TirSystem/git-workflows: OpenGrep / opengrep (push) Skipped
TirSystem/git-workflows: Sync GitHub mirror metadata / sync-metadata (push) Skipped
TirSystem/git-workflows: Publish accepted milestones / publish (push) Skipped
TirSystem/git-workflows: Validate / validate (push) Skipped
TirSystem/git-workflows: Release / release (pull_request) Successful in 17s
TirSystem/git-workflows: Validate / validate (pull_request) Successful in 32s
TirSystem/git-workflows: Publish wiki / publish-wiki (push) Skipped
TirSystem/git-workflows: OpenGrep / opengrep (pull_request) Successful in 4m16s
5.3 KiB
5.3 KiB
RC-003 Review of MIL-001 Project baseline and repository
Metadata
| Key | Value |
|---|---|
| ID | RC-003 |
| CrossReference | MIL-001, QC-MIL-001, QC-LANG-001 |
Version History
| Date | Status | Author | Reviewer | Change | Commit |
|---|---|---|---|---|---|
| 2026-11-06 | Proposed | Jens Tirsvad Nielsen | AI as stand-in for S01 | Initial version | a07d05b |
Artifact Under Review
- Instance reviewed: MIL-001
- Checklist used: QC-MIL-001 and QC-LANG-001 (the type is written in the PO language)
- Scope: full review. Round 1 found the defects named under Overall Verdict; they were fixed in the document and the criteria re-checked in round 2, which this record shows.
- Language and domain: en / it
- Language reviewer: S01 (a person; confirmed criteria 3, 5 and 9 of QC-LANG-001 in chat on 2026-11-06)
- Mode: autonomous, not independent (the reviewer is
AI as stand-in for S01; S01 is also the author, the Product Owner and the named reviewer)
Checklist Results
| # | Criterion | Status | Evidence/Notes |
|---|---|---|---|
| 1 | A concrete deliverable is defined for every gate | Pass | "Deliverable": pyproject.toml, Python .gitignore, Doxyfile, README, ADR-0001, repository description and topics |
| 2 | Explicit Go/No-Go criteria are stated for each gate | Pass | Six criteria, each checkable by a command or an API call. Round 1 defect (fixed): the deliverable ADR-0001 had no criterion; criterion 6 added |
| 3 | Dependencies on other milestones are explicitly mapped | Pass | "Dependencies": none, first gateway; matches PP-001 |
| 4 | Each milestone is traceable to a Business Case objective or KPI | Pass | Objectives 3 and 5; round 1 added success criteria 3 and 6, which Go criteria 1 and 5 verify |
| 5 | Milestone owner and approving reviewer are identified | Pass | Owner S01, approving reviewer S01. Note: the same person, so not independent; the project has no governance document that requires otherwise |
| 6 | Milestone has a defined target date consistent with project constraints | Pass | 2026-11-06, before the BC-001 target 2026-11-09; equals the decision date in PP-001 |
Language and Domain Results
| # | Criterion | Status | Evidence/Notes |
|---|---|---|---|
| 1 | The Metadata table has a Language row and a Domain row, and neither is a placeholder |
Pass | Metadata has Language = en and Domain = it |
| 2 | Language is a BCP 47 code and Domain is a value from the registry's domain list |
Pass | en is a BCP 47 code; it is in the domain table of docs/artifact-registry.md |
| 3 | The content (prose and table cells) is written in the stated language | Pass | Confirmed by S01 (a person) in chat, 2026-11-06. The English wording is correct |
| 4 | The register matches the one the registry gives for the artifact type | Pass | IT Executive English: purpose and target date read at a glance; Go/No-Go criteria are necessarily concrete (files, commands) so that they are checkable |
| 5 | Domain terms are the PO terms of the domain's dictionary, with no synonyms | Pass | Confirmed by S01 (a person) in chat, 2026-11-06. No DICT exists; the PO confirmed the terms are correct |
| 6 | Metadata keys, section headings, IDs and statuses are in English | Pass | All keys, headings and statuses are the framework's English ones |
| 7 | No translated twin (<name>.<language>.md) exists beside the document |
Pass | The docs/ listing has no twin file |
| 8 | A change of language or domain since the previous accepted version has a Version History row and was reviewed again | N-A | No earlier accepted version exists and the language has been en since the first row |
| 9 | A reviewer competent in the domain, and in the language, has confirmed that the domain terms are used correctly | Pass | Confirmed by S01 (a person) in chat, 2026-11-06. S01 reads English and knows software and IT; the IT domain terms are used correctly |
| 10 | Abbreviations are spelled out on first use, in the stated language | Pass | Round 1: API and ADR were not expanded; expanded on first use in the Go criteria and the task |
Overall Verdict
Go. No Fail on QC-MIL-001 in round 2. Round 1 found one defect (criterion 2: deliverable ADR-0001 without a Go criterion; plus thin traceability for criterion 4) and QC-LANG-001 criterion 10 (API and ADR unexpanded), all fixed. ADR-0001 is a task of this milestone; it is now written and accepted (RC-006). Criteria 3, 5 and 9 of QC-LANG-001 were Pending and are now Pass: S01 (a person) confirmed the English wording and the IT domain terms in chat on 2026-11-06. All Mandatory rows pass, so the verdict is Go and the Version History row of the document is Accepted. The review remains Mode: autonomous, not independent for the rest. Finding: no governance document defines escalation; S01 is owner and reviewer.
Action Items
| Action | Owner | Due |
|---|---|---|
| Confirm criteria 3, 5 and 9 of QC-LANG-001 as a person (Closed: confirmed by S01 in chat, 2026-11-06; criteria set to Pass, verdict Go, document row Accepted) | S01 | 2026-11-06 |