English · Dansk · Bahasa Malaysia
Reflection
How the project was approached
We planned first: a Business Case, a Stakeholder Analysis, a Project Plan and five milestones, each reviewed before code was written. The code was then built in small layers (domain, application, infrastructure, command line), each with tests.
What was hard
Making every step safe. A file mover can lose data, so name clashes, files that were moved away before an undo, and unfinished downloads all needed a rule and a test. The three-language wiki also takes time.
What was easy
The standard library does almost everything: pathlib, shutil, json and argparse. No third-party package was needed.
Biggest learning
A dry run and an undo log turn a risky script into a tool that can be trusted. Automation is not only about saving time; it is about being able to see and reverse what the script did.
What to do differently next time
Add more rules, for example sorting by date, and a setting file for the user's own folders. Take the screenshots from the start of the work, as the code grows, instead of at the end.