Review Record: Milestone 004

Metadata

Key Value
ID RC-006
CrossReference MIL-004, QC-MIL-001, QC-LANG-001

Version History

Date Status Author Reviewer Change Commit
2026-10-07 Proposed Jens Tirsvad Nielsen S01 Initial version 4b3391b

Artifact Under Review

  • Instance reviewed: MIL-004
  • Checklist used: QC-MIL-001 (QC-MIL-001, Milestones / Gateways), together with QC-LANG-001 because the type is written in the PO language
  • Scope: full review
  • Language and domain: en / it (the artifact's Metadata rows)
  • Language reviewer: none (not confirmed at the time of this review; S01 confirmed it in RC-013)
  • Status of this record: closed on 2026-10-07. The statuses and evidence are the assistant's assessment of the first version of the document; the criteria that failed were re-reviewed in RC-013, which ends in Go.

Checklist Results

# Criterion Status Evidence/Notes
1 A concrete deliverable is defined for every gate Pass The Deliverable section lists random_walk, draw_spirograph, their tests, the two commands and the final README.
2 Explicit Go/No-Go criteria are stated for each gate Pass Nine criteria with a Go and a No-Go condition. Checked on the finished working tree on 2026-10-07: criteria 1 to 4 and 8 hold. Criterion 5 (S01 runs both commands), 6 (all seven Business Case success criteria, of which 5 and 7 need S01's fresh-clone run), 7 (fresh clone from the README) and 9 (code review record) are not done yet.
3 Dependencies on other milestones are explicitly mapped Pass Optional. The Dependencies table names what must be accepted first.
4 Each milestone is traceable to a Business Case objective or KPI Pass Maps to O1, O3, O6 and O7 of BC-001; all four exist.
5 Milestone owner and approving reviewer are identified Pass Owner S01 and approving reviewer S01 are identified. They are the same person, which the first action item covers.
6 Milestone has a defined target date consistent with project constraints Pass 2026-10-21 equals the Business Case deadline: consistent, with no slack. The Project Plan says what a No-Go does to this date.

Language and Domain Results

# Criterion Status Evidence/Notes
1 The Metadata table has a Language row and a Domain row, and neither is a placeholder Pass Metadata has a Language row (en) and a Domain row (it); neither is a placeholder.
2 Language is a BCP 47 code and Domain is a value from the registry's domain list Pass en is a BCP 47 code; it is in the domain list of docs/artifact-registry.md.
3 The content (prose and table cells) is written in the stated language Pass All prose and table cells are English. The author wrote it in English; the reviewer confirms by reading it.
4 The register matches the one the registry gives for the artifact type Pass The registry gives this type IT Executive English. Judgement call for the reviewer: the Tasks table and the Go / No-Go criteria carry developer-level detail (function names, commands) although the registry gives milestones the executive register; the only reader is S01, who is also the developer.
5 Domain terms are the PO terms of the domain's dictionary, with no synonyms Fail No Domain Dictionary exists (docs/dictionary.md is absent), so the domain terms cannot be checked against one. N-A is not allowed for this criterion.
6 Metadata keys, section headings, IDs and statuses are in English Pass Metadata keys, section headings, IDs and statuses are English and unchanged from the template.
7 No translated twin (<name>.<language>.md) exists beside the document Pass One file per artifact: find docs -name '*.*.md' finds no translated twin.
8 A change of language or domain since the previous accepted version has a Version History row and was reviewed again N-A Initial version: there is no earlier accepted version whose language could have changed.
9 A reviewer competent in the domain, and in the language, has confirmed that the domain terms are used correctly Fail Not yet confirmed. No record shows that the reviewer reads English and knows the IT domain (there is no reviewer training record, TRR). S01 confirms on this record or names a language reviewer. N-A is not allowed for this criterion.
10 Abbreviations are spelled out on first use, in the stated language Fail Optional. Not spelled out on first use: README, RGB.

Overall Verdict

Go-with-conditions — the criteria of the type's checklist pass, and the language checklist fails criteria 5 and 9 (and 10 where listed), which the review process turns into conditions. The conditions were closed and re-reviewed in RC-013, which ends in Go and covers the whole artifact.

Action Items

Action Owner Due
Condition: accept or change the reviewer assignment. S01 is the author of this artifact and also its reviewer, which framework/process/review-checklist-process.md does not allow. Either record the deviation as accepted (this is a single-person project) or name another reviewer. S01 2026-10-09
Condition (language criterion 5): decide how the domain terms are checked: draft DICT-001 (docs/dictionary.md) with the terms the documents use and review it against QC-DICT-001, or record an accepted deviation. S01 2026-10-09
Condition (language criterion 9): confirm on this record that the reviewer reads English and knows the IT domain, or name a language reviewer. S01 2026-10-09
Optional (language criterion 10): spell out on first use: README, RGB. S01 2026-10-09