# Review Record: Business Case success criteria, re-check on main
## Metadata
| Key | Value |
| --- | --- |
| ID | RC-019 |
| CrossReference | [BC-001], [RC-018], [MIL-004] |
## Version History
| Date | Status | Author | Reviewer | Change | Commit |
| --- | --- | --- | --- | --- | --- |
| 2026-10-08 | Proposed | Jens Tirsvad Nielsen | S01 | Initial version | [03700b8] |
---
## Artifact Under Review
- Instance reviewed: the delivered project on `main` at commit 7d2c9e3 (Gitea and GitHub), against the Success Criteria of [BC-001]
- Checklist used: the seven rows of the `## Success Criteria` table of [BC-001]; no `QC-*` checklist covers this check, the table is the checklist
- Scope: all seven success criteria, as a new record that names [RC-018] and re-checks its conditions; the evidence for the gate of [MIL-004]
- Language and domain: n/a (technical record)
- Language reviewer: none (n/a)
- Method: a fresh clone of `main` from the README's own GitHub URL into an empty folder, then the README's Windows PowerShell steps, run on the author's Windows machine; the real command started from that clone; read-only calls to the Gitea and GitHub APIs for continuous integration, settings, pull requests and issues.
- Reviewer eligibility: S01 is the author and the reviewer; S01 accepted that deviation in chat on 2026-10-07 (see the traceability matrix).
- Status of this record: draft. The statuses and evidence are the assistant's, from the runs described above; they are not a decision.
## Checklist Results
| # | Criterion | Status | Evidence/Notes |
| --- | --- | --- | --- |
| 1 | Challenges are runnable. Target: 5 of 5 challenges start from the command line and draw to completion. Measure: S01 runs each on Windows PowerShell and records the result in the review of the milestone. | Pass | From a fresh clone of `main` (`7d2c9e3`), in PowerShell: (a) the real command `turtle-challenges <name>` was started five times and each time a window titled "Turtle Challenges" opened (square, dashed-line, shapes, random-walk, spirograph). (b) Each challenge was run through `cli.main` with real Tk, closing the window where the command would wait for a click, and each reached that point with exit 0: square 1.4 s, dashed-line 3.3 s, shapes 14.0 s, random-walk 9.6 s, spirograph 3.6 s (1.8 s with `--gap 10`). Not covered: the click that closes the window, and S01's own run, which the measure names. The code is unchanged since the run in [RC-018]. |
| 2 | Automated tests pass. Target: 0 failures; at least one test for every public function. Measure: `python -m pytest` exits 0 locally and in continuous integration. | Pass | In the clone of `main`: `python -m pytest` printed `95 passed`, exit 0; `ruff check .`, `ruff format --check .` and `mypy` exit 0; the steps of the current workflow as written (`python -m ruff check src tests`, `python -m ruff format --check src tests`, `python -m mypy src tests`) pass too. Every public function and class still has a test (the code is unchanged since [RC-018]). Continuous integration on `main` at `7d2c9e3`: run 252 is `success` with the steps Install, Tests, Lint, Format check and Types. History: after #35 introduced `pip install --group dev` the workflow failed (six runs, 241 to 246); #36 fixed the install step and CI has been green since (runs 247, 249 and 252). The workflow no longer builds the documentation. |
| 3 | Runtime dependencies. Target: 0. Measure: `dependencies = []` in `pyproject.toml`. | Pass | `dependencies = []` in `pyproject.toml` (read with `tomllib`), and `python -m pip show turtle-challenges` in the clone of `main` prints an empty `Requires:`. |
| 4 | Source documentation builds. Target: 0 Doxygen warnings. Measure: `doxygen Doxyfile` output. | Pass | `doxygen Doxyfile` (Doxygen 1.15.0) in the clone of `main`: exit 0, no output, `build/html/index.html` generated. Continuous integration no longer runs this build, because the current workflow has no Doxygen step, so the evidence is the local run only; the README's "Continuous integration" section still says CI builds the documentation. |
| 5 | Set-up is reproducible. Target: A fresh clone runs the challenges and the tests following only the README on Windows PowerShell. Measure: S01 follows the README from an empty folder. | Pass | Met. The README's own clone URL, `https://github.com/Tirsvad-Udemy-100-days-of-code/018-turtle.git`, now gives the project: `main` at `7d2c9e3` with 60 tracked files and 12 package files (GitHub receives `main` from Gitea). In an empty folder under PowerShell every README step worked: `git clone`, `py -3.13 -m venv .venv` (Python 3.13.14), `Activate.ps1`, `python -m pip install --upgrade pip` (26.2.1), `python -m pip install -e ".[dev]"` (exit 0), `python -m pytest` (95 passed), `ruff check .`, `ruff format --check .` and `mypy` (all exit 0), `turtle-challenges --help` (exit 0) and `doxygen Doxyfile` (0 warnings). This closes the condition on criterion 5 of [RC-018]. The measure names S01 following the README, which has not happened. |
| 6 | Repository is presented. Target: Non-empty description and at least 5 topics on each host. Measure: Repository settings page of each host. | Pass | Read from the host APIs today: Gitea and GitHub both have the description "Turtle graphics exercises from Udemy's 100 Days of Code Python bootcamp (day 18): square, dashed line, polygons, random walk and spirograph." and 11 topics each; the GitHub repository is public and its default branch is `main`. |
| 7 | Work is traceable. Target: 100 % of pull requests carry one `Closes #N` line per completed issue. Measure: Pull request descriptions. | Pass | Pull requests #30 to #33 each carry their `Closes #N` lines one per line and no comma form (#30: 1 to 6; #31: 9 to 14; #32: 16 to 21; #33: 23 to 26 and 8, 15, 22, 29). #34, #35 and #36 complete no issue and carry no `Closes` line. Only #34 says so explicitly; #35 and #36 do not, and the project-planning rule asks a pull request that finishes no issue to say so. 28 of the 29 issues are closed (#7 and #27 by hand, the others through the `Closes` lines); #28 is open. |
## Overall Verdict
Pending — a draft prepared for the reviewer (S01), who decides and replaces this line with the verdict. Proposed verdict: Go, if S01 accepts the runs in this record as the measure for criteria 1 and 5; otherwise Go-with-conditions until S01 has made those two runs.
Rationale: all seven success criteria are met on `main`. The conditions of [RC-018] stand as follows. Criterion 5 (repeat the README steps with its own clone URL) is met by the run above. The decision on how `main` reaches GitHub is settled: GitHub receives `main` and the branches from Gitea. The run of the five commands by S01 (criterion 1) is the one condition left, and only S01 can accept the assistant's run in its place. Go / No-Go criterion 6 of [MIL-004] ("every criterion met") is met once S01 decides. No date moved, so the Project Plan needs no schedule change.
## Action Items
| Action | Owner | Due |
| --- | --- | --- |
| Condition (criteria 1 and 5): accept the runs in this record as the measure, or run the five commands yourself on Windows PowerShell (click the window to close it) and follow the README from an empty folder, and record the result. | S01 | 2026-10-21 |
| After the verdict `Go`: close issue #28. | S01 | 2026-10-21 |
| The README's "Continuous integration" section and its project layout still name `.github/workflows/ci.yml` and say CI builds the documentation; the workflow is now `.gitea/workflows/ci.yml` and has no Doxygen step. Correct the README, or restore the step. | S01 | 2026-10-21 |
| Decide whether continuous integration should build the documentation again; today criterion 4 rests on a local run only. | S01 | 2026-10-21 |
| Optional: add "No issue closed: <reason>" to the descriptions of #35 and #36. | S01 | 2026-10-21 |
| Optional: the Project Plan's open issues about the continuous integration host and the GitHub mirror are answered (a runner exists, CI is green on `main`, GitHub receives `main`); updating them needs a new Version History row on `PP-001`. | S01 | 2026-10-21 |
---
[BC-001]: ../../business-case.md
[RC-018]: ./rc-018-business-case-success-criteria.md
[MIL-004]: ../../milestones/mil-004-random-walk-and-spirograph.md