a6b17d30bc0778b7f80c57bfd22a505df5fe9ee1
Add a Gateway Decisions section to PP-001: S01 decided Go on both gateways on 2026-10-08, ahead of the planned 2026-10-09 and 2026-10-14, because every Go criterion was already met. Each row names the criteria, the review record (RC-005, RC-006) and the merged pull request (#14, #16). Close the reference-image open issue, which has been resolved since S01 supplied the image on 2026-10-07. The two open decisions on RC-006 (the display requirement of the tests, the pale palette colours) did not block either gate.
018-hirst-painting
Languages
Python
100%