Tirsvad
7a30560a74
Fix the review findings in connect-tailscale
...
tailscaled is waited for before tailscale up, a tailscaled that already runs on
the runner is not taken over and down leaves a daemon it did not start, sudo is
used only when the job is not root, an exact version is required to install
(with an optional sha256 of the archive), and the guide states when the node is
ephemeral and calls @main until the release.
Refs #185
Task: MIL-012#4
2026-10-19 12:01:06 +08:00
Tirsvad
9e1cfa5fa8
Fix the review findings in connect-wireguard
...
The wireguard-go choice now survives sudo (it is passed through env), sudo is
used only when the job is not root, a configuration field with a line break is
refused, only the key values of a full configuration are masked, the key file
is removed when wg-quick fails, and the guide calls @main until the release.
Refs #184
Task: MIL-012#3
2026-10-19 12:01:00 +08:00
Tirsvad
f0d9d79f4c
Merge pull request 'Add the connect-wireguard and connect-tailscale actions (MIL-012, unverified on a runner)' ( #194 ) from wireguard-vpn-action into main
...
Validate workflows / validate (push) Successful in 36s
TirSystem/github-action: Sync GitHub mirror metadata / sync-metadata (push) Successful in 5s
Reviewed-on: #194
2026-10-19 05:27:01 +02:00
Tirsvad
2689264500
Note the two VPN actions in the changelog under Unreleased
...
TirSystem/github-action: Sync GitHub mirror metadata / sync-metadata (push) Skipped
Validate workflows / validate (pull_request) Successful in 39s
Refs #188
Task: MIL-012#7
2026-10-19 11:24:39 +08:00
Tirsvad
8eaba331ec
Add the connect-tailscale composite action for Gitea (not yet verified on a runner)
...
actions/connect-tailscale joins a Tailscale network for a deployment job, with
a guide and offline tests. Whether tailscaled survives to the next step is
still open (MIL-012 task 4).
Refs #185
Task: MIL-012#4
2026-10-19 11:24:36 +08:00
Tirsvad
fce3cf8c6b
Add the connect-wireguard composite action for Gitea (not yet verified on a runner)
...
actions/connect-wireguard brings a WireGuard tunnel up for a deployment job and
takes it down again, with a guide and offline tests. The runs on a real runner
(MIL-012 task 3) are still to do.
Refs #184
Task: MIL-012#3
2026-10-19 11:24:33 +08:00
Tirsvad
54e83770a5
Merge pull request 'Plan MIL-012: VPN actions for deployment (WireGuard and Tailscale)' ( #181 ) from wireguard-vpn-action into main
...
Publish accepted milestones / publish (push) Successful in 1m20s
Validate workflows / validate (push) Successful in 34s
TirSystem/github-action: Sync GitHub mirror metadata / sync-metadata (push) Successful in 6s
Reviewed-on: #181
2026-10-19 04:49:02 +02:00
Tirsvad
8e093821f1
Resolve pending commit links for MIL-012
TirSystem/github-action: Sync GitHub mirror metadata / sync-metadata (push) Skipped
Validate workflows / validate (pull_request) Successful in 30s
2026-10-19 10:38:02 +08:00
Tirsvad
c5d5941869
Plan MIL-012: VPN actions for deployment (WireGuard and Tailscale)
...
Adds MIL-012 (accepted, RC-080), objective O6 to the Business Case (RC-081),
the schedule row, risk and dependency to the Project Plan, and the
traceability rows. The action code on this branch is not part of this commit.
2026-10-19 10:37:56 +08:00
Tirsvad
241c26432b
Merge pull request 'MIL-011 outcome: release 2.1.1, the framework page and RC-079' ( #180 ) from mil-011-close into main
...
Publish accepted milestones / publish (push) Successful in 53s
Validate workflows / validate (push) Successful in 31s
TirSystem/github-action: Sync GitHub mirror metadata / sync-metadata (push) Successful in 5s
Reviewed-on: #180
2026-10-14 11:56:41 +02:00
Tirsvad
251e18dfc3
Resolve pending commit links for RC-079
TirSystem/github-action: Sync GitHub mirror metadata / sync-metadata (push) Skipped
Validate workflows / validate (pull_request) Successful in 36s
2026-10-14 17:30:49 +08:00
Tirsvad
4aa3fd38f9
MIL-011 outcome: release 2.1.1 and the framework page, RC-079
...
The Release workflow created v2.1.1 and moved v2 (v1 unchanged); a call
at @v2 with the defaults ran after the release (run 1526). The
framework Badges page has no tools-ref workaround (framework pull
request 57). RC-079: Go, all eight criteria pass.
2026-10-14 17:30:48 +08:00
Tirsvad
302346103e
Merge pull request 'Release 2.1.1: changelog entry' ( #179 ) from release-2.1.1 into main
...
Validate workflows / validate (push) Successful in 37s
TirSystem/github-action: Sync GitHub mirror metadata / sync-metadata (push) Successful in 8s
Reviewed-on: #179
v2.1.1
v2
2026-10-14 11:20:15 +02:00
Tirsvad
469edab57b
Release 2.1.1: changelog entry
TirSystem/github-action: Sync GitHub mirror metadata / sync-metadata (push) Skipped
Validate workflows / validate (pull_request) Successful in 36s
2026-10-14 17:19:27 +08:00
Tirsvad
49af328232
Merge pull request 'MIL-011 tasks 2 to 5: the default tools-ref is the current major' ( #178 ) from mil-011-fix into main
...
Publish wiki / publish-wiki (push) Successful in 23s
Publish own wiki / wiki (push) Successful in 23s
Publish accepted milestones / publish (push) Successful in 56s
Validate workflows / validate (push) Successful in 38s
TirSystem/github-action: Sync GitHub mirror metadata / sync-metadata (push) Successful in 6s
Reviewed-on: #178
2026-10-14 11:17:50 +02:00
Tirsvad
604d4c2d0c
Resolve pending commit links for MIL-011
TirSystem/github-action: Sync GitHub mirror metadata / sync-metadata (push) Skipped
Validate workflows / validate (pull_request) Successful in 31s
2026-10-14 17:13:23 +08:00
Tirsvad
a6892c372a
MIL-011 tasks 5 and 9: results of the run on the instance, RC-078
...
The fixed workflow at the branch, with every input at its default, ran
as run 1509: tools-ref resolved to v2, the scripts were fetched and the
badges were committed. RC-078 reviews the deliverables of tasks 2 to 5:
Go; criteria 6 to 8 stay open until the release and the framework page.
2026-10-14 17:13:20 +08:00
Tirsvad
eaa0e30bea
MIL-011 tasks 2 to 4: the default tools-ref is the current major
...
TirSystem/github-action: Sync GitHub mirror metadata / sync-metadata (push) Skipped
code-metrics.yml defaulted tools-ref to v1 and its guide said @v1, but
the workflow and its scripts exist only from v2.1.0. The default of the
five reusable workflows is now the current major, defined once in
MAJOR_TAG, and tests/test_tools_ref.py fails when a default differs from
it or names a tag without the script. Guides, README and wiki (en, da,
ms) call code-metrics.yml at @v2; ADR-0005, 0008, 0009 and 0010 carry
an amendment; RC-077 accepts the milestone's task 1 results.
Task: MIL-011#2
2026-10-14 17:09:34 +08:00
Tirsvad
76f6b56f8d
Merge pull request 'MIL-011 task 1: reproduce the defect and list the defaults' ( #177 ) from mil-011-task-1 into main
...
Publish accepted milestones / publish (push) Successful in 1m6s
Validate workflows / validate (push) Successful in 28s
TirSystem/github-action: Sync GitHub mirror metadata / sync-metadata (push) Successful in 5s
Reviewed-on: #177
2026-10-14 11:02:14 +02:00
Tirsvad
49d27f98db
Resolve pending commit link for MIL-011
TirSystem/github-action: Sync GitHub mirror metadata / sync-metadata (push) Skipped
Validate workflows / validate (pull_request) Successful in 31s
2026-10-14 16:34:18 +08:00
Tirsvad
e11c43f0a4
MIL-011 task 1: reproduce the defect and list the defaults
...
On a throwaway branch, code-metrics.yml at @v2 with the defaults fails
in "Validate the inputs" (tools/code-metrics.sh absent at v1, run 1499),
and a call at @v1 creates no run at all. Of the five reusable workflows
only code-metrics.yml names a tag without its script.
2026-10-14 16:34:17 +08:00
Tirsvad
04f98c2e4e
Merge pull request 'Review and accept MIL-011 (RC-076)' ( #167 ) from mil-011-code-metrics-defaults into main
...
Publish accepted milestones / publish (push) Successful in 53s
Validate workflows / validate (push) Successful in 29s
TirSystem/github-action: Sync GitHub mirror metadata / sync-metadata (push) Successful in 6s
Reviewed-on: #167
2026-10-14 10:05:07 +02:00
Tirsvad
60da2583d1
Resolve pending commit links for RC-076
TirSystem/github-action: Sync GitHub mirror metadata / sync-metadata (push) Skipped
Validate workflows / validate (pull_request) Successful in 32s
2026-10-14 16:00:05 +08:00
Tirsvad
3d7a9df3a3
Review and accept MIL-011 (RC-076)
...
First read found three corrections: the wording of O5 in the
traceability, "ten milestones" in the plan's purpose, and a scope row that
is not a Business Case item. Go; accepted by the author as stand-in for
S01, not independent. MIL-011 and its plan row are Accepted; the
traceability matrix has the new rows.
2026-10-14 16:00:04 +08:00
Tirsvad
0027da529c
Merge pull request 'Plan MIL-011: fix the defaults of the code metrics workflow' ( #166 ) from mil-011-code-metrics-defaults into main
...
Validate workflows / validate (push) Successful in 37s
Publish accepted milestones / publish (push) Successful in 48s
TirSystem/github-action: Sync GitHub mirror metadata / sync-metadata (push) Successful in 5s
Reviewed-on: #166
2026-10-14 09:58:30 +02:00
Tirsvad
60f39e3854
Resolve pending commit links for MIL-011
Validate workflows / validate (pull_request) Successful in 31s
TirSystem/github-action: Sync GitHub mirror metadata / sync-metadata (push) Skipped
2026-10-14 15:57:20 +08:00
Tirsvad
02e3794d7b
Plan MIL-011: fix the defaults of the code metrics workflow
...
TirSystem/github-action: Sync GitHub mirror metadata / sync-metadata (push) Skipped
Release 2.1.0 documents code-metrics.yml at @v1 and defaults tools-ref to
v1, but the workflow and its scripts exist only from v2.1.0. MIL-011
plans the fix (a patch release 2.1.1), the test that would have caught
it, the guide and wiki corrections, and the removal of the workaround
from the framework Badges page. Proposed; no code changes yet.
2026-10-14 15:57:16 +08:00
Tirsvad
ae04bc759f
Merge pull request 'MIL-010: release 2.1.0 and outcome review RC-075' ( #165 ) from mil-010-outcome into main
...
Publish wiki / publish-wiki (push) Successful in 11s
Publish own wiki / wiki (push) Successful in 11s
Publish accepted milestones / publish (push) Successful in 46s
Validate workflows / validate (push) Successful in 29s
TirSystem/github-action: Sync GitHub mirror metadata / sync-metadata (push) Successful in 8s
Reviewed-on: #165
2026-10-14 09:13:28 +02:00
Tirsvad
62d280f07f
Resolve pending commit links
TirSystem/github-action: Sync GitHub mirror metadata / sync-metadata (push) Skipped
Validate workflows / validate (pull_request) Successful in 31s
2026-10-14 15:10:33 +08:00
Tirsvad
aa20e56110
MIL-010 task 9: release 2.1.0, outcome review RC-075
...
Task: MIL-010#9
Refs #163
2026-10-14 15:10:32 +08:00
Tirsvad
16faffaf13
Merge pull request 'MIL-010: code metrics and coverage badges workflow' ( #164 ) from mil-010-implementation into main
...
Publish accepted milestones / publish (push) Successful in 55s
Validate workflows / validate (push) Successful in 33s
TirSystem/github-action: Sync GitHub mirror metadata / sync-metadata (push) Successful in 6s
Publish wiki / publish-wiki (push) Successful in 22s
Publish own wiki / wiki (push) Successful in 22s
Reviewed-on: #164
v2.1.0
2026-10-14 08:59:20 +02:00
Tirsvad
a795f3b03e
Re-run the checks: the status of the previous head stayed pending
TirSystem/github-action: Sync GitHub mirror metadata / sync-metadata (push) Skipped
Validate workflows / validate (pull_request) Successful in 32s
2026-10-14 14:10:45 +08:00
Tirsvad
292886531e
Resolve pending commit links
TirSystem/github-action: Sync GitHub mirror metadata / sync-metadata (push) Skipped
Validate workflows / validate (pull_request) Successful in 28s
2026-10-14 14:05:29 +08:00
Tirsvad
5c5a1d19d9
MIL-010 task 8: adoption in a throwaway repository, results and RC-074; release entry 2.1.0
...
Task: MIL-010#8
Refs #162
2026-10-14 14:05:20 +08:00
Tirsvad
95f9577a14
MIL-010 task 7: guide, README, wiki pages in three languages
...
TirSystem/github-action: Sync GitHub mirror metadata / sync-metadata (push) Skipped
Task: MIL-010#7
Refs #161
2026-10-14 13:56:49 +08:00
Tirsvad
0dc5132a2e
MIL-010 task 6: the coverage report reaches the workflow as an artifact (ADR-0010, RC-073)
...
Task: MIL-010#6
Refs #160
2026-10-14 13:54:01 +08:00
Tirsvad
4fc0a8cab3
MIL-010 task 6: reusable workflow code-metrics.yml and tools/code-metrics.sh
...
Task: MIL-010#6
Refs #160
2026-10-14 13:50:34 +08:00
Tirsvad
5bc14d789d
MIL-010 tasks 4 and 5: counter, coverage reader and badge renderer
...
Task: MIL-010#4
Task: MIL-010#5
Refs #158
Refs #159
2026-10-14 13:48:04 +08:00
Tirsvad
6c3544837c
MIL-010 task 3: results of the delivery check
...
Refs #157
2026-10-14 13:44:34 +08:00
Tirsvad
aa4ca0f897
MIL-010 task 2: ADR-0010, the contract of the code metrics badges (RC-072)
...
Refs #156
2026-10-14 13:43:15 +08:00
Tirsvad
9ca9673b00
MIL-010 task 1: use case UC-008, stories US-001.18 to US-001.20, RC-069 to RC-071
...
Refs #155
2026-10-14 13:41:14 +08:00
Tirsvad
6d2020e9ab
Merge pull request 'MIL-010: plan the code metrics and coverage badges workflow' ( #154 ) from mil-010-code-metrics-badges into main
...
Publish accepted milestones / publish (push) Successful in 47s
Validate workflows / validate (push) Successful in 22s
TirSystem/github-action: Sync GitHub mirror metadata / sync-metadata (push) Successful in 5s
Reviewed-on: #154
2026-10-14 07:37:14 +02:00
Tirsvad
1c3d810284
Resolve pending commit links
Validate workflows / validate (pull_request) Successful in 24s
TirSystem/github-action: Sync GitHub mirror metadata / sync-metadata (push) Skipped
2026-10-14 13:35:57 +08:00
Tirsvad
50024505fe
MIL-010: plan the code metrics and coverage badges workflow
...
Adds objective O5 to BC-001 (RC-067), the milestone MIL-010 with nine tasks and
the plan row of PP-001 (RC-068); the traceability matrix is updated.
2026-10-14 13:35:53 +08:00
Tirsvad
285084fb0d
Merge pull request 'Move the framework pin from v0.6.2 to v0.7.0' ( #153 ) from framework-pin-0-7-0 into main
...
Validate workflows / validate (push) Successful in 25s
TirSystem/github-action: Sync GitHub mirror metadata / sync-metadata (push) Successful in 5s
Reviewed-on: #153
2026-10-14 06:57:39 +02:00
Tirsvad
bf54f346a5
Move the framework pin from v0.6.2 to v0.7.0
...
TirSystem/github-action: Sync GitHub mirror metadata / sync-metadata (push) Skipped
Validate workflows / validate (pull_request) Successful in 25s
v0.7.0 carries the conventions (gitignore API, LF line endings, CRUD
template), process/wiki.md and the publish-wiki.yml caller template, and its
files are LF. Tests (413) and the milestone sync dry run pass with it.
2026-10-14 12:56:12 +08:00
Tirsvad
f43d93d141
Merge pull request 'MIL-009: verification results and outcome review RC-066' ( #152 ) from mil-009-outcome into main
...
Publish accepted milestones / publish (push) Successful in 43s
TirSystem/github-action: Sync GitHub mirror metadata / sync-metadata (push) Successful in 6s
Validate workflows / validate (push) Successful in 22s
Reviewed-on: #152
2026-10-14 06:31:31 +02:00
Tirsvad
c8e111d2b5
Re-run the checks: the status of the previous head stayed pending
Validate workflows / validate (pull_request) Successful in 23s
TirSystem/github-action: Sync GitHub mirror metadata / sync-metadata (push) Skipped
2026-10-14 12:21:54 +08:00
Tirsvad
905b21dae9
Resolve pending commit links
TirSystem/github-action: Sync GitHub mirror metadata / sync-metadata (push) Skipped
Validate workflows / validate (pull_request) Successful in 25s
2026-10-14 12:19:04 +08:00
Tirsvad
95abc18a95
MIL-009: verification results and outcome review RC-066
...
All seven Go / No-Go criteria are met: framework v0.7.0, seven repositories
calling publish-wiki-pages.yml with 0-difference read-backs, no wiki/.publish
in 48 repositories, the scoped workflow removed, ADR-0004 superseded, 2.0.0
released with v1 left at 1.2.2. The acceptance is recorded as AI stand-in for
S01 (mode autonomous, not independent).
2026-10-14 12:19:02 +08:00