Tirsvad a1ff73580f Accept BC, SA, PP and MIL-001 after review
Review BC-001, SA-001, PP-001 and MIL-001 and record the results as
RC-001 to RC-004. All four verdicts are Go, so their Version History
rows become Accepted and the previous rows Deprecated. MIL-002 to
MIL-004 stay Proposed.

BC-001 failed criterion 1 (cost-benefit not justified as qualitative).
Add the justification and a target-completion constraint (2026-10-14)
that PP-001 and MIL-001 are checked against.

Add the Traceability Matrix (TM-001) and register RC and TM in the
artifact registry. PP has no QC checklist, so RC-003 checks the plan
against BC-001 and the milestones instead. Author and reviewer are
both S01, a deviation noted in each record.

Refs #5
2026-10-04 23:23:12 +08:00

1.8 KiB

Traceability Matrix

Metadata

Key Value
ID TM-001
CrossReference BC-001

Version History

Date Status Author Reviewer Change Commit
2026-10-04 Proposed Jens Tirsvad Nielsen S01 Initial version pending

Purpose

Tracks backward/forward links between artifact instances so that the Business Case traceability target is measurable. A row is added or updated whenever an artifact instance is created or reviewed.

Traceability Table

Artifact Instance Type Upstream (Backward Link) Downstream (Forward Link) Last Reviewed (RC-ID)
BC-001 BC - SA-001, PP-001 RC-001
SA-001 SA BC-001 PP-001 RC-002
PP-001 PP BC-001, SA-001 MIL-001, MIL-002, MIL-003, MIL-004 RC-003
MIL-001 MIL BC-001, PP-001 - RC-004
MIL-002 MIL BC-001, PP-001 - -
MIL-003 MIL BC-001, PP-001 - -
MIL-004 MIL BC-001, PP-001 - -

Coverage Notes

  • No use cases, user stories or design artifacts exist yet (UC-001 is planned for MIL-003).
  • - in Upstream means foundational; in Downstream, nothing is built on it yet; in Last Reviewed, no RC-* exists yet.