Files
024-snake/docs/sqa/reviews/rc-017-mil-006.md
T
Tirsvad ec1ffa4ad7
CI / checks (push) Successful in 45s
CI / checks (pull_request) Successful in 46s
Resolve pending commit links
2026-10-13 14:56:42 +08:00

68 lines
4.7 KiB
Markdown

# RC-017: Review of MIL-006 (screenshot)
## Metadata
| Key | Value |
| --- | --- |
| ID | RC-017 |
| CrossReference | [MIL-006], [QC-MIL-001], [QC-LANG-001], [DICT-001] |
## Version History
| Date | Status | Author | Reviewer | Change | Commit |
| --- | --- | --- | --- | --- | --- |
| 2026-10-13 | Proposed | Jens Tirsvad Nielsen | AI as stand-in for S01 | Initial version | [988ebba] |
---
## Artifact Under Review
- Instance reviewed: [MIL-006]
- Checklist used: [QC-MIL-001] and, for the language and domain, [QC-LANG-001]
- Scope: full review. First review of the milestone.
- Language and domain: en / it
- Language reviewer: none (the reviewer reads English and knows the IT domain)
- Mode: autonomous, not independent (the reviewer is `AI as stand-in for S01`; the assistant also drafted the change)
## Checklist Results
| # | Criterion | Status | Evidence/Notes |
| --- | --- | --- | --- |
| 1 | A concrete deliverable is defined for every gate | Pass | Deliverable section names the file, the README picture and the three wiki pictures; 4 tasks are rows in `## Tasks`. |
| 2 | Explicit Go/No-Go criteria are stated for each gate | Pass | Go / No-Go table has 9 criteria, each with an observable Go and No-Go (PNG signature and size, text in the picture, links, HTTP 200, changed files). |
| 3 | Dependencies on other milestones are explicitly mapped | Pass | Dependencies table names [MIL-005] accepted and merged. |
| 4 | Each milestone is traceable to a Business Case objective or KPI | Pass | Traceability table cites [BC-001] objectives 13, 12 and 9 and the Success Criteria numbers. |
| 5 | Milestone owner and approving reviewer are identified | Pass | Ownership table: Owner S01, Approving reviewer S01. |
| 6 | Milestone has a defined target date consistent with project constraints | Pass | Target Date 2026-10-25 is inside the plan window of [PP-001] and the Business Case constraint. |
## Language and Domain Results
| # | Criterion | Status | Evidence/Notes |
| --- | --- | --- | --- |
| 1 | The Metadata table has a `Language` row and a `Domain` row, and neither is a placeholder | Pass | `Language` is `en` and `Domain` is `it` in Metadata. |
| 2 | `Language` is a BCP 47 code and `Domain` is a value from the registry's domain list | Pass | `en` is a BCP 47 code; `it` is in the registry's domain list. |
| 3 | The content (prose and table cells) is written in the stated language | Pass | All prose and table cells of MIL-006, including the new and changed text and the new Version History row, are English. |
| 4 | The register matches the one the registry gives for the artifact type | Pass | Register is the one the registry gives for the type. |
| 5 | Domain terms are the PO terms of the domain's dictionary, with no synonyms | Pass | Terms are those of [DICT-001], including the new row `screenshot`, which is the word of S01's request and names the one file `docs/images/snake-score-5.png`. |
| 6 | Metadata keys, section headings, IDs and statuses are in English | Pass | Metadata keys, headings, IDs and statuses are English. |
| 7 | No translated twin (`<name>.<language>.md`) exists beside the document | Pass | `docs/` holds one file per artifact; there is no `<name>.<language>.md`. |
| 8 | A change of language or domain since the previous accepted version has a Version History row and was reviewed again | N-A | Language and domain are unchanged since the previous accepted version. |
| 9 | A reviewer competent in the domain, and in the language, has confirmed that the domain terms are used correctly | Pass | The assistant, as stand-in for S01, reads English and knows the IT domain and checked the terms against [DICT-001]. |
| 10 | Abbreviations are spelled out on first use, in the stated language | Pass | No new abbreviation is introduced; PNG and HTTP are standard names. |
## Overall Verdict
Go — all Mandatory criteria pass or are not applicable. Assessed on 2026-10-13 by the assistant that drafted the change, as stand-in for S01 in autonomous mode. Mode: autonomous, not independent. S01 accepted the plan that contains this change in chat on 2026-10-13; the verdict can be challenged in the run summary or on the pull request.
## Action Items
| Action | Owner | Due |
| --- | --- | --- |
| Challenge this `Go` in the run summary or on the pull request if the stand-in decision is not wanted | S01 | 2026-10-20 |
---
[MIL-006]: ../../milestones/mil-006-screenshot.md
[QC-MIL-001]: ../../../framework/qc/artifacts/qc-milestones-gateways.md
[QC-LANG-001]: ../../../framework/qc/artifacts/qc-language-domain.md
[DICT-001]: ../../dictionary.md
[988ebba]: https://git.tirsystem.com/Tirsvad-Udemy-100-days-of-code/024-snake/commit/988ebba060c1ec69728a7fa36b24bc70737096d8