Sync MIL-003 to Gitea: unique task 6 title, delta confirmation, milestone link
The MIL-003 milestone (id 74) and its issues #22 to #27 are created on Gitea. Creating them exposed a collision: task 6 of MIL-003 had the same title as task 6 of MIL-001, and sync-project.sh matches issues by title, so it overwrote the closed MIL-001 issue #6 (milestone and a Phase line). Issue #6 was restored, and MIL-003 task 6 is renamed "Review the visible-colours code against qc-programming-python", which is issue #27. No other task title is shared between the milestone documents. - MIL-003: rename task 6 (new Version History row, accepted by S01). - RC-008: add the delta confirmation for the rename; no criterion result changes (new row, accepted by S01). - PP-001: link the MIL-003 gateway to its Milestone (a link update, no new Version History row).
This commit is contained in:
@@ -9,7 +9,8 @@
|
||||
## Version History
|
||||
| Date | Status | Author | Reviewer | Change | Commit |
|
||||
| --- | --- | --- | --- | --- | --- |
|
||||
| 2026-10-08 | Accepted | Jens Tirsvad Nielsen | S01 | Initial version (draft prepared by the assistant for S01 to confirm)<br>Terms confirmed by S01, verdict `Go` | [188b2e9] |
|
||||
| 2026-10-08 | Deprecated | Jens Tirsvad Nielsen | S01 | Initial version (draft prepared by the assistant for S01 to confirm)<br>Terms confirmed by S01, verdict `Go` | [188b2e9] |
|
||||
| 2026-10-08 | Accepted | Jens Tirsvad Nielsen | S01 | Added the delta confirmation for the rename of task 6 of MIL-003 | pending |
|
||||
|
||||
---
|
||||
|
||||
@@ -25,6 +26,8 @@
|
||||
every criterion and recorded what it found; S01 confirmed the open point on
|
||||
2026-10-08 and the verdict is `Go`.
|
||||
|
||||
**Delta confirmation, 2026-10-08:** after the review, task 6 of [MIL-003] was renamed from "Review the phase code against qc-programming-python" to "Review the visible-colours code against qc-programming-python". The old title was the same as the title of task 6 of MIL-001, and `sync-project.sh` matches issues by title, so creating the issues overwrote the closed MIL-001 issue #6; it was restored, and the renamed task became issue #27. No criterion result below changes: the summary, the deliverable, the criteria, the traceability, the ownership and the date are untouched, and the new title uses the project's own term (*visible colours*) from [MIL-003].
|
||||
|
||||
## Checklist Results
|
||||
|
||||
| # | Criterion | Status | Evidence/Notes |
|
||||
|
||||