Traceability Matrix
Metadata
| Key |
Value |
| ID |
TM-001 |
| CrossReference |
BC-001 |
Version History
| Date |
Status |
Author |
Reviewer |
Change |
Commit |
| 2026-10-28 |
Accepted |
Jens Tirsvad Nielsen |
AI as stand-in for S02 |
Initial version: baseline artifacts |
cadc5ef |
Purpose
Tracks backward/forward links between artifact instances so that the Business Case's
cross-artifact traceability success criterion is measurable. A row is added or
updated whenever an artifact instance is created or reviewed.
Purpose
Tracks backward and forward links between artifact instances so that the Business Case's traceability can be read in one place. A row is added or updated whenever an artifact is created or reviewed. Rows for code and tests are added by the milestones that create them.
Traceability Table
| Artifact Instance |
Type |
Language |
Domain |
Upstream (Backward Link) |
Downstream (Forward Link) |
Last Reviewed (RC-ID) |
| BC-001 |
Business Case |
en |
it |
- |
SA-001, PP-001 |
RC-001 |
| SA-001 |
Stakeholder Analysis |
en |
it |
BC-001 |
PP-001 |
RC-002 |
| PP-001 |
Project Plan |
en |
it |
BC-001, SA-001 |
MIL-001 to MIL-007 |
- (accepted by S01 in chat; no checklist) |
| DICT-001 |
Domain Dictionary |
en |
it |
BC-001, SA-001 |
- |
RC-003 |
| ADR-0001 |
ADR |
- |
- |
BC-001 |
PP-001 |
RC-004 |
| ADR-0002 |
ADR |
- |
- |
BC-001, SA-001 |
code in MIL-002 onward |
RC-005 |
| ADR-0003 |
ADR |
- |
- |
BC-001 |
MIL-002, MIL-003 |
RC-006 |
| MIL-001 |
Milestone |
en |
it |
BC-001, PP-001 |
MIL-002 |
RC-007 |
| MIL-002 |
Milestone |
en |
it |
BC-001, PP-001 |
MIL-003 |
RC-008 |
| MIL-003 |
Milestone |
en |
it |
BC-001, PP-001 |
MIL-004 |
RC-009 |
| MIL-004 |
Milestone |
en |
it |
BC-001, PP-001 |
MIL-005 |
RC-010 |
| MIL-005 |
Milestone |
en |
it |
BC-001, PP-001 |
MIL-006 |
RC-011 |
| MIL-006 |
Milestone |
en |
it |
BC-001, PP-001 |
MIL-007 |
RC-012 |
| MIL-007 |
Milestone |
en |
it |
BC-001, PP-001 |
- |
RC-013 |
Concern Coverage
Open Inconsistencies
| # |
Views |
Inconsistency |
Found in (RC-ID) |
Status |
Resolved in |
| - |
- |
None found |
- |
Closed |
- |
Coverage Notes
- No test plan (
TP), architecture description (AD) or design artifacts exist: ADR-0001 skips stories and use cases, and the code is small. Quality checks in Concern Coverage name the check used instead.
- in Upstream means foundational, in Downstream that nothing is built on it yet, and in Last Reviewed that no RC-* exists.
- Status
Planned means a milestone will answer the concern; it is not a gap.