Record the verdict Go on RC-019 #38

Merged
Tirsvad merged 2 commits from record-go-on-rc-019 into main 2026-10-07 19:29:56 +02:00
Owner

Record the verdict Go on RC-019

Records the verdict on RC-019, the re-check of the Business Case success criteria on main, which was merged in #37 with the verdict Pending. S01 accepted the assistant's runs as the measure for success criteria 1 and 5 and recorded Go.

What changes

  • RC-019: the verdict line reads Go, rows 1 and 5 carry S01's acceptance of the runs, the status line says the record is decided, the condition about S01's own run is closed, and Version History gets a row.
  • The traceability matrix: the success-criteria row lists RC-019 (Go) as the latest record after RC-018 (Go-with-conditions), the coverage note says so, and Version History gets a row.

No code, no other document and no workflow changes. RC-018 is left as it is: its conditions are closed by the record that names it.

What the verdict means

All seven success criteria of BC-001 are met on main, and the conditions of RC-018 are closed. Go / No-Go criterion 6 of MIL-004 ("every criterion met") is therefore met. The commit gate for the four milestones is unaffected, because RC-019 names BC-001, not a milestone.

Still open in RC-019

  • Close issue #28.
  • The README's "Continuous integration" section and project layout still name .github/workflows/ci.yml and say CI builds the documentation; the workflow is .gitea/workflows/ci.yml and has no Doxygen step.
  • Decide whether CI should build the documentation again.
  • Optional: add "No issue closed" to #35 and #36, and update the open issues of the Project Plan.

Issues

No issue closed: this pull request records a verdict. #28 (verify the Business Case success criteria) can be closed now that the verdict is Go; that is left to S01.

Refs #28

## Record the verdict Go on RC-019 Records the verdict on `RC-019`, the re-check of the Business Case success criteria on `main`, which was merged in #37 with the verdict `Pending`. S01 accepted the assistant's runs as the measure for success criteria 1 and 5 and recorded Go. ### What changes - `RC-019`: the verdict line reads Go, rows 1 and 5 carry S01's acceptance of the runs, the status line says the record is decided, the condition about S01's own run is closed, and Version History gets a row. - The traceability matrix: the success-criteria row lists `RC-019` (Go) as the latest record after `RC-018` (Go-with-conditions), the coverage note says so, and Version History gets a row. No code, no other document and no workflow changes. `RC-018` is left as it is: its conditions are closed by the record that names it. ### What the verdict means All seven success criteria of `BC-001` are met on `main`, and the conditions of `RC-018` are closed. Go / No-Go criterion 6 of `MIL-004` ("every criterion met") is therefore met. The commit gate for the four milestones is unaffected, because `RC-019` names `BC-001`, not a milestone. ### Still open in `RC-019` - Close issue #28. - The README's "Continuous integration" section and project layout still name `.github/workflows/ci.yml` and say CI builds the documentation; the workflow is `.gitea/workflows/ci.yml` and has no Doxygen step. - Decide whether CI should build the documentation again. - Optional: add "No issue closed" to #35 and #36, and update the open issues of the Project Plan. ### Issues No issue closed: this pull request records a verdict. #28 (verify the Business Case success criteria) can be closed now that the verdict is Go; that is left to S01. Refs #28
Tirsvad added 2 commits 2026-10-07 19:29:34 +02:00
S01 accepted the assistant's runs as the measure for success criteria 1 and 5 and
recorded Go on the re-check of the Business Case success criteria on main. All seven
criteria are met, and the conditions of RC-018 are closed. The traceability matrix
row follows the verdict.

Refs #28
Resolve pending commit links
CI / checks (push) Successful in 44s
CI / checks (pull_request) Successful in 48s
0fe106d2f0
Replace pending in the Version History of RC-019 and of the traceability matrix with
the link to the commit that recorded the verdict.
Tirsvad merged commit ca6c9d9f3c into main 2026-10-07 19:29:56 +02:00
Sign in to join this conversation.
No Reviewers
No labels
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: Tirsvad-Udemy-100-days-of-code/018-turtle#38