RC-003 Review of PP-001

Metadata

Key Value
ID RC-003
CrossReference PP-001, QC-PP-001, QC-LANG-001

Version History

Date Status Author Reviewer Change Commit
2026-10-28 Accepted Claude (AI) AI as stand-in for S01 Initial version: Go b344b6e

Artifact Under Review

  • Instance reviewed: PP-001
  • Checklist used: QC-PP-001 and QC-LANG-001
  • Scope: full review
  • Language and domain: en / it (the artifact's Metadata rows)
  • Language reviewer: none (S01 reads the language and knows the domain; the stand-in applies S01's role)
  • Mode: autonomous, not independent (the reviewer is AI as stand-in for S01)

Checklist Results

# Criterion Status Evidence/Notes
1 The plan states its start date, end date and the constraint it must fit Pass Start 2026-10-28, end 2026-11-02; the Business Case has no deadline, which the plan says.
2 Every milestone or gateway is listed once with its document, decision date and owner Pass Five gateways, each with document, decision date and owner S01, each linking to its MIL-*.
3 Every decision date lies inside the plan's window and is consistent with the dates in the linked MIL-* document Pass Decision dates in the plan equal the Target Date in each MIL-* and lie inside the window.
4 Every in-scope item of the Business Case is delivered at a named gateway (scope coverage) Pass Scope Coverage maps every In Scope item to a gateway.
5 Dependencies between gateways are stated, acyclic and consistent with the schedule order Pass Dependency chain MIL-001 to MIL-005 is acyclic and follows the schedule order.
6 The plan states what happens to later gateways and to the end date when a gateway is No-Go Pass Plan states that a No-Go moves later gateways and the end date, and that S01 decides.
7 Owners, reviewers and escalation roles use Stakeholder Analysis IDs and match the governance RACI Pass Owners are S01; no governance document exists in this project, so there is no RACI to contradict.
8 Planning assumptions are listed with their source, and a changed baseline is recorded with its reason Pass Planning Assumptions give their source.
9 Plan risks are listed with impact and a mitigation, and trace to Business Case risks where they come from there Pass Plan Risks have impact and mitigation and cite the Business Case risks they come from.
10 Open issues are listed, and none contradicts a statement elsewhere in the plan Pass Open Issues are current and do not contradict the plan.
11 Each gateway's main deliverable is stated and matches the deliverable of its MIL-* document Pass Each deliverable matches the Deliverable of its MIL-*.
12 Gateways that deliver user stories name them, and those that do not say why Pass Stories column says "none (technical tasks)".
13 The schedule view (table, Gantt) and the dependency view agree with each other Pass Gantt bars and the table agree; the chain matches the dependency list.
14 Each gateway is linked to its issue-tracker milestone, or marked as not yet synced Pass Each gateway is marked not yet synced.
15 The plan is a singleton: one Project Plan per project, changes recorded in Version History Pass One Project Plan; Version History present.

Language and Domain Results

# Criterion Status Evidence/Notes
1 The Metadata table has a Language row and a Domain row, and neither is a placeholder Pass Metadata has `Language
2 Language is a BCP 47 code and Domain is a value from the registry's domain list Pass en is a BCP 47 code; it is in the registry's domain list.
3 The content (prose and table cells) is written in the stated language Pass All prose and table cells are English; quoted file names and code stay as they are.
4 The register matches the one the registry gives for the artifact type Pass Register is IT Executive English. as the registry says for this type.
5 Domain terms are the PO terms of the domain's dictionary, with no synonyms Pass No domain dictionary exists yet, so no PO term can contradict one; the IT terms used (Selenium, CSS selector, Docker, headless, driver) are standard and used with one word per concept. Stand-in judgement, open to challenge.
6 Metadata keys, section headings, IDs and statuses are in English Pass Metadata keys, headings, IDs and statuses are English.
7 No translated twin (<name>.<language>.md) exists beside the document Pass No translated twin file exists beside the document.
8 A change of language or domain since the previous accepted version has a Version History row and was reviewed again Pass First version; language and domain have not changed.
9 A reviewer competent in the domain, and in the language, has confirmed that the domain terms are used correctly Pass Confirmed by AI as stand-in for S01 (S01 reads English and knows the IT domain, as the registry states). Not independent; open to challenge in the end-of-run summary.
10 Abbreviations are spelled out on first use, in the stated language Pass Abbreviations used (CSS, API, PNG, FURPS+, e2e) are spelled out on first use where they appear.

Overall Verdict

Go — Every Mandatory criterion of the type checklist and of QC-LANG-001 passes; no Fail. Stand-in review as AI as stand-in for S01, not independent: S01 can challenge it in the end-of-run summary.

Action Items

Action Owner Due
None S01 n/a