Files
030-password-manager/docs/project-plan.md
T
2026-10-14 21:21:46 +08:00

4.7 KiB

Password Manager Project Plan

Metadata

Key Value
ID PP-001
CrossReference BC-001, SA-001, MIL-001, MIL-002, MIL-003
Language en
Domain it

Version History

Date Status Author Reviewer Change Commit
2026-10-14 Accepted Jens Tirsvad Nielsen S01 Initial version 53f56ee

Password Manager Project Plan

Purpose

Schedule the three gateways that take the password manager from an empty repository to a published, tested and documented project. The Business Case sets no deadline, so the plan keeps the phases short and sequential.

Planning Assumptions

  • Work starts 2026-10-14 and the plan ends 2026-10-19.
  • Each phase is one branch and one pull request, and its tasks are Issues.
  • S01 reviews every artifact; in autonomous mode the AI acts as stand-in for S01 and the review records say so (SA-001).
  • Product Owner language is English (domain it); the wiki exists in English, Danish and Bahasa Malaysia as the Business Case requires (BC-001).
  • The application is a user interface, so the presentation pattern is MVVM. The wireframe is the course's layout: logo on top, then Website with a Search button, Email/Username, Password with a Generate button, and a wide Add button.

Gateway Schedule

Gateway Document Window Decision date Owner Stories Main deliverable Milestone
Project Foundation MIL-001 2026-10-14 to 2026-10-15 2026-10-15 S01 none pyproject.toml, .gitignore, constants.py, Doxyfile, README, repository description and topics Milestone 162
Password Manager Features MIL-002 2026-10-15 to 2026-10-17 2026-10-17 S01 none JSON storage, exception handling, search, generator, window and tests Milestone 163
Documentation and Publishing MIL-003 2026-10-17 to 2026-10-19 2026-10-19 S01 none Screenshots, README with screenshots, wiki in en, da and ms Milestone 164
@startgantt
Project starts 2026-10-14
[Project Foundation] starts 2026-10-14 and ends 2026-10-15
[Foundation Go/No-Go] happens 2026-10-15
[Password Manager Features] starts 2026-10-15 and ends 2026-10-17
[Features Go/No-Go] happens 2026-10-17
[Documentation and Publishing] starts 2026-10-17 and ends 2026-10-19
[Publishing Go/No-Go] happens 2026-10-19
@endgantt

Scope Coverage

Business Case scope item Gateway
Password generation, saving to JSON, searching by website MIL-002
Exception handling for a missing, empty or invalid data file MIL-002
A Tkinter window with the assignment's fields and buttons MIL-002
pyproject.toml, pytest tests, constants.py, .gitignore, Doxyfile, Doxygen comments MIL-001 and MIL-002
README MIL-001, completed with screenshots in MIL-003
Wiki in English, Danish and Bahasa Malaysia, screenshots MIL-003
Repository description and topics MIL-001
Local .venv and pip upgrade instructions MIL-001

Dependencies

MIL-001 -> MIL-002 -> MIL-003

A No-Go on a gateway holds every later gateway; the later dates move by the rework time.

Plan Risks

Risk Impact Mitigation
The git host token cannot edit repository metadata or merge Description, topics or merge steps fail Stop and report as autonomous mode requires; the user performs the step
Screenshots cannot be captured in the session README and wiki lack images Capture the window with a documented script; if impossible, stop and report
The wiki publish workflow has no runner Wiki does not reach the host The pages stay in docs/wiki/; report and let the user decide how to publish

Open Issues

  • No use cases or user stories are modelled: the tasks are technical steps of the course assignment, so every task is a plain task.
  • The Domain Dictionary (DICT) is created with the first milestone review so that the language checklist can be applied.