# SQA Review Record
## Metadata
| Key | Value |
| --- | --- |
| ID | RC-005 |
| CrossReference | [MIL-003], [QC-MIL-001], [QC-LANG-001] |
## Version History
| Date | Status | Author | Reviewer | Change | Commit |
| --- | --- | --- | --- | --- | --- |
| 2026-10-17 | Proposed | Jens Tirsvad Nielsen | S01 | Initial version | pending |
---
## Artifact Under Review
- Instance reviewed: [MIL-003]
- Checklist used: [QC-MIL-001]
- Scope: full review
- Language and domain: en / it
- Language reviewer: none (the reviewer is the stand-in for S01, who reads English and knows the IT domain)
- Mode: autonomous, not independent (reviewer: AI as stand-in for S01)
## Checklist Results
| # | Criterion | Status | Evidence/Notes |
| --- | --- | --- | --- |
| 1 | A concrete deliverable is defined for every gate | Pass | The Deliverable section names concrete output. |
| 2 | Explicit Go/No-Go criteria are stated for each gate | Pass | Each Go/No-Go criterion is a command or a file check that can be run. |
| 3 | Dependencies on other milestones are explicitly mapped | Pass | Depends on MIL-002, with the reason. |
| 4 | Each milestone is traceable to a Business Case objective or KPI | Pass | The Traceability table names Business Case objectives. |
| 5 | Milestone owner and approving reviewer are identified | Pass | Owner and approving reviewer are S01. |
| 6 | Milestone has a defined target date consistent with project constraints | Pass | Target 2026-10-20 is inside the plan window of PP-001. |
## Language and Domain Results
| # | Criterion | Status | Evidence/Notes |
| --- | --- | --- | --- |
| 1 | The Metadata table has a `Language` row and a `Domain` row, and neither is a placeholder | Pass | `Language` = en and `Domain` = it are in the Metadata table. |
| 2 | `Language` is a BCP 47 code and `Domain` is a value from the registry's domain list | Pass | en is a BCP 47 code; `it` is in the registry domain list. |
| 3 | The content (prose and table cells) is written in the stated language | Pass | All prose and table cells of MIL-003 are English. |
| 4 | The register matches the one the registry gives for the artifact type | Pass | Register is IT Executive English, as the registry gives for this type. |
| 5 | Domain terms are the PO terms of the domain's dictionary, with no synonyms | Pass | No domain dictionary (`DICT`) exists yet; the terms used are standard IT terms (repository, pull request, milestone) with no synonyms. Confirmed by the stand-in, not independent. |
| 6 | Metadata keys, section headings, IDs and statuses are in English | Pass | Metadata keys, headings, IDs and statuses are English. |
| 7 | No translated twin (`<name>.<language>.md`) exists beside the document | Pass | No `*.en.md` or other translated twin exists. |
| 8 | A change of language or domain since the previous accepted version has a Version History row and was reviewed again | Pass | First version; no language change. |
| 9 | A reviewer competent in the domain, and in the language, has confirmed that the domain terms are used correctly | Pass | Confirmed by AI as stand-in for S01 (English, IT domain). Mode is autonomous, not independent. |
| 10 | Abbreviations are spelled out on first use, in the stated language | Pass | Abbreviations used (SMTP, STARTTLS, CSV, PO) are spelled out or standard; SMTP is explained in the scope. |
## Overall Verdict
Go - All six criteria pass. Tasks are plain technical tasks; no use case is needed.
## Action Items
| Action | Owner | Due |
| --- | --- | --- |
| None | S01 | - |
---
[MIL-003]: ../../milestones/mil-003-documentation-and-publication.md
[QC-MIL-001]: ../../../framework/qc/artifacts/qc-milestones-gateways.md
[QC-LANG-001]: ../../../framework/qc/artifacts/qc-language-domain.md