!
|
||||
@brief Cents are shown as dollars with two decimals.
|
||||
"""
|
||||
assert format_money(250) == "$2.50"
|
||||
assert format_money(0) == "$0.00"
|
||||
|
||||
|
||||
def test_report_prints_resources_and_money(capsys: pytest.CaptureFixture[str]) -> None:
|
||||
"""!
|
||||
@brief The report lists each resource with its unit, then the money.
|
||||
"""
|
||||
report({"water": 300, "milk": 200, "coffee": 100}, 250)
|
||||
assert capsys.readouterr().out == (
|
||||
"Water: 300ml\nMilk: 200ml\nCoffee: 100g\nMoney: $2.50\n"
|
||||
)
|
||||
|
||||
|
||||
def test_is_resource_sufficient_when_enough() -> None:
|
||||
"""!
|
||||
@brief An order is accepted when every ingredient is available.
|
||||
"""
|
||||
assert is_resource_sufficient(MENU["latte"]["ingredients"], INITIAL_RESOURCES)
|
||||
|
||||
|
||||
def test_is_resource_sufficient_when_exactly_enough() -> None:
|
||||
"""!
|
||||
@brief Using up an ingredient completely is allowed.
|
||||
"""
|
||||
assert is_resource_sufficient({"water": 300}, {"water": 300})
|
||||
|
||||
|
||||
def test_is_resource_sufficient_names_missing_resource(
|
||||
capsys: pytest.CaptureFixture[str],
|
||||
) -> None:
|
||||
"""!
|
||||
@brief A short ingredient is refused and named.
|
||||
"""
|
||||
resources = {"water": 300, "milk": 100, "coffee": 100}
|
||||
assert not is_resource_sufficient(MENU["latte"]["ingredients"], resources)
|
||||
assert capsys.readouterr().out == "Sorry there is not enough milk.\n"
|
||||
+5
-2
@@ -3,11 +3,14 @@
|
||||
@brief Smoke test that the package imports.
|
||||
"""
|
||||
|
||||
import pytest
|
||||
|
||||
from coffee_machine import main as main_module
|
||||
|
||||
|
||||
def test_main_is_callable() -> None:
|
||||
def test_main_is_callable(monkeypatch: pytest.MonkeyPatch) -> None:
|
||||
"""!
|
||||
@brief The entry point runs without error.
|
||||
@brief The entry point starts and stops on "off".
|
||||
"""
|
||||
monkeypatch.setattr("builtins.input", lambda _prompt: "off")
|
||||
main_module.main()
|
||||
|
||||
@@ -0,0 +1,56 @@
|
||||
"""!
|
||||
@file test_transactions.py
|
||||
@brief Tests for coin processing and payment.
|
||||
"""
|
||||
|
||||
import pytest
|
||||
|
||||
from coffee_machine.main import is_transaction_successful, process_coins
|
||||
from tests.conftest import ScriptInput
|
||||
|
||||
|
||||
def test_process_coins_totals_in_cents(script_input: ScriptInput) -> None:
|
||||
"""!
|
||||
@brief Quarters, dimes, nickels and pennies add up to the right total.
|
||||
"""
|
||||
script_input(["4", "3", "2", "1"])
|
||||
assert process_coins() == 4 * 25 + 3 * 10 + 2 * 5 + 1
|
||||
|
||||
|
||||
def test_process_coins_asks_again_on_invalid_count(
|
||||
script_input: ScriptInput, capsys: pytest.CaptureFixture[str]
|
||||
) -> None:
|
||||
"""!
|
||||
@brief Text and negative counts are rejected and asked again.
|
||||
"""
|
||||
script_input(["abc", "-1", "2", "0", "0", "0"])
|
||||
assert process_coins() == 50
|
||||
assert capsys.readouterr().out.count("Please enter a whole number") == 2
|
||||
|
||||
|
||||
def test_transaction_refused_when_too_little(
|
||||
capsys: pytest.CaptureFixture[str],
|
||||
) -> None:
|
||||
"""!
|
||||
@brief Too little money is refunded with the refund message.
|
||||
"""
|
||||
assert not is_transaction_successful(100, 150)
|
||||
assert "Sorry that's not enough money. Money refunded." in capsys.readouterr().out
|
||||
|
||||
|
||||
def test_transaction_accepted_with_exact_payment(
|
||||
capsys: pytest.CaptureFixture[str],
|
||||
) -> None:
|
||||
"""!
|
||||
@brief Exact payment succeeds and gives no change.
|
||||
"""
|
||||
assert is_transaction_successful(150, 150)
|
||||
assert "change" not in capsys.readouterr().out
|
||||
|
||||
|
||||
def test_transaction_gives_change(capsys: pytest.CaptureFixture[str]) -> None:
|
||||
"""!
|
||||
@brief Overpaying succeeds and returns the difference.
|
||||
"""
|
||||
assert is_transaction_successful(175, 150)
|
||||
assert capsys.readouterr().out == "Here is $0.25 in change.\n"
|
||||
Reference in New Issue
Block a user