Project Plan
Metadata
| Key | Value |
|---|---|
| ID | PP-001 |
| CrossReference | BC-001, SA-001, MIL-001, MIL-002, MIL-003, MIL-004, MIL-005 |
| Language | en |
| Domain | it |
Version History
| Date | Status | Author | Reviewer | Change | Commit |
|---|---|---|---|---|---|
| 2026-10-28 | Accepted | Jens Tirsvad Nielsen | S01 (AI as stand-in, autonomous mode) | Initial version | dcef5e6 |
Purpose
Schedule the five gateways that deliver the Day 45 scraping repository. The Business Case sets no deadline, so the plan only fixes the order and a working window per gateway.
Planning Assumptions
- Week 1 starts 2026-10-28; the plan ends by 2026-11-14 (no hard deadline in BC-001).
- Phase length: two to four days; each phase is one branch and one pull request.
- Communication follows SA-001: plan acceptance in chat, one pull request per milestone, run summary at the end.
- Autonomous mode: S01 accepts this plan once; the AI then runs every gateway and acts as stand-in reviewer, recorded in each RC record.
Gateway Schedule
| Gateway | Document | Window | Decision date | Owner | Stories | Main deliverable | Milestone |
|---|---|---|---|---|---|---|---|
| Repository Setup | MIL-001 | 2026-10-28 to 2026-10-30 | 2026-10-30 | S01 | none (technical tasks) | Repository metadata, configuration, README, CI | Milestone 259 (closed) |
| Parsing HTML | MIL-002 | 2026-10-31 to 2026-11-03 | 2026-11-03 | S01 | none (technical tasks) | soup_basics module, tests, screenshots |
Milestone 260 (closed) |
| Hacker News | MIL-003 | 2026-11-04 to 2026-11-06 | 2026-11-06 | S01 | none (technical tasks) | hacker_news module, ethics note, screenshots |
Milestone 261 (closed) |
| Top 100 Movies | MIL-004 | 2026-11-07 to 2026-11-10 | 2026-11-10 | S01 | none (technical tasks) | movies module and movies.txt, screenshots |
Milestone 262 (closed) |
| Wiki | MIL-005 | 2026-11-11 to 2026-11-14 | 2026-11-14 | S01 | none (technical tasks) | Wiki in en, da, ms | Milestone 263 (closed) |
@startgantt
Project starts 2026-10-28
[Repository Setup] starts 2026-10-28 and ends 2026-10-30
[Parsing HTML] starts 2026-10-31 and ends 2026-11-03
[Hacker News] starts 2026-11-04 and ends 2026-11-06
[Top 100 Movies] starts 2026-11-07 and ends 2026-11-10
[Wiki] starts 2026-11-11 and ends 2026-11-14
[MIL-001 Go/No-Go] happens 2026-10-30
[MIL-002 Go/No-Go] happens 2026-11-03
[MIL-003 Go/No-Go] happens 2026-11-06
[MIL-004 Go/No-Go] happens 2026-11-10
[MIL-005 Go/No-Go] happens 2026-11-14
@endgantt
Scope Coverage
| Business Case scope item | Gateway |
|---|---|
pyproject.toml, .gitignore, Doxyfile, constants.py, README skeleton |
MIL-001 |
| Repository description and topics, workflows | MIL-001 |
| Parsing HTML, finding and selecting elements | MIL-002 |
| Hacker News scraping and the ethics note | MIL-003 |
100 movies and movies.txt |
MIL-004 |
| Wiki in en, da, ms and screenshots per step | MIL-005 (screenshots are taken in MIL-002 to MIL-004) |
Dependencies
MIL-001 → MIL-002 → MIL-003 → MIL-004 → MIL-005
A No-Go on a gateway is fixed and re-reviewed; after three failed rounds the run stops and reports (AGENTS.md). Later dates move by the same amount; S01 decides a move of the end date.
Plan Risks
| Risk | Impact | Mitigation |
|---|---|---|
| Target repository name differs from the one named in the request | Metadata set on the wrong repository | Resolved: S01 chose the origin remote at plan acceptance |
Reusable workflow path differs (TirSystem/git-workflows in the template, TirSystem/github-action named in the request) |
Workflow calls fail | Verify the path on the host in MIL-001 before installing |
| Danish and Malay translation quality | Review finds errors | Keep sentences short; English is authoritative |
| Network access to Wayback during the run | Fixture cannot be saved | Retry once; alternative live Empire URL |
Open Issues
- Target repository: S01 chose the origin remote (
Tirsvad-Udemy-100-days-of-code/045-scrape-movies) when accepting the plan; the namedTirsvad-Udemy-100_days_of_codeis not used. - Wiki publication is a scoped workflow in
TirSystem/github-action(no file needed) while the framework templatepublish-wiki.ymlalso exists; MIL-001 records which one applies. - "Screenshot per lecture step" is planned as rendered terminal output and browser-pane captures, never host desktop capture.