Files
016-oop-coffee-machine/docs/sqa/reviews/rc-002-stakeholder-analysis.md
T
Tirsvad c24f41207f
CI / test (push) Successful in 54s
Plan project and set up Phase 1 skeleton
Add the framework submodule and the accepted planning documents:
Business Case, Stakeholder Analysis, Project Plan, three milestones,
review records RC-001 to RC-006 and the traceability matrix.

Set up the project skeleton for MIL-001: pyproject.toml (Python
>=3.13, no runtime dependencies, pytest/ruff/mypy as dev extra),
 src/coffee_machine/constants.py, a constants consistency test,
 Doxyfile and a CI workflow that runs ruff, mypy and pytest.

Task: MIL-001#1
Task: MIL-001#2
Task: MIL-001#3
Task: MIL-001#4
Task: MIL-001#5
Closes #1
Closes #2
Closes #3
Closes #4
Closes #5
2026-10-07 10:43:22 +08:00

3.9 KiB

Review: Stakeholder Analysis SA-001

Metadata

Key Value
ID RC-002
CrossReference SA-001, QC-SA-001, QC-LANG-001

Version History

Date Status Author Reviewer Change Commit
2026-10-07 Accepted Jens Tirsvad Nielsen S01 Review record pending

Artifact Under Review

  • Instance reviewed: SA-001
  • Checklist used: QC-SA-001
  • Scope: full review
  • Language and domain: en / it
  • Language reviewer: none

Checklist Results

# Criterion Status Evidence/Notes
1 Power/Interest grid is filled for every stakeholder, with no gaps or unclassified entries Pass S01-S03 all have power, interest and quadrant. Levels for S02 and S03 are the drafter's classification, not given in the brief; S01 accepts them.
2 Each stakeholder is assigned a unique, stable ID Pass S01, S02, S03.
3 Roles and organizational context are defined with explicit Power and Interest levels, not just narrative description Pass Role, organization, HIGH/LOW levels in the table.
4 Communication needs (channel, frequency, deliverable type) are mapped to project phases or milestones Pass Communication table maps to MIL-001 to MIL-003.
5 Conflicting stakeholder interests are identified with documented mitigation or resolution strategies Pass One conflict (assignment names versus Python style) with a mitigation.
6 Stakeholder concerns are explicitly traced to Business Case objectives Pass Business Goal Alignment table cites BC-001 objectives 1-4.
7 Primary concerns are expressed in both business language and a recognized quality-attribute mapping (e.g. FURPS+) Pass FURPS+ mapping table.
8 Document is understandable and navigable by non-technical stakeholders reviewing their own entry Pass Plain table, one row per stakeholder.

Language and Domain Results

Checklist: QC-LANG-001.

# Criterion Status Evidence/Notes
1 The Metadata table has a Language row and a Domain row, and neither is a placeholder Pass `Language
2 Language is a BCP 47 code and Domain is a value from the registry's domain list Pass en is BCP 47; it is in the registry's domain list.
3 The content (prose and table cells) is written in the stated language Pass All prose and table cells are English.
4 The register matches the one the registry gives for the artifact type Pass Register is IT Professional English as the registry states.
5 Domain terms are the PO terms of the domain's dictionary, with no synonyms Pass No dictionary (DICT) exists yet; terms (Menu, CoffeeMaker, MoneyMachine, drink, resource) are the assignment's own and used consistently.
6 Metadata keys, section headings, IDs and statuses are in English Pass Verified by reading the file.
7 No translated twin (<name>.<language>.md) exists beside the document Pass No twin file in docs/.
8 A change of language or domain since the previous accepted version has a Version History row and was reviewed again N-A First accepted version; no language change.
9 A reviewer competent in the domain, and in the language, has confirmed that the domain terms are used correctly Pass S01 reads English and works in the IT domain; S01 asked for this review and acceptance in chat.
10 Abbreviations are spelled out on first use, in the stated language Pass PO, FURPS+, CI, PP, MIL are defined by the framework; PO is spelled out in the Stakeholder Analysis.

Overall Verdict

Go — all criteria pass.

Action Items

Action Owner Due
Confirm the Power/Interest levels of S02 and S03 S01 2026-10-09