The game updates the price and owned text at once but the affordable flag only at its next redraw, so a second purchase in the same visit used a stale flag. Buying at most one product per visit cut the failed purchases from about 40 percent to 1 of 49 and raised the CPS from 16.6 to 29 in the 300 second Docker run. README, screenshots and the wiki in en, da and ms show the new result. Task: MIL-006#1 Task: MIL-006#2 Task: MIL-006#3 Task: MIL-006#4 Task: MIL-006#5
67 lines
3.8 KiB
Markdown
67 lines
3.8 KiB
Markdown
# SQA Review Record
|
|
|
|
## Metadata
|
|
| Key | Value |
|
|
| --- | --- |
|
|
| ID | RC-014 |
|
|
| CrossReference | [MIL-006], [QC-MIL-001] |
|
|
|
|
## Version History
|
|
| Date | Status | Author | Reviewer | Change | Commit |
|
|
| --- | --- | --- | --- | --- | --- |
|
|
| 2026-10-28 | Accepted | Jens Tirsvad Nielsen | AI as stand-in for S01 | Initial version | [638730d] |
|
|
|
|
---
|
|
|
|
## Artifact Under Review
|
|
|
|
- Instance reviewed: [MIL-006]
|
|
- Checklist used: [QC-MIL-001]
|
|
- Scope: full review
|
|
- Language and domain: en / it (the artifact's Metadata rows)
|
|
- Language reviewer: S01 (confirmed criteria 3, 5 and 9 of QC-LANG-001 in chat on 2026-10-28)
|
|
- Mode: autonomous, not independent (the reviewer is `AI as stand-in for S01`)
|
|
|
|
## Checklist Results
|
|
|
|
| # | Criterion | Status | Evidence/Notes |
|
|
| --- | --- | --- | --- |
|
|
| 1 | A concrete deliverable is defined for every gate | Pass | Deliverable names the changed functions, a Docker run with CPS and log, and the updated README and wiki. |
|
|
| 2 | Explicit Go/No-Go criteria are stated for each gate | Pass | Five checkable Go criteria (failure rate below 5 percent, CPS above 16.6, checks green, review Go, same result in all docs). |
|
|
| 3 | Dependencies on other milestones are explicitly mapped | Pass | Depends on MIL-005. |
|
|
| 4 | Each milestone is traceable to a Business Case objective or KPI | Pass | Traces to O1, O3 and O4 of the Business Case. |
|
|
| 5 | Milestone owner and approving reviewer are identified | Pass | S01 owner and approving reviewer. |
|
|
| 6 | Milestone has a defined target date consistent with project constraints | Pass | Target 2026-11-03 is inside the window and equals the Project Plan decision date. |
|
|
|
|
## Language and Domain Results
|
|
|
|
| # | Criterion | Status | Evidence/Notes |
|
|
| --- | --- | --- | --- |
|
|
| 1 | The Metadata table has a `Language` row and a `Domain` row, and neither is a placeholder | Pass | Metadata has Language en and Domain it. |
|
|
| 2 | `Language` is a BCP 47 code and `Domain` is a value from the registry's domain list | Pass | en is a BCP 47 code and it is in the registry domain list. |
|
|
| 3 | The content (prose and table cells) is written in the stated language | Pass | Confirmed by S01 in chat on 2026-10-28 (named human reviewer). Content is English. |
|
|
| 4 | The register matches the one the registry gives for the artifact type | Pass | Register: IT Executive English. |
|
|
| 5 | Domain terms are the PO terms of the domain's dictionary, with no synonyms | Pass | Confirmed by S01 in chat on 2026-10-28 (named human reviewer). Ordinary IT terms; no dictionary exists or is needed. |
|
|
| 6 | Metadata keys, section headings, IDs and statuses are in English | Pass | Headings, keys, IDs and statuses are English. |
|
|
| 7 | No translated twin (`<name>.<language>.md`) exists beside the document | Pass | No translated twin exists. |
|
|
| 8 | A change of language or domain since the previous accepted version has a Version History row and was reviewed again | N-A | No change of language or domain. |
|
|
| 9 | A reviewer competent in the domain, and in the language, has confirmed that the domain terms are used correctly | Pass | Confirmed by S01 in chat on 2026-10-28 (named human reviewer). S01 is competent in English and in IT. |
|
|
| 10 | Abbreviations are spelled out on first use, in the stated language | Pass | Abbreviations are spelled out at first use. |
|
|
|
|
## Overall Verdict
|
|
|
|
Go - All Mandatory criteria pass; the language criteria were confirmed by S01. Stand-in review, not independent.
|
|
|
|
## Action Items
|
|
|
|
| Action | Owner | Due |
|
|
| --- | --- | --- |
|
|
| None | S01 | - |
|
|
|
|
---
|
|
|
|
[MIL-006]: ../../milestones/mil-006-purchase-strategy.md
|
|
[QC-MIL-001]: ../../../framework/qc/artifacts/qc-milestones-gateways.md
|
|
[QC-LANG-001]: ../../../framework/qc/artifacts/qc-language-domain.md
|
|
[638730d]: https://git.tirsystem.com/Tirsvad-Udemy-100-days-of-code/048-the-coockie-factory/commit/638730d95ba24ba77c6448730d7999aa3e90d863
|