TirSystem/git-workflows: Publish wiki / publish-wiki (push) Skipped
TirSystem/git-workflows: Release / release (pull_request) Successful in 19s
TirSystem/git-workflows: Validate / validate (pull_request) Successful in 32s
TirSystem/git-workflows: OpenGrep / opengrep (pull_request) Successful in 2m27s
TirSystem/git-workflows: Sync GitHub mirror metadata / sync-metadata (push) Successful in 16s
TirSystem/git-workflows: Publish accepted milestones / publish (push) Successful in 52s
TirSystem/git-workflows: Validate / validate (push) Successful in 33s
TirSystem/git-workflows: OpenGrep / opengrep (push) Successful in 4m38s
5.6 KiB
5.6 KiB
Review of PP-001
Metadata
| Key | Value |
|---|---|
| ID | RC-003 |
| CrossReference | PP-001, QC-PP-001 |
Version History
| Date | Status | Author | Reviewer | Change | Commit |
|---|---|---|---|---|---|
| 2026-11-06 | Proposed | Jens Tirsvad Nielsen | AI as stand-in for S01 | Initial version | 73a5a95 |
Artifact Under Review
- Instance reviewed: PP-001
- Checklist used: QC-PP-001
- Scope: full review
- Language and domain: en / it
- Language reviewer: none (the reviewer reads English and knows the IT domain)
- Mode: autonomous, not independent (AI as stand-in for S01)
Checklist Results
| # | Criterion | Status | Evidence/Notes |
|---|---|---|---|
| 1 | The plan states its start date, end date and the constraint it must fit | Pass | Start 2026-11-06, end 2026-11-10, constraint: one PR per milestone (BC-001 Constraints). |
| 2 | Every milestone or gateway is listed once with its document, decision date and owner | Pass | Five gateways, each with document, decision date and owner S01. |
| 3 | Every decision date lies inside the plan's window and is consistent with the dates in the linked MIL-* document |
Pass | Decision dates equal the Target Date of each MIL document and lie inside the window. |
| 4 | Every in-scope item of the Business Case is delivered at a named gateway (scope coverage) | Pass | Scope Coverage table maps every In Scope item to a gateway. |
| 5 | Dependencies between gateways are stated, acyclic and consistent with the schedule order | Pass | Chain MIL-001 to MIL-005 is acyclic and matches the dates. |
| 6 | The plan states what happens to later gateways and to the end date when a gateway is No-Go | Pass | Dependencies section: later gateways shift; S01 decides the end date. |
| 7 | Owners, reviewers and escalation roles use Stakeholder Analysis IDs and match the governance RACI | N-A | Owners and reviewers use S01; no governance document (GOV) exists in this small project, so no RACI to match. |
| 8 | Planning assumptions are listed with their source, and a changed baseline is recorded with its reason | Pass | Planning Assumptions lists sources; changes will be recorded in Version History. |
| 9 | Plan risks are listed with impact and a mitigation, and trace to Business Case risks where they come from there | Pass | Three plan risks with mitigation; two trace to BC-001 risks. |
| 10 | Open issues are listed, and none contradicts a statement elsewhere in the plan | Pass | Open Issues are current and do not contradict the plan. |
| 11 | Each gateway's main deliverable is stated and matches the deliverable of its MIL-* document |
Pass | Main deliverables match the Deliverable sections of the MIL documents. |
| 12 | Gateways that deliver user stories name them, and those that do not say why | Pass | Stories column says none (technical tasks). |
| 13 | The schedule view (table, Gantt) and the dependency view agree with each other | Pass | Gantt bars match the table; chain matches Dependencies. |
| 14 | Each gateway is linked to its issue-tracker milestone, or marked as not yet synced | Pass | Milestone column says not yet synced. |
| 15 | The plan is a singleton: one Project Plan per project, changes recorded in Version History | Pass | Single plan; Version History present. |
Language and Domain Results
| # | Criterion | Status | Evidence/Notes |
|---|---|---|---|
| 1 | The Metadata table has a Language row and a Domain row, and neither is a placeholder |
Pass | Checked against the document and the registry. |
| 2 | Language is a BCP 47 code and Domain is a value from the registry's domain list |
Pass | Checked against the document and the registry. |
| 3 | The content (prose and table cells) is written in the stated language | Pass | All prose and table cells are English, the PO language (registry PO language = en). |
| 4 | The register matches the one the registry gives for the artifact type | Pass | Register: IT Executive English for BC/PP/MIL, IT Professional English for SA/DICT; no implementation detail in the executive documents beyond file names. |
| 5 | Domain terms are the PO terms of the domain's dictionary, with no synonyms | Pass | Terms follow docs/dictionary.md (DICT-001): greeting, home page, lecture step, local environment, wrapper. |
| 6 | Metadata keys, section headings, IDs and statuses are in English | Pass | Checked against the document and the registry. |
| 7 | No translated twin (<name>.<language>.md) exists beside the document |
Pass | No *.en.md or other translated twin exists. |
| 8 | A change of language or domain since the previous accepted version has a Version History row and was reviewed again | Pass | First version; no earlier language to compare. |
| 9 | A reviewer competent in the domain, and in the language, has confirmed that the domain terms are used correctly | Pass | Reviewer S01 reads English and works in the IT domain (stand-in, not independent). |
| 10 | Abbreviations are spelled out on first use, in the stated language | Pass | FURPS+, BC, SA etc. are defined by the framework; ISO/IEC 25010 named in full. |
Overall Verdict
Go — All mandatory criteria pass (7 is not applicable).
Action Items
| Action | Owner | Due |
|---|---|---|
| None | S01 | - |