4.6 KiB
4.6 KiB
SQA Review Record
Metadata
| Key | Value |
|---|---|
| ID | RC-001 |
| CrossReference | BC-001, QC-BC-001 |
Version History
| Date | Status | Author | Reviewer | Change | Commit |
|---|---|---|---|---|---|
| 2026-10-13 | Proposed | Claude (AI) for S01 | AI as stand-in for S01 | Initial review record: Go | pending |
Artifact Under Review
- Instance reviewed: BC-001
- Checklist used: QC-BC-001 and QC-LANG-001
- Scope: full review
- Language and domain: en / it
- Language reviewer: none (the reviewer reads English and knows the domain, as stand-in for S01)
- Mode: autonomous, not independent (the reviewer is
AI as stand-in for S01; the author is the same AI)
Checklist Results
| # | Criterion | Status | Evidence/Notes |
|---|---|---|---|
| 1 | ROI/Cost-Benefit analysis is quantitative, or where qualitative, is explicitly justified | Pass | Cost-Benefit table is qualitative and says why: the project is an exercise with no licence or hosting cost. |
| 2 | Risks are identified with documented impact and mitigation | Pass | Risks table: five risks, each with impact and mitigation. |
| 3 | Success criteria are measurable, stating explicit targets rather than vague aspirations | Pass | Six criteria with target and measure (pytest exit code 0, check-readme.sh passes, at least 5 topics). |
| 4 | Scope explicitly separates In Scope vs Out of Scope | Pass | ### In Scope and ### Out of Scope subsections. |
| 5 | Stakeholders are cross-referenced to Stakeholder Analysis IDs rather than re-described inline | Pass | Stakeholders table cites S01, S02, S03 and [SA-001]. |
| 6 | Methodology and quality-standard foundation are stated explicitly (e.g. ISO/IEC 25010, Larman) | Pass | Section names the framework, ISO/IEC 25010:2023 and the coding conventions. |
| 7 | Assumptions and constraints are explicit and clearly distinguished from one another | Pass | Separate Assumptions and Constraints sections. |
| 8 | Document supports executive decision-making with a clear, unambiguous recommendation | Pass | Recommendation: Proceed, with rationale. |
Language and Domain Results
| # | Criterion | Status | Evidence/Notes |
|---|---|---|---|
| 1 | The Metadata table has a Language row and a Domain row, and neither is a placeholder |
Pass | Language = en, Domain = it in Metadata. |
| 2 | Language is a BCP 47 code and Domain is a value from the registry's domain list |
Pass | en; it is in the registry's domain table. |
| 3 | The content (prose and table cells) is written in the stated language | Pass | All prose and cells are English. Checked by the stand-in for S01, who reads English. |
| 4 | The register matches the one the registry gives for the artifact type | Pass | IT Executive English: plain objective-level prose with no implementation detail beyond what the scope needs. |
| 5 | Domain terms are the PO terms of the domain's dictionary, with no synonyms | Pass | No DICT exists for domain it and none is in the plan; the document uses standard Python and software terms consistently (for example states_to_learn.csv, missing_states, Doxygen). Recorded as a stand-in decision. |
| 6 | Metadata keys, section headings, IDs and statuses are in English | Pass | All structural vocabulary is English. |
| 7 | No translated twin (<name>.<language>.md) exists beside the document |
Pass | check-languages.sh reports no twin. |
| 8 | A change of language or domain since the previous accepted version has a Version History row and was reviewed again | Pass | First version; no earlier accepted version. |
| 9 | A reviewer competent in the domain, and in the language, has confirmed that the domain terms are used correctly | Pass | The reviewer, AI as stand-in for S01, reads English and the software domain; no second language reviewer is named. S01 is the Product Owner and reads both; a person may challenge this in the run summary. |
| 10 | Abbreviations are spelled out on first use, in the stated language | Pass | Continuous integration (CI), Architecture Decision Record (ADR) and comma-separated values (CSV) are spelled out where first used in prose; file names and tool names are not abbreviations. |
Overall Verdict
Go - The Business Case is complete against its checklist. Every Mandatory criterion of both checklists passes.
Action Items
| Action | Owner | Due |
|---|---|---|
| None | S01 |