Close Action Item 2 of RC-006: S01 accepted that 10 of the 33 test functions
(10 of 40 test cases) need a display for Tk, while the other 23 functions (30
cases) run anywhere. The code and the tests do not change.
Only the pale palette colours remain open on RC-006, and they do not block the
verdict.
Add a Gateway Decisions section to PP-001: S01 decided Go on both gateways on
2026-10-08, ahead of the planned 2026-10-09 and 2026-10-14, because every Go
criterion was already met. Each row names the criteria, the review record
(RC-005, RC-006) and the merged pull request (#14, #16).
Close the reference-image open issue, which has been resolved since S01
supplied the image on 2026-10-07. The two open decisions on RC-006 (the display
requirement of the tests, the pale palette colours) did not block either gate.
Review the code of MIL-002 against QC-PY-001: 12 of 13 criteria apply and all
pass, criterion 10 is N-A (no Design Class Diagram). Verdict Go, confirmed by
S01. That is the last Go criterion of MIL-002.
Two decisions stay open and do not block the verdict: the tests need a display
for Tk, and a few pale palette colours are faint on the white background.
Closes#13
Task: MIL-002#7
MIL-002 tasks 1 to 6.
- Add create_pen, which hides the turtle, lifts the pen and switches the screen
to 0 to 255 colours.
- Add dot_positions: 100 dot centres in 10 rows of 10, 50 apart, centred on the
origin so the painting fits the default window.
- Add draw_dots, which draws a size-20 dot at every position in a colour chosen
from the palette, and raises ValueError for an empty palette.
- Add main: draw with the palette of the reference image, then wait for a click
with exitonclick. Animation is off while drawing and the screen updates once,
which takes the drawing from 21.1 to 0.35 seconds (SC6 allows 30).
- Add 22 tests: pen setup, positions and spacing, dots on a recording fake pen
and on a real turtle, no trail, and the order of main's steps. All tests share
one hidden Tk window, because starting Tk per test fails now and then on
Windows.
Closes#7Closes#8Closes#9Closes#10Closes#11Closes#12
Task: MIL-002#1
Task: MIL-002#2
Task: MIL-002#3
Task: MIL-002#4
Task: MIL-002#5
Task: MIL-002#6
Remove AGENTS.md, .claude/skills and .agents/skills from the repository. They
are local tooling: bash framework/scripts/install-skills.sh recreates the skill
copies, and each clone keeps all three out of git through .git/info/exclude.
The files stay in the history of main; this commit only stops tracking them.
Replace `pending` in the Version History of BC-001, SA-001, PP-001, MIL-001,
MIL-002 and RC-001 to RC-005 with links to the commits that introduced the rows.
MIL-001 tasks 1 to 6.
- Pin the toolchain and tool configuration in pyproject.toml: Python 3.13,
colorgram.py 1.2.0, and ruff, mypy (strict) and pytest as dev tools.
- Add is_white_shade and remove_white_shades (threshold 240) with tests that
pin the boundary at 239 and 240.
- Add extract_palette, which reads the reference image with colorgram and drops
white shades, with tests on synthetic images and on the reference image.
- Add the reference image assets/20260524_132700.jpg and a note on it.
- Record the code review against QC-PY-001 as RC-005 (verdict Go).
Closes#1Closes#2Closes#3Closes#4Closes#5Closes#6
Task: MIL-001#1
Task: MIL-001#2
Task: MIL-001#3
Task: MIL-001#4
Task: MIL-001#5
Task: MIL-001#6
Add the Business Case (BC-001), Stakeholder Analysis (SA-001), Project Plan
(PP-001) and two milestones: MIL-001 Colour Palette and MIL-002 Spot Painting.
Record their reviews as RC-001 to RC-004 (all Go, self-review accepted by S01).
The PO language is English and the domain is IT. The milestones and their 13
tasks are synced as Gitea milestones 68 and 69 and issues #1 to #13.
Mount the framework as a submodule at framework/ (v0.4.0), add AGENTS.md and
the installed skill copies for Codex CLI (.agents/skills) and Claude Code
(.claude/skills).