Files
015-coffee-machine/docs/sqa/reviews/rc-002-stakeholder-analysis.md
T
Tirsvad 8ef00aafaa Add SQA review records and plan MIL-004 Code Review and CI
Add RC-001 to RC-005 for the Business Case, Stakeholder Analysis and
MIL-001 to MIL-003, checked against their QC checklists, and a
traceability matrix. The reviews found a missing duration constraint in
the Business Case; BC-001 v2 adds it, and SA-001 v2 records the
sign-off. Register RC and TM in the artifact registry.

Plan MIL-004 (review the source against QC-PY-001, add a CI workflow)
as Proposed, with Business Case objective 6, a Project Plan gateway
row and a matrix entry. The milestone is not yet synced to the git host.

No issue closed: planning and review documents only, no code changed.
2026-10-06 20:42:51 +08:00

49 lines
2.6 KiB
Markdown

# RC-002 Stakeholder Analysis Review
## Metadata
| Key | Value |
| --- | --- |
| ID | RC-002 |
| CrossReference | [SA-001], [QC-SA-001] |
## Version History
| Date | Status | Author | Reviewer | Change | Commit |
| --- | --- | --- | --- | --- | --- |
| 2026-10-06 | Proposed | Jens Tirsvad Nielsen | S01 | Initial version | pending |
---
## Artifact Under Review
- Instance reviewed: [SA-001] (docs/stakeholder-analysis.md)
- Checklist used: [QC-SA-001] (`QC-SA-001`)
- Independence: S01 is the only stakeholder and is also the recorded author, so the reviewer-is-not-author rule cannot be met. The documents were drafted by Claude on S01's behalf; S01 reviews and signs. This is a known limit of a one-person project, not a clean independent review.
## Checklist Results
| # | Criterion | Status | Evidence/Notes |
| --- | --- | --- | --- |
| 1 | Power/Interest grid is filled for every stakeholder, with no gaps or unclassified entries | Pass | S01 to S03 each have power, interest and quadrant. |
| 2 | Each stakeholder is assigned a unique, stable ID (e.g. S01-S11 style) reusable for RACI assignments in other artifacts | Pass | IDs S01 to S03 are used by every other document. |
| 3 | Roles and organizational context are defined with explicit Power and Interest levels, not just narrative description | Pass | Levels are stated as High/Low in the table, with organisation and role. |
| 4 | Communication needs (channel, frequency, deliverable type) are mapped to project phases or milestones | Pass | Communication table maps each stakeholder to MIL-001 to MIL-003. |
| 5 | Conflicting stakeholder interests are identified with documented mitigation or resolution strategies | Pass | One conflict (assignment names vs testable structure) with a mitigation. |
| 6 | Stakeholder concerns are explicitly traced to Business Case objectives | Pass | Traceability table maps each stakeholder to [BC-001] objectives. |
| 7 | Primary concerns are expressed in both business language and a recognized quality-attribute mapping (e.g. FURPS+) | Pass | Each concern has a FURPS+ attribute. |
| 8 | Document is understandable and navigable by non-technical stakeholders reviewing their own entry | Pass | Plain language, short; each stakeholder can find their own row. |
## Overall Verdict
Go — all criteria pass. The Sign-Off row said `Pending review` and was updated to the Go in SA-001 v2.
## Action Items
| Action | Owner | Due |
| --- | --- | --- |
| Record the sign-off in SA-001 (done in v2) | S01 | 2026-10-06 |
---
[SA-001]: ../../stakeholder-analysis.md
[QC-SA-001]: ../../../framework/qc/qc-stakeholder-analysis.md