| 1 |
The plan states its start date, end date and the constraint it must fit |
Pass |
Planning Assumptions give the start and end dates (2026-11-21 to 2026-11-28); the Business Case sets no external deadline, so the plan keeps to its one-week target. |
| 2 |
Every milestone or gateway is listed once with its document, decision date and owner |
Pass |
The Gateway Schedule lists MIL-001, MIL-002 and MIL-003 once each with document, decision date and owner; all three documents exist and no gateway is missing from the plan. |
| 3 |
Every decision date lies inside the plan's window and is consistent with the dates in the linked MIL-* document |
Pass |
Every decision date lies in its window and equals the Target Date of its milestone (2026-11-22, 2026-11-26 and 2026-11-28). |
| 4 |
Every in-scope item of the Business Case is delivered at a named gateway (scope coverage) |
Pass |
Scope Coverage maps every In Scope item of BC-001 to a gateway; the screenshot item maps to MIL-002 and MIL-003. |
| 5 |
Dependencies between gateways are stated, acyclic and consistent with the schedule order |
Pass |
The chain MIL-001 to MIL-002 to MIL-003 is acyclic and in schedule order, as the Dependencies section says. |
| 6 |
The plan states what happens to later gateways and to the end date when a gateway is No-Go |
Pass |
Dependencies state that a No-Go on a gateway returns it to S01, moves the later gateway and the end date and that S01 decides the new date; each gateway needs its predecessor. |
| 7 |
Owners, reviewers and escalation roles use Stakeholder Analysis IDs and match the governance RACI |
Pass |
Owner S01 and reviewer S01 (or the stand-in for S01) are stakeholder IDs of SA-001; no governance document exists, so there is no RACI to contradict. |
| 8 |
Planning assumptions are listed with their source, and a changed baseline is recorded with its reason |
Pass |
Each planning assumption names its source or is a decision of S01; no baseline has been changed yet, so there is no move to record. |
| 9 |
Plan risks are listed with impact and a mitigation, and trace to Business Case risks where they come from there |
Pass |
Plan Risks give impact and mitigation for each of the two risks; the screenshot risk traces to the screenshot risk of BC-001. |
| 10 |
Open issues are listed, and none contradicts a statement elsewhere in the plan |
Pass |
Open Issues lists two points; none contradicts the rest of the plan. |
| 11 |
Each gateway's main deliverable is stated and matches the deliverable of its MIL-* document |
Pass |
The main deliverable of each gateway is the first-named deliverable of its milestone; for MIL-002 and MIL-003 it names the same items as their Deliverable sections. |
| 12 |
Gateways that deliver user stories name them, and those that do not say why |
Pass |
The Stories column says none for both gateways; the Open Issues explain that no use case or user story is modelled. |
| 13 |
The schedule view (table, Gantt) and the dependency view agree with each other |
Pass |
The Gantt bars use the dates of the schedule table; the dependency line agrees with the order. |
| 14 |
Each gateway is linked to its issue-tracker milestone, or marked as not yet synced |
Pass |
All three gateways are marked not yet synced; the links follow after the milestones are published. |
| 15 |
The plan is a singleton: one Project Plan per project, changes recorded in Version History |
Pass |
PP-001 is the only Project Plan; its Version History records each change in its own row and only the latest row is Accepted. |