Record the gateway decisions of MIL-001 and MIL-002 #17

Merged
Tirsvad merged 2 commits from record-gateway-decisions into main 2026-10-07 18:28:13 +02:00
Owner

Summary

Records the Go/No-Go decisions of both gateways in the Project Plan (PP-001).

  • New Gateway Decisions section: S01 decided Go on MIL-001 and on MIL-002 on 2026-10-08, ahead of the planned 2026-10-09 and 2026-10-14, because every Go criterion was already met. Each row names the criteria, the review record (RC-005, RC-006) and the merged pull request (#14, #16).
  • Closes the plan's reference-image open issue, which has been resolved since S01 supplied the image on 2026-10-07.
  • The two open decisions on RC-006 (the display requirement of the tests, and the pale palette colours) did not block either gateway; the section says so.
  • Version History: one new row, accepted by S01 in chat on 2026-10-08 (the Project Plan has no quality checklist, so no review record is written for it), and the commit link resolved in a follow-up commit.

Only docs/project-plan.md changes. The milestone documents are untouched on purpose: the plan-first gate reads their status and review verdict, so editing them would reset them to Proposed.

Issues

No issue closed: this records decisions that no task of MIL-001 or MIL-002 covers. Both milestones and issues #1 to #13 are already closed.

## Summary Records the Go/No-Go decisions of both gateways in the Project Plan (PP-001). - New `Gateway Decisions` section: S01 decided **Go** on MIL-001 and on MIL-002 on 2026-10-08, ahead of the planned 2026-10-09 and 2026-10-14, because every Go criterion was already met. Each row names the criteria, the review record (RC-005, RC-006) and the merged pull request (#14, #16). - Closes the plan's reference-image open issue, which has been resolved since S01 supplied the image on 2026-10-07. - The two open decisions on RC-006 (the display requirement of the tests, and the pale palette colours) did not block either gateway; the section says so. - Version History: one new row, accepted by S01 in chat on 2026-10-08 (the Project Plan has no quality checklist, so no review record is written for it), and the commit link resolved in a follow-up commit. Only `docs/project-plan.md` changes. The milestone documents are untouched on purpose: the plan-first gate reads their status and review verdict, so editing them would reset them to `Proposed`. ## Issues No issue closed: this records decisions that no task of MIL-001 or MIL-002 covers. Both milestones and issues #1 to #13 are already closed.
Tirsvad added 2 commits 2026-10-07 18:27:38 +02:00
Add a Gateway Decisions section to PP-001: S01 decided Go on both gateways on
2026-10-08, ahead of the planned 2026-10-09 and 2026-10-14, because every Go
criterion was already met. Each row names the criteria, the review record
(RC-005, RC-006) and the merged pull request (#14, #16).

Close the reference-image open issue, which has been resolved since S01
supplied the image on 2026-10-07. The two open decisions on RC-006 (the display
requirement of the tests, the pale palette colours) did not block either gate.
Replace `pending` in the Version History of PP-001 with a link to the commit
that introduced the row.
Tirsvad merged commit 6c7df312a4 into main 2026-10-07 18:28:13 +02:00
Sign in to join this conversation.
No Reviewers
No labels
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: Tirsvad-Udemy-100-days-of-code/018-hirst-painting#17