Review of PP-001

Metadata

Key Value
ID RC-003
CrossReference PP-001, QC-PP-001

Version History

Date Status Author Reviewer Change Commit
2026-10-28 Proposed Jens Tirsvad Nielsen AI as stand-in for S01 Initial version 01e016e

Artifact Under Review

  • Instance reviewed: PP-001
  • Checklist used: QC-PP-001 (QC-PP-001)
  • Scope: full review
  • Language and domain: en / it
  • Language reviewer: S01 (confirmed criteria 3, 5, 9 in chat on 2026-10-28)
  • Mode: autonomous, not independent (reviewer is AI as stand-in for S01)

Checklist Results

# Criterion Status Evidence/Notes
1 The plan states its start date, end date and the constraint it must fit Pass Planning Assumptions give start 2026-10-28 and end 2026-11-30, the Business Case window.
2 Every milestone or gateway is listed once with its document, decision date and owner Pass Seven rows, each with its MIL-* link, decision date and owner S01.
3 Every decision date lies inside the plan's window and is consistent with the dates in the linked MIL-* document Pass Decision dates equal the Target Date of each linked MIL document and lie inside the window.
4 Every in-scope item of the Business Case is delivered at a named gateway (scope coverage) Pass Scope Coverage table maps every In Scope item to a gateway.
5 Dependencies between gateways are stated, acyclic and consistent with the schedule order Pass Chain MIL-001 to MIL-007 is acyclic and matches the dates.
6 The plan states what happens to later gateways and to the end date when a gateway is No-Go Pass Dependencies section states the effect of a No-Go and that S01 moves the end date.
7 Owners, reviewers and escalation roles use Stakeholder Analysis IDs and match the governance RACI Pass Only S01 is named, matching the GOV-001 RACI.
8 Planning assumptions are listed with their source, and a changed baseline is recorded with its reason Pass Planning Assumptions list sources; the browser.json assumption is explicit.
9 Plan risks are listed with impact and a mitigation, and trace to Business Case risks where they come from there Pass Plan Risks have impact and mitigation; the first traces to the Business Case browser.json risk.
10 Open issues are listed, and none contradicts a statement elsewhere in the plan Pass Open Issues list the owner name difference and the browser.json dependency; no contradiction.
11 Each gateway's main deliverable is stated and matches the deliverable of its MIL-* document Pass Main deliverable column is the first clause of each MIL Deliverable.
12 Gateways that deliver user stories name them, and those that do not say why Pass Stories column says none (technical tasks).
13 The schedule view (table, Gantt) and the dependency view agree with each other Pass Gantt bars use the table dates.
14 Each gateway is linked to its issue-tracker milestone, or marked as not yet synced Pass Milestone column says not yet synced.
15 The plan is a singleton: one Project Plan per project, changes recorded in Version History Pass One Project Plan, PP-001.

Language and Domain Results

# Criterion Status Evidence/Notes
1 The Metadata table has a Language row and a Domain row, and neither is a placeholder Pass Language en and Domain it are in Metadata.
2 Language is a BCP 47 code and Domain is a value from the registry's domain list Pass en is BCP 47; it is in the registry domain list.
3 The content (prose and table cells) is written in the stated language Pass Confirmed by S01 in chat on 2026-10-28 (the document is English prose).
4 The register matches the one the registry gives for the artifact type Pass Register IT Executive English or IT Professional English per the registry table.
5 Domain terms are the PO terms of the domain's dictionary, with no synonyms Pass Confirmed by S01 in chat on 2026-10-28; no dictionary (DICT) exists yet, so the terms are the standard IT terms.
6 Metadata keys, section headings, IDs and statuses are in English Pass Keys, headings, IDs and statuses are English.
7 No translated twin (<name>.<language>.md) exists beside the document Pass No translated twin exists.
8 A change of language or domain since the previous accepted version has a Version History row and was reviewed again Pass First version; no language change.
9 A reviewer competent in the domain, and in the language, has confirmed that the domain terms are used correctly Pass Confirmed by S01 in chat on 2026-10-28 (S01 is the domain expert and reads English).
10 Abbreviations are spelled out on first use, in the stated language Pass Abbreviations are spelled out at first use (PO, ARB, QC, FURPS+).

Overall Verdict

Go — every Mandatory criterion passes; no blocking finding. Language criteria 3, 5 and 9 were confirmed by S01 in chat on 2026-10-28, so none stays Pending.

Action Items

Action Owner Due
None S01 -