TirSystem/git-workflows: CI / secret-scan (push) Skipped
TirSystem/git-workflows: CI / validate (push) Skipped
TirSystem/git-workflows: CI / opengrep (push) Skipped
TirSystem/git-workflows: CI / release-check (push) Skipped
TirSystem/git-workflows: Publish wiki / publish-wiki (push) Skipped
TirSystem/git-workflows: Release / release (push) Skipped
TirSystem/git-workflows: Sync GitHub mirror metadata / sync-metadata (push) Skipped
TirSystem/git-workflows: Publish accepted milestones / publish (push) Skipped
TirSystem/git-workflows: Validate / validate (push) Skipped
TirSystem/git-workflows: CI / secret-scan (pull_request) Successful in 12s
Tests / test (pull_request) Successful in 42s
TirSystem/git-workflows: Release / release (pull_request) Successful in 7s
TirSystem/git-workflows: Validate / validate (pull_request) Successful in 20s
TirSystem/git-workflows: OpenGrep / opengrep (pull_request) Successful in 58s
TirSystem/git-workflows: CI / validate (pull_request) Successful in 18s
TirSystem/git-workflows: CI / release-check (pull_request) Successful in 6s
TirSystem/git-workflows: CI / opengrep (pull_request) Successful in 53s
4.2 KiB
4.2 KiB
Project Plan
Metadata
| Key | Value |
|---|---|
| ID | PP-001 |
| CrossReference | BC-001, SA-001, MIL-001, MIL-002, MIL-003 |
| Language | en |
| Domain | it |
Version History
| Date | Status | Author | Reviewer | Change | Commit |
|---|---|---|---|---|---|
| 2026-11-21 | Deprecated | Jens Tirsvad Nielsen | Stand-in for S01 | Accepted with a Go (RC-003); reviewed in autonomous mode, not independent | 587a239 |
| 2026-11-21 | Accepted | Jens Tirsvad Nielsen | Stand-in for S01 | Linked the three milestones of the git host in the schedule and updated the open issues; reviewed in autonomous mode, not independent (RC-018) | 0449c45 |
Purpose
Schedules the three gateways of the Space Invaders project within one week, with one branch and one pull request per task so the steps stay traceable.
Planning Assumptions
- The plan starts 2026-11-21 and ends by 2026-11-28; the Business Case sets no external deadline.
- Phase length: one to four days; one pull request per task.
- S01 owns, builds and reviews; review is by S01 or, in autonomous mode, by a stand-in for S01, and the review record says so.
- Screenshots are taken in a Docker container, never on the host desktop.
Gateway Schedule
| Gateway | Document | Window | Decision date | Owner | Stories | Main deliverable | Milestone |
|---|---|---|---|---|---|---|---|
| Project setup | MIL-001 | 2026-11-21 to 2026-11-22 | 2026-11-22 | S01 | none | Scaffold, README, screenshot harness, repository description and topics | milestone-698 |
| Game build | MIL-002 | 2026-11-22 to 2026-11-26 | 2026-11-26 | S01 | none | Playable, tested game built in nine steps | milestone-699 |
| Wiki and screenshots | MIL-003 | 2026-11-26 to 2026-11-28 | 2026-11-28 | S01 | none | README screenshots and wiki in three languages | milestone-700 |
@startgantt
Project starts 2026-11-21
[Project setup] starts 2026-11-21 and ends 2026-11-22
[Game build] starts 2026-11-22 and ends 2026-11-26
[Wiki and screenshots] starts 2026-11-26 and ends 2026-11-28
[MIL-003 Go/No-Go] happens 2026-11-28
@endgantt
Scope Coverage
| Business Case scope item | Gateway |
|---|---|
pyproject.toml, .gitignore, constants.py, Doxyfile, README, tests set-up |
MIL-001 |
| Repository description and topics, local scan | MIL-001 |
| Game, barriers, game over, score and lives, tests, Doxygen comments | MIL-002 |
| Screenshot per build step | MIL-002 (taken) and MIL-003 (published) |
| Wiki in three languages and reflection journal | MIL-003 |
Dependencies
MIL-001 → MIL-002 → MIL-003
Each gateway needs the one before it. A No-Go returns the gateway to S01 and moves the later dates; S01 decides the new date.
Plan Risks
| Risk | Impact | Mitigation |
|---|---|---|
| Tk in the Docker image or the virtual display fails | No screenshots | Build the harness first (MIL-001 task 4); stop and report if no isolated environment works |
| Translations lag the English text | Gateway date slips | English is authoritative; translate page by page after it is stable |
Open Issues
- No use case or user story is modelled: the tasks are technical or documentation tasks, so the Stories column says
none. - The git host published the three milestones after the first merge (milestones 698 to 700); MIL-001 and MIL-002 are finished and their issues are closed, and the milestones are closed when MIL-003 is merged.