Files
Tirsvad fa6cc8ba18
TirSystem/git-workflows: OpenGrep / opengrep (push) Skipped
TirSystem/git-workflows: Sync GitHub mirror metadata / sync-metadata (push) Skipped
TirSystem/git-workflows: Publish accepted milestones / publish (push) Skipped
TirSystem/git-workflows: Validate / validate (push) Skipped
TirSystem/git-workflows: Release / release (pull_request) Successful in 17s
TirSystem/git-workflows: Validate / validate (pull_request) Successful in 32s
TirSystem/git-workflows: Publish wiki / publish-wiki (push) Skipped
TirSystem/git-workflows: OpenGrep / opengrep (pull_request) Successful in 4m16s
Resolve pending commit links
2026-11-06 12:37:51 +08:00

4.6 KiB

Project Plan

Metadata

Key Value
ID PP-001
CrossReference BC-001, SA-001, MIL-001, MIL-002, MIL-003
Language en
Domain it

Version History

Date Status Author Reviewer Change Commit
2026-11-06 Deprecated Jens Tirsvad Nielsen S01 Initial version a07d05b
2026-11-06 Accepted Jens Tirsvad Nielsen S01 Informal review against QC-PP-001 fixed 7 defects (constants.py gateway, No-Go rule, sources, risk trace, stories, sync mark); accepted by S01 as Product Owner through the accepted plan in chat on 2026-11-06 a07d05b

Purpose

This plan schedules three gateways that take the lecture-054 exercise from an empty repository to a tested, documented solution with a three-language wiki, within the Business Case constraint of finishing by 2026-11-09.

Planning Assumptions

  • The plan starts 2026-11-06 and ends by 2026-11-09 (source: BC-001 Constraints, target 2026-11-09).
  • Phase length: one working session per gateway (source: the author, from the scope of BC-001).
  • One branch and one pull request per gateway, so that the steps stay traceable.
  • Stakeholder S01 owns and reviews every gateway (SA-001).

Gateway Schedule

Gateway Document Window Decision date Owner Stories Main deliverable Milestone
Project baseline and repository MIL-001 2026-11-06 2026-11-06 S01 none (technical tasks, see ADR-0001) Project configuration, README, Doxyfile, ADR-0001, repository metadata not yet synced
Speed calc decorator MIL-002 2026-11-06 to 2026-11-07 2026-11-07 S01 none (technical tasks, see ADR-0001) Working package, tests, one screenshot per lecture step not yet synced
Wiki in three languages MIL-003 2026-11-07 to 2026-11-09 2026-11-09 S01 none (technical tasks, see ADR-0001) Wiki pages in en, da, ms explaining each lecture step not yet synced
@startgantt
Project starts 2026-11-06
[Project baseline] starts 2026-11-06 and ends 2026-11-06
[Project baseline Go/No-Go] happens 2026-11-06
[Speed calc decorator] starts 2026-11-06 and ends 2026-11-07
[Speed calc decorator Go/No-Go] happens 2026-11-07
[Wiki] starts 2026-11-07 and ends 2026-11-09
[Wiki Go/No-Go] happens 2026-11-09
@endgantt

Scope Coverage

Business Case scope item Gateway
pyproject.toml, .gitignore, Doxyfile MIL-001
constants.py MIL-002
README with venv and test instructions MIL-001, updated in MIL-002
Repository description and topics MIL-001
Python package under src/, tests under tests/ MIL-002
One screenshot per lecture step MIL-002
Wiki in en, da, ms MIL-003

Dependencies

MIL-001 → MIL-002 → MIL-003

A No-Go stops the later gateways; their dates move by the same number of days. S01, as Product Owner, decides whether the end date of 2026-11-09 moves; a move beyond it changes the constraint in BC-001 and needs a new version of it.

Plan Risks

Risk Impact Mitigation
The wiki is not enabled on the git host (assumption of BC-001) MIL-003 cannot be published Task checks the setting early; stop and report if disabled
Screenshots need a rendering tool (relates to the screenshot risk of BC-001) Delay in MIL-002 Render from captured output with a dev-only tool, no host desktop
Timing tests are flaky (risk of BC-001) False failures in MIL-002 Tests inject a fake clock; checked by Go criterion 1 of MIL-002
The token in .env leaks (risk of BC-001) Account compromise during MIL-001 .env is git-ignored; checked by Go criterion 2 of MIL-001

Open Issues

  • The request names the repository Tirsvad-Udemy-100_days_of_code, but origin is Tirsvad-Udemy-100-days-of-code/054-speed-calc-decorator. The plan uses origin.
  • User stories and use cases are skipped: the exercise is one function with no user interaction. The reason is recorded in ADR-0001 (task in MIL-001).
  • Under autonomous mode the reviews of S01's documents are performed by the AI as stand-in for S01 and are recorded as not independent.