Files
048-the-coockie-factory/docs/sqa/reviews/rc-014-mil-006-purchase-strategy.md
Tirsvad 375cc0b5f3 Buy one product per store visit and upgrades, visit the store every second
The game updates the price and owned text at once but the affordable
flag only at its next redraw, so a second purchase in the same visit
used a stale flag. Buying at most one product per visit cut the failed
purchases from about 40 percent to 1 of 49 and raised the CPS from 16.6
to 29 in the 300 second Docker run. README, screenshots and the wiki in
en, da and ms show the new result.

Task: MIL-006#1
Task: MIL-006#2
Task: MIL-006#3
Task: MIL-006#4
Task: MIL-006#5
2026-10-28 17:30:09 +08:00

3.8 KiB

SQA Review Record

Metadata

Key Value
ID RC-014
CrossReference MIL-006, QC-MIL-001

Version History

Date Status Author Reviewer Change Commit
2026-10-28 Accepted Jens Tirsvad Nielsen AI as stand-in for S01 Initial version 638730d

Artifact Under Review

  • Instance reviewed: MIL-006
  • Checklist used: QC-MIL-001
  • Scope: full review
  • Language and domain: en / it (the artifact's Metadata rows)
  • Language reviewer: S01 (confirmed criteria 3, 5 and 9 of QC-LANG-001 in chat on 2026-10-28)
  • Mode: autonomous, not independent (the reviewer is AI as stand-in for S01)

Checklist Results

# Criterion Status Evidence/Notes
1 A concrete deliverable is defined for every gate Pass Deliverable names the changed functions, a Docker run with CPS and log, and the updated README and wiki.
2 Explicit Go/No-Go criteria are stated for each gate Pass Five checkable Go criteria (failure rate below 5 percent, CPS above 16.6, checks green, review Go, same result in all docs).
3 Dependencies on other milestones are explicitly mapped Pass Depends on MIL-005.
4 Each milestone is traceable to a Business Case objective or KPI Pass Traces to O1, O3 and O4 of the Business Case.
5 Milestone owner and approving reviewer are identified Pass S01 owner and approving reviewer.
6 Milestone has a defined target date consistent with project constraints Pass Target 2026-11-03 is inside the window and equals the Project Plan decision date.

Language and Domain Results

# Criterion Status Evidence/Notes
1 The Metadata table has a Language row and a Domain row, and neither is a placeholder Pass Metadata has Language en and Domain it.
2 Language is a BCP 47 code and Domain is a value from the registry's domain list Pass en is a BCP 47 code and it is in the registry domain list.
3 The content (prose and table cells) is written in the stated language Pass Confirmed by S01 in chat on 2026-10-28 (named human reviewer). Content is English.
4 The register matches the one the registry gives for the artifact type Pass Register: IT Executive English.
5 Domain terms are the PO terms of the domain's dictionary, with no synonyms Pass Confirmed by S01 in chat on 2026-10-28 (named human reviewer). Ordinary IT terms; no dictionary exists or is needed.
6 Metadata keys, section headings, IDs and statuses are in English Pass Headings, keys, IDs and statuses are English.
7 No translated twin (<name>.<language>.md) exists beside the document Pass No translated twin exists.
8 A change of language or domain since the previous accepted version has a Version History row and was reviewed again N-A No change of language or domain.
9 A reviewer competent in the domain, and in the language, has confirmed that the domain terms are used correctly Pass Confirmed by S01 in chat on 2026-10-28 (named human reviewer). S01 is competent in English and in IT.
10 Abbreviations are spelled out on first use, in the stated language Pass Abbreviations are spelled out at first use.

Overall Verdict

Go - All Mandatory criteria pass; the language criteria were confirmed by S01. Stand-in review, not independent.

Action Items

Action Owner Due
None S01 -