Files
Tirsvad ef256a9e4d
TirSystem/git-workflows: Publish wiki / publish-wiki (push) Skipped
TirSystem/git-workflows: Release / release (pull_request) Successful in 21s
TirSystem/git-workflows: Validate / validate (pull_request) Successful in 37s
TirSystem/git-workflows: OpenGrep / opengrep (pull_request) Successful in 4m19s
TirSystem/git-workflows: Sync GitHub mirror metadata / sync-metadata (push) Successful in 15s
TirSystem/git-workflows: Publish accepted milestones / publish (push) Successful in 42s
TirSystem/git-workflows: Validate / validate (push) Successful in 40s
TirSystem/git-workflows: OpenGrep / opengrep (push) Successful in 5m43s
Resolve review record commit links
2026-11-06 12:17:46 +08:00

66 lines
3.8 KiB
Markdown

# RC-004 review
## Metadata
| Key | Value |
| --- | --- |
| ID | RC-004 |
| CrossReference | [MIL-001], [QC-MIL-001] |
## Version History
| Date | Status | Author | Reviewer | Change | Commit |
| --- | --- | --- | --- | --- | --- |
| 2026-11-06 | Accepted | Jens Tirsvad Nielsen | AI as stand-in for S01 | Initial version | [fe0f272] |
---
## Artifact Under Review
- Instance reviewed: [MIL-001]
- Checklist used: [QC-MIL-001]
- Scope: full review
- Language and domain: en / it
- Language reviewer: none, the reviewer reads English and knows the IT domain
- Mode: autonomous, not independent (the reviewer is `AI as stand-in for S01`)
## Checklist Results
| # | Criterion | Status | Evidence/Notes |
| --- | --- | --- | --- |
| 1 | A concrete deliverable is defined for every gate | Pass | The Deliverable section names concrete output |
| 2 | Explicit Go/No-Go criteria are stated for each gate | Pass | The Go / No-Go table has objectively checkable rows |
| 3 | Dependencies on other milestones are explicitly mapped | Pass | The Dependencies table maps the predecessor, or the baseline for MIL-001 |
| 4 | Each milestone is traceable to a Business Case objective or KPI | Pass | Traceability cites BC-001 Objectives 5 and 7 |
| 5 | Milestone owner and approving reviewer are identified | Pass | Owner and approving reviewer are S01 |
| 6 | Milestone has a defined target date consistent with project constraints | Pass | Target date 2026-11-08 lies inside the Business Case duration (to 2026-11-16) |
## Language and Domain Results
| # | Criterion | Status | Evidence/Notes |
| --- | --- | --- | --- |
| 1 | The Metadata table has a `Language` row and a `Domain` row, and neither is a placeholder | Pass | Metadata has `Language | en` and `Domain | it`, no placeholder |
| 2 | `Language` is a BCP 47 code and `Domain` is a value from the registry's domain list | Pass | `en` is BCP 47; `it` is in the registry domain list |
| 3 | The content (prose and table cells) is written in the stated language | Pass | MIL-001 prose and table cells are in English |
| 4 | The register matches the one the registry gives for the artifact type | Pass | Register is IT Executive English for BC, PP and MIL, IT Professional English for SA, as the registry gives |
| 5 | Domain terms are the PO terms of the domain's dictionary, with no synonyms | Pass | Only standard IT terms are used (Flask, route, decorator, test); the project has no `DICT` and no PO-specific term needs one |
| 6 | Metadata keys, section headings, IDs and statuses are in English | Pass | Metadata keys, headings, IDs and statuses are English |
| 7 | No translated twin (`<name>.<language>.md`) exists beside the document | Pass | No `.en.md`/`.da.md` twin exists beside the document |
| 8 | A change of language or domain since the previous accepted version has a Version History row and was reviewed again | Pass | No change of language or domain; this is the first version |
| 9 | A reviewer competent in the domain, and in the language, has confirmed that the domain terms are used correctly | Pass | AI as stand-in for S01 read the terms as correct IT usage; S01 accepted the plan in chat on 2026-11-06. Stand-in decision, not independent; open to challenge in the run summary |
| 10 | Abbreviations are spelled out on first use, in the stated language | Pass | Abbreviations (BC, SA, MIL, GIF, HTML, PR) are spelled out or are standard IT abbreviations |
## Overall Verdict
Go — All criteria pass; no blocking finding.
## Action Items
| Action | Owner | Due |
| --- | --- | --- |
| None | S01 | 2026-11-06 |
---
[MIL-001]: ../../docs/milestones/mil-001-project-setup.md
[QC-MIL-001]: ../../framework/qc/artifacts/qc-milestones-gateways.md
[fe0f272]: https://git.tirsystem.com/Tirsvad-Udemy-100-days-of-code/055-higher-lower/commit/fe0f2722c25220f6efa3b9b2f3d5e01e7f6d90dc