1
Step 6 Wrap Up
Tirsvad edited this page 2026-11-20 12:57:32 +01:00

English · Dansk · Bahasa Malaysia

Step 6: Wrap-up and reflection

Step 6: the finished board

What we built

The last step adds no feature. It checks that the whole project works for the people it is for: a course participant who clones it, creates a .venv, runs the tests and starts the board, and a visitor who only reads the description, the README and this wiki. The full quality pass (tests, coverage, the browser tests in a container, source documentation, the code scan and the framework checks) ran on the final code.

What we gained

  • A project that can be handed over. The README setup was followed literally in a clean container.
  • One page set in three languages, with a sidebar and a language line on every page.
  • A reflection (below) that names what was easy, what was hard and what we would change.

Reflection

  • Approach. Plan first: a business case, stakeholders, a project plan and six milestones were accepted before the first line of code. Each milestone was one branch, one review and one pull request, and each step produced a screenshot and a wiki page.
  • What was easy. The domain rules and SQLite. A board, lists and cards are a small model, and the layers kept the rules free of HTTP and SQL, so most tests ran in milliseconds against an in-memory store.
  • What was hard. Drag and drop. The browser events are low level: the drop position has to be computed from the pointer, and a test must drag with a real browser. Dates were also harder than expected, because a forgiving parser accepts shapes you do not want.
  • Biggest learning. A framework is a choice with a cost. The standard library (http.server, sqlite3) was enough, so the project has no runtime dependencies and the reader sees every layer. A web framework would have saved routing code; it would also have hidden the lesson.
  • What to do differently. Start the browser tests earlier, give the router a small test table from day one, and decide on the stack with the user before the first milestone, so a late change of mind costs nothing.