Stakeholder Analysis: Flash Card
Metadata
| Key |
Value |
| ID |
SA-001 |
| CrossReference |
BC-001 |
| Language |
en |
| Domain |
it |
Version History
| Date |
Status |
Author |
Reviewer |
Change |
Commit |
| 2026-10-14 |
Accepted |
Jens Tirsvad Nielsen |
AI as stand-in for S01 |
Initial version |
pending |
Purpose
This analysis names the people who influence the flash card project or are affected by it, so that owners, reviewers and readers can be cited by a stable ID in every other document. It follows the power and interest grid: each stakeholder is placed in one quadrant, and the quadrant sets how closely the project engages that stakeholder.
Stakeholder Summary Table
| ID |
Name |
Role/Title |
Organization |
Power Level |
Interest Level |
Quadrant |
Primary Concern (Business Language) |
| S01 |
Jens Tirsvad Nielsen, course participant |
Product Owner, developer and reviewer |
Self (Tirsvad) |
HIGH |
HIGH |
Manage Closely |
Finish the assignment with a working, understood and documented solution |
| S02 |
Udemy coursists |
Fellow participants of the 100 Days of Code course |
Udemy course community |
LOW |
HIGH |
Keep Informed |
Readable, runnable code that keeps the assignment's function names, and instructions to run it, so that solutions can be shared and compared |
| S03 |
GitHub viewers |
Visitors who browse the repository for ideas |
Public |
LOW |
LOW |
Monitor |
A clear repository description, topics and README, and no runtime dependencies to install |
Power/Interest Classification Rationale
- Manage Closely (S01): S01 decides scope, writes the code and accepts the result, so both power and interest are high. S01 is the only stakeholder who can accept or reject a milestone.
- Keep Informed (S02): S02 cannot change the project, so power is low. They share code and compare solutions, so interest is high; the project informs them through a README that explains how to run the program and tests, and through function names they recognise from the assignment.
- Monitor (S03): S03 arrive occasionally and have no stake beyond finding the repository useful, so power and interest are both low. The project serves them with a repository description, topics and a README, and does not require them to install runtime dependencies.
S02 and S03 are classified by S01 as Product Owner; neither can be interviewed, so the classification is an assumption recorded in BC-001.
Primary Concerns and FURPS+ Mapping
| ID |
Concern |
FURPS+ attribute |
| S01 |
The four assignment steps work and progress is saved |
Functionality |
| S01 |
Work is tracked step by step, each step reviewed |
Supportability (+ Process) |
| S01 |
Malay words are spoken, in Danish translation |
Functionality |
| S02 |
Code is readable and runnable with the assignment's function names |
Usability, Supportability |
| S02 |
Instructions to run the program and its tests |
Usability |
| S03 |
Repository description, topics and README are clear |
Usability |
| S03 |
No runtime dependencies to install |
Supportability (+ Implementation) |
Communication Requirements
| ID |
Channel |
Frequency |
Deliverable |
Phase / Milestone |
| S01 |
Chat session and pull request review |
Once per milestone |
Pull request with the milestone's changes and review record |
MIL-001 to MIL-007 |
| S02 |
README and wiki |
Once, at the documentation milestone, then on change |
Run and test instructions, assignment function names |
MIL-007 |
| S03 |
Repository description, topics, README and wiki |
Once, at the documentation milestone |
Description, topics, README, screenshots |
MIL-007 |
Conflicting Interests and Mitigations
| Conflict |
Stakeholders |
Mitigation |
S01 wants spoken Malay words (needs gTTS and playsound), S03 wants no runtime dependencies |
S01, S03 |
Speech is an optional extra (pip install .[speech]) behind a port; the core program uses the standard library only |
| S01 wants clean architecture with layers, S02 wants code that is simple to read and compare with the assignment |
S01, S02 |
The assignment's function names (next_card, flip_card, is_known) are kept at the presentation layer, and the wiki maps each assignment step to the files that implement it |
Traceability Analysis
Business Goal Alignment
| Stakeholder |
Concern |
Business Case objective |
| S01 |
Four assignment steps work, progress is saved |
Objective 1 of BC-001 |
| S01 |
Spoken Malay word, Danish translation |
Objective 2 of BC-001 |
| S01 |
Step-by-step tracking |
Objective 5 of BC-001 |
| S02 |
Readable, runnable code with assignment function names |
Objectives 1 and 4 of BC-001 |
| S03 |
Description, topics, README, no runtime dependencies |
Objectives 3 and 4 of BC-001 |
Sign-Off
Proposed by the author. Accepted when RC-* for SA-001 has the verdict Go; in autonomous mode by the AI as stand-in for S01, and open to challenge by S01 in the end-of-run summary.