Review BC-001, SA-001, PP-001 and MIL-001 and record the results as RC-001 to RC-004. All four verdicts are Go, so their Version History rows become Accepted and the previous rows Deprecated. MIL-002 to MIL-004 stay Proposed. BC-001 failed criterion 1 (cost-benefit not justified as qualitative). Add the justification and a target-completion constraint (2026-10-14) that PP-001 and MIL-001 are checked against. Add the Traceability Matrix (TM-001) and register RC and TM in the artifact registry. PP has no QC checklist, so RC-003 checks the plan against BC-001 and the milestones instead. Author and reviewer are both S01, a deviation noted in each record. Refs #5
1.8 KiB
1.8 KiB
Traceability Matrix
Metadata
| Key | Value |
|---|---|
| ID | TM-001 |
| CrossReference | BC-001 |
Version History
| Date | Status | Author | Reviewer | Change | Commit |
|---|---|---|---|---|---|
| 2026-10-04 | Proposed | Jens Tirsvad Nielsen | S01 | Initial version | pending |
Purpose
Tracks backward/forward links between artifact instances so that the Business Case traceability target is measurable. A row is added or updated whenever an artifact instance is created or reviewed.
Traceability Table
| Artifact Instance | Type | Upstream (Backward Link) | Downstream (Forward Link) | Last Reviewed (RC-ID) |
|---|---|---|---|---|
| BC-001 | BC | - | SA-001, PP-001 | RC-001 |
| SA-001 | SA | BC-001 | PP-001 | RC-002 |
| PP-001 | PP | BC-001, SA-001 | MIL-001, MIL-002, MIL-003, MIL-004 | RC-003 |
| MIL-001 | MIL | BC-001, PP-001 | - | RC-004 |
| MIL-002 | MIL | BC-001, PP-001 | - | - |
| MIL-003 | MIL | BC-001, PP-001 | - | - |
| MIL-004 | MIL | BC-001, PP-001 | - | - |
Coverage Notes
- No use cases, user stories or design artifacts exist yet (UC-001 is planned for MIL-003).
-in Upstream means foundational; in Downstream, nothing is built on it yet; in Last Reviewed, noRC-*exists yet.