Business Case, Stakeholder Analysis, Project Plan and milestone MIL-001 with review records RC-001 to RC-003, then the Python project: PrettyTable Pokemon table, constants, pytest tests, pyproject.toml, Doxyfile, CI workflow and README. Task: MIL-001#1 Task: MIL-001#2 Task: MIL-001#3 Task: MIL-001#4 Task: MIL-001#5 Task: MIL-001#6 Task: MIL-001#7 Task: MIL-001#8
46 lines
2.3 KiB
Markdown
46 lines
2.3 KiB
Markdown
# Business Case (BC)
|
||
|
||
Cite in `CrossReference` only if the instance exists (`new-artifact.sh` checks this for you):
|
||
|
||
- **SA** — Stakeholders section — cite S-IDs instead of re-describing roles
|
||
- **BMC** — Cost–Benefit Assessment must agree with its cost/revenue blocks
|
||
- **BPMN** — Forward: the process that realizes the objectives
|
||
- **KPI** — Success Criteria — each criterion is operationalized by a KPI
|
||
- **UCD** — Forward: scope expressed as actors and goals
|
||
|
||
## Required sections (after Metadata / Version History)
|
||
|
||
In this order:
|
||
|
||
1. **Executive Summary** — one paragraph framing the problem and the
|
||
proposed solution.
|
||
2. **Methodological and Standards Foundation** — states the methodology
|
||
(e.g. Larman's *Applying UML and Patterns*) and quality standards (e.g.
|
||
ISO/IEC 25002/25010/25019) the rest of the document and downstream
|
||
artifacts are built on.
|
||
3. **Problem Statement** — the recurring problems that justify the project.
|
||
4. **Business Opportunity** — what becomes possible if the problem is
|
||
solved.
|
||
5. **Objectives** — concrete, verifiable statements of what the project
|
||
will achieve.
|
||
6. **Scope** — split into `## In Scope` and `## Out of Scope` subsections.
|
||
7. **Expected Benefits** — split into `### Tangible Benefits` and
|
||
`### Intangible Benefits`.
|
||
8. **Strategic Alignment** — how the project supports organizational goals.
|
||
9. **Success Criteria** — a table with explicit, measurable targets (not
|
||
aspirations).
|
||
10. **Risks** — a table with `Risk | Impact | Mitigation` columns; every
|
||
risk must have a mitigation.
|
||
11. **Assumptions** — bullet list, kept distinct from Constraints.
|
||
12. **Constraints** — bullet list, kept distinct from Assumptions.
|
||
13. **Cost–Benefit Assessment** — a table (`Costs | Benefits`); may be
|
||
qualitative if explicitly justified.
|
||
14. **Stakeholders** — a table referencing exact stakeholder IDs from the
|
||
project's Stakeholder Analysis (e.g. `S01`, `S07`) if `SA` exists per
|
||
the CrossReference check above. **Never re-describe stakeholder roles
|
||
inline instead of citing their IDs** — this is the single most common
|
||
defect found when reviewing Business Cases (see `QC-BC-001`'s Common
|
||
Defects).
|
||
15. **Recommendation** — a single, unambiguous "proceed" or "do not
|
||
proceed" statement.
|