# Review Record: Milestone MIL-001
|
|
|
|
## Metadata
|
|
| Key | Value |
|
|
| --- | --- |
|
|
| ID | RC-003 |
|
|
| CrossReference | [MIL-001], [BC-001], [QC-MIL-001], [QC-LANG-001] |
|
|
|
|
## Version History
|
|
| Date | Status | Author | Reviewer | Change | Commit |
|
|
| --- | --- | --- | --- | --- | --- |
|
|
| 2026-10-07 | Accepted | Jens Tirsvad Nielsen | S01 | Initial version (draft prepared by the assistant for S01 to confirm) | [b823d1f] |
|
|
|
|
---
|
|
|
|
## Artifact Under Review
|
|
|
|
- Instance reviewed: [MIL-001]
|
|
- Checklist used: [QC-MIL-001], together with [QC-LANG-001] because the milestone is written in the PO language
|
|
- Scope: full review
|
|
- Language and domain: en / it (the artifact's Metadata rows)
|
|
- Language reviewer: none. S01 reads English and knows the IT domain. S01 is also the author; S01 accepted a documented self-review on 2026-10-07 (see [BC-001] review record, Action Item 1)
|
|
|
|
**Status of this record:** final. The assistant read the milestone against
|
|
every criterion and recorded what it found; S01 confirmed the open point on
|
|
2026-10-07 and the verdict is `Go`.
|
|
|
|
## Checklist Results
|
|
|
|
| # | Criterion | Status | Evidence/Notes |
|
|
| --- | --- | --- | --- |
|
|
| 1 | A concrete deliverable is defined for every gate | Pass | Deliverable: the palette function in the source file under `src/`, its tests and the printed palette of the real image. It is a tangible output, not a date |
|
|
| 2 | Explicit Go/No-Go criteria are stated for each gate | Pass | Five criteria, each with a Go and a No-Go column and a check that can be run (imports, colour count, white threshold 240, tests, review record) |
|
|
| 3 | Dependencies on other milestones are explicitly mapped | Pass | Dependencies table says "None" with the reason: it is the first gateway and the baseline documents are `Accepted` |
|
|
| 4 | Each milestone is traceable to a Business Case objective or KPI | Pass | Traceability table maps O2 and O5 of [BC-001] to the criteria and to SC3 and SC7 |
|
|
| 5 | Milestone owner and approving reviewer are identified | Pass | Ownership table gives S01 for both; the shared identity is the accepted self-review |
|
|
| 6 | Milestone has a defined target date consistent with project constraints | Pass | 2026-10-09, inside the one-week limit of [BC-001] (2026-10-07 to 2026-10-14) |
|
|
|
|
## Language and Domain Results
|
|
|
|
| # | Criterion | Status | Evidence/Notes |
|
|
| --- | --- | --- | --- |
|
|
| 1 | The Metadata table has a `Language` row and a `Domain` row, and neither is a placeholder | Pass | The `Language` row says `en` and the `Domain` row says `it`; `check-languages.sh --list` reports both |
|
|
| 2 | `Language` is a BCP 47 code and `Domain` is a value from the registry's domain list | Pass | `en` is a BCP 47 code; `it` is in the registry's domain list ("Software and IT") |
|
|
| 3 | The content (prose and table cells) is written in the stated language | Pass | All prose and table cells are English; tool names are established technical terms |
|
|
| 4 | The register matches the one the registry gives for the artifact type | Pass | Registry gives IT Executive English for MIL. Purpose, Deliverable and the Go/No-Go table state decisions and checks. The Tasks table is more technical (`import turtle`, `pip`) because the milestone reference requires each summary to be understood as an Issue without opening the file. S01 confirmed this reading on 2026-10-07 (Action Item 1) |
|
|
| 5 | Domain terms are the PO terms of the domain's dictionary, with no synonyms | Pass | S01 confirmed on 2026-10-07 that no dictionary is needed; the terms *dot*, *palette*, *painting*, *grid* and *phase* match [BC-001] |
|
|
| 6 | Metadata keys, section headings, IDs and statuses are in English | Pass | Headings follow the MIL reference exactly |
|
|
| 7 | No translated twin (`<name>.<language>.md`) exists beside the document | Pass | Only `docs/milestones/mil-001-palette.md` exists |
|
|
| 8 | A change of language or domain since the previous accepted version has a Version History row and was reviewed again | N-A | First version; there is no previous accepted version |
|
|
| 9 | A reviewer competent in the domain, and in the language, has confirmed that the domain terms are used correctly | Pass | S01 confirmed on 2026-10-07 that the domain terms are used correctly (Action Item 1). S01 is also the author; the self-review was accepted by S01 |
|
|
| 10 | Abbreviations are spelled out on first use, in the stated language | Pass | SC3, SC7, O2 and O5 are defined in [BC-001] and cited with it; RGB is spelled out at its first use in task 5, and Tk is explained in task 1 as the graphical toolkit behind `turtle` |
|
|
|
|
## Overall Verdict
|
|
|
|
Go — every criterion of [QC-MIL-001] and of [QC-LANG-001] passes (criterion 8 of [QC-LANG-001] is N-A for a first version). S01 accepted the documented self-review and confirmed on 2026-10-07 that the domain terms are used correctly and that the technical wording of the Tasks table is acceptable. The action item is closed. The milestone may now be synced to the git host and its tasks may start (plan-first gate).
|
|
|
|
## Action Items
|
|
|
|
| # | Action | Owner | Due |
|
|
| --- | --- | --- | --- |
|
|
| 1 | Confirm that the domain terms are used correctly (QC-LANG-001 criterion 9), and that the technical wording of the Tasks table is acceptable in a milestone of register IT Executive English. **Closed 2026-10-07:** S01 confirmed both points | S01 | 2026-10-08 |
|
|
|
|
---
|
|
|
|
[MIL-001]: ../../milestones/mil-001-palette.md
|
|
[BC-001]: ../../business-case.md
|
|
[QC-MIL-001]: ../../../framework/qc/qc-milestones-gateways.md
|
|
[QC-LANG-001]: ../../../framework/qc/qc-language-domain.md
|
|