Commit Graph
18 Commits
Author SHA1 Message Date
Tirsvad dde1b8429f Merge pull request 'Record the display-requirement decision on RC-006' (#18) from record-display-decision into main
TirSystem/github-action: Sync GitHub mirror metadata / sync-metadata (push) Successful in 3s
Reviewed-on: #18
2026-10-07 18:35:26 +02:00
Tirsvad 8692cddf14 Resolve pending commit link
Replace `pending` in the Version History of RC-006 with a link to the commit
that introduced the row.
2026-10-08 00:34:14 +08:00
Tirsvad 3868ea6f8b Record S01's acceptance of the display requirement on RC-006
Close Action Item 2 of RC-006: S01 accepted that 10 of the 33 test functions
(10 of 40 test cases) need a display for Tk, while the other 23 functions (30
cases) run anywhere. The code and the tests do not change.

Only the pale palette colours remain open on RC-006, and they do not block the
verdict.
2026-10-08 00:34:13 +08:00
Tirsvad 6c7df312a4 Merge pull request 'Record the gateway decisions of MIL-001 and MIL-002' (#17) from record-gateway-decisions into main
TirSystem/github-action: Sync GitHub mirror metadata / sync-metadata (push) Successful in 3s
Reviewed-on: #17
2026-10-07 18:28:13 +02:00
Tirsvad e6988d5648 Resolve pending commit link
Replace `pending` in the Version History of PP-001 with a link to the commit
that introduced the row.
2026-10-08 00:27:20 +08:00
Tirsvad a6b17d30bc Record the Go decisions of MIL-001 and MIL-002 in the Project Plan
Add a Gateway Decisions section to PP-001: S01 decided Go on both gateways on
2026-10-08, ahead of the planned 2026-10-09 and 2026-10-14, because every Go
criterion was already met. Each row names the criteria, the review record
(RC-005, RC-006) and the merged pull request (#14, #16).

Close the reference-image open issue, which has been resolved since S01
supplied the image on 2026-10-07. The two open decisions on RC-006 (the display
requirement of the tests, the pale palette colours) did not block either gate.
2026-10-08 00:27:13 +08:00
Tirsvad bd4a4dab6a Merge pull request 'Draw the Hirst painting (MIL-002)' (#16) from mil-002-spot-painting into main
TirSystem/github-action: Sync GitHub mirror metadata / sync-metadata (push) Successful in 4s
Reviewed-on: #16
2026-10-07 18:22:35 +02:00
Tirsvad e08cc3c16b Resolve pending commit link
Replace `pending` in the Version History of RC-006 with a link to the commit
that introduced the row.
2026-10-08 00:21:06 +08:00
Tirsvad c3cfb6462e Record the review of the MIL-002 code as RC-006
Review the code of MIL-002 against QC-PY-001: 12 of 13 criteria apply and all
pass, criterion 10 is N-A (no Design Class Diagram). Verdict Go, confirmed by
S01. That is the last Go criterion of MIL-002.

Two decisions stay open and do not block the verdict: the tests need a display
for Tk, and a few pale palette colours are faint on the white background.

Closes #13

Task: MIL-002#7
2026-10-08 00:20:57 +08:00
Tirsvad be82070c04 Draw the Hirst painting: pen, dot positions, dots, click wait and speed
MIL-002 tasks 1 to 6.

- Add create_pen, which hides the turtle, lifts the pen and switches the screen
  to 0 to 255 colours.
- Add dot_positions: 100 dot centres in 10 rows of 10, 50 apart, centred on the
  origin so the painting fits the default window.
- Add draw_dots, which draws a size-20 dot at every position in a colour chosen
  from the palette, and raises ValueError for an empty palette.
- Add main: draw with the palette of the reference image, then wait for a click
  with exitonclick. Animation is off while drawing and the screen updates once,
  which takes the drawing from 21.1 to 0.35 seconds (SC6 allows 30).
- Add 22 tests: pen setup, positions and spacing, dots on a recording fake pen
  and on a real turtle, no trail, and the order of main's steps. All tests share
  one hidden Tk window, because starting Tk per test fails now and then on
  Windows.

Closes #7
Closes #8
Closes #9
Closes #10
Closes #11
Closes #12

Task: MIL-002#1
Task: MIL-002#2
Task: MIL-002#3
Task: MIL-002#4
Task: MIL-002#5
Task: MIL-002#6
2026-10-08 00:20:48 +08:00
Tirsvad 0b82397ff6 Merge pull request 'Stop tracking AGENTS.md and the installed skill copies' (#15) from untrack-agent-files into main
TirSystem/github-action: Sync GitHub mirror metadata / sync-metadata (push) Successful in 5s
Reviewed-on: #15
2026-10-07 18:18:54 +02:00
Tirsvad b617bdfba9 Stop tracking AGENTS.md and the installed skill copies
Remove AGENTS.md, .claude/skills and .agents/skills from the repository. They
are local tooling: bash framework/scripts/install-skills.sh recreates the skill
copies, and each clone keeps all three out of git through .git/info/exclude.

The files stay in the history of main; this commit only stops tracking them.
2026-10-08 00:10:58 +08:00
Tirsvad e6e34aa7d2 Merge pull request 'Add the colour palette (MIL-001)' (#14) from mil-001-colour-palette into main
TirSystem/github-action: Sync GitHub mirror metadata / sync-metadata (push) Successful in 4s
Reviewed-on: #14
2026-10-07 17:55:08 +02:00
Tirsvad 412237afe4 Resolve pending commit links
Replace `pending` in the Version History of BC-001, SA-001, PP-001, MIL-001,
MIL-002 and RC-001 to RC-005 with links to the commits that introduced the rows.
2026-10-07 23:49:56 +08:00
Tirsvad b7119ef907 Add the colour palette: white-shade filter and palette extraction
MIL-001 tasks 1 to 6.

- Pin the toolchain and tool configuration in pyproject.toml: Python 3.13,
  colorgram.py 1.2.0, and ruff, mypy (strict) and pytest as dev tools.
- Add is_white_shade and remove_white_shades (threshold 240) with tests that
  pin the boundary at 239 and 240.
- Add extract_palette, which reads the reference image with colorgram and drops
  white shades, with tests on synthetic images and on the reference image.
- Add the reference image assets/20260524_132700.jpg and a note on it.
- Record the code review against QC-PY-001 as RC-005 (verdict Go).

Closes #1
Closes #2
Closes #3
Closes #4
Closes #5
Closes #6

Task: MIL-001#1
Task: MIL-001#2
Task: MIL-001#3
Task: MIL-001#4
Task: MIL-001#5
Task: MIL-001#6
2026-10-07 23:49:38 +08:00
Tirsvad b823d1f405 Plan the Hirst painting project and review the plan documents
Add the Business Case (BC-001), Stakeholder Analysis (SA-001), Project Plan
(PP-001) and two milestones: MIL-001 Colour Palette and MIL-002 Spot Painting.
Record their reviews as RC-001 to RC-004 (all Go, self-review accepted by S01).

The PO language is English and the domain is IT. The milestones and their 13
tasks are synced as Gitea milestones 68 and 69 and issues #1 to #13.
2026-10-07 23:49:16 +08:00
Tirsvad 7c0ed0dcc5 Add the SQA and QC framework and project instructions
Mount the framework as a submodule at framework/ (v0.4.0), add AGENTS.md and
the installed skill copies for Codex CLI (.agents/skills) and Claude Code
(.claude/skills).
2026-10-07 23:49:15 +08:00
Tirsvad 0d3f30355a Initial commit 2026-10-07 16:35:56 +02:00