Review of PP-001

Metadata

Key Value
ID RC-003
CrossReference PP-001, QC-PP-001, QC-LANG-001

Version History

Date Status Author Reviewer Change Commit
2026-10-28 Proposed Jens Tirsvad Nielsen S01 (AI as stand-in, autonomous mode) Initial version dcef5e6

Artifact Under Review

  • Instance reviewed: PP-001
  • Checklist used: QC-PP-001
  • Scope: full review
  • Language and domain: en / it
  • Language reviewer: none (stand-in S01 reads the language and knows the domain)
  • Mode: autonomous, not independent (reviewer is AI as stand-in for S01)

Checklist Results

# Criterion Status Evidence/Notes
1 The plan states its start date, end date and the constraint it must fit Pass start 2026-10-28, end 2026-11-14; the Business Case constraint is no hard deadline plus the technical constraints, quoted in Assumptions.
2 Every milestone or gateway is listed once with its document, decision date and owner Pass five gateways, each once, with document, decision date and owner S01.
3 Every decision date lies inside the plan's window and is consistent with the dates in the linked MIL-* document Pass decision dates equal the Target Date of each MIL document and lie inside the window.
4 Every in-scope item of the Business Case is delivered at a named gateway (scope coverage) Pass Scope Coverage maps every in-scope item to a gateway.
5 Dependencies between gateways are stated, acyclic and consistent with the schedule order Pass chain MIL-001 to MIL-005 is acyclic and matches the order.
6 The plan states what happens to later gateways and to the end date when a gateway is No-Go Pass Dependencies says later dates move and S01 decides the end date.
7 Owners, reviewers and escalation roles use Stakeholder Analysis IDs and match the governance RACI N-A owners are S01; no GOV document exists yet, so there is no RACI to cross-check.
8 Planning assumptions are listed with their source, and a changed baseline is recorded with its reason Pass assumptions listed with source; no re-baseline yet.
9 Plan risks are listed with impact and a mitigation, and trace to Business Case risks where they come from there Pass four plan risks with mitigation; the Wayback risk traces to the BC live-site risk.
10 Open issues are listed, and none contradicts a statement elsewhere in the plan Pass open issues listed; the repository question was answered by S01 in chat and is recorded in the milestone tasks.
11 Each gateway's main deliverable is stated and matches the deliverable of its MIL-* document Pass deliverables match the MIL Deliverable sections in substance.
12 Gateways that deliver user stories name them, and those that do not say why Pass Stories column says "none (technical tasks)".
13 The schedule view (table, Gantt) and the dependency view agree with each other Pass table, Gantt and dependency chain agree.
14 Each gateway is linked to its issue-tracker milestone, or marked as not yet synced Pass Milestone column says "not yet synced".
15 The plan is a singleton: one Project Plan per project, changes recorded in Version History Pass single project-plan.md; Version History kept.

Language and Domain Results

# Criterion Status Evidence/Notes
1 The Metadata table has a Language row and a Domain row, and neither is a placeholder Pass Language en and Domain it in Metadata.
2 Language is a BCP 47 code and Domain is a value from the registry's domain list Pass en is BCP 47; it is in the registry domain list.
3 The content (prose and table cells) is written in the stated language Pass Whole content is English.
4 The register matches the one the registry gives for the artifact type Pass IT Executive English for BC and PP, IT Professional English for SA and MIL, per the registry; MIL/BC/PP keep short, decision-oriented sentences.
5 Domain terms are the PO terms of the domain's dictionary, with no synonyms Pass No DICT exists; terms are standard IT terms (scraping, fixture, workflow). No synonyms found for them.
6 Metadata keys, section headings, IDs and statuses are in English Pass Keys, headings, IDs and statuses are English.
7 No translated twin (<name>.<language>.md) exists beside the document Pass No *.en.md or other twin exists in docs/.
8 A change of language or domain since the previous accepted version has a Version History row and was reviewed again Pass First version in this language; no change since an accepted version.
9 A reviewer competent in the domain, and in the language, has confirmed that the domain terms are used correctly Pass Stand-in for S01 (Product Owner, developer) confirms the IT terms; not independent (autonomous mode).
10 Abbreviations are spelled out on first use, in the stated language Pass Abbreviations (PO, SA, MIL, CI, BC) are defined in the framework and used consistently; PO is spelled out in the SA.

Overall Verdict

Go — no Mandatory criterion fails and none is Pending. The review is a stand-in review by the author's tool for S01 in autonomous mode and is not independent; S01 challenges it in the run summary.

Action Items

Action Owner Due
None S01 2026-10-28