Resolve pending commit links and add framework submodule
Replace `pending` in the Version History of the planning documents and
review records with the link to commit c24f412, and add the framework
gitlink that was missing from that commit.

Refs #1
Refs #2
Refs #3
Refs #4
Refs #5

Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
2026-10-07 10:45:17 +08:00

68 lines
3.6 KiB
Markdown

# Review: Milestone MIL-002
## Metadata
| Key | Value |
| --- | --- |
| ID | RC-004 |
| CrossReference | [MIL-002], [QC-MIL-001], [QC-LANG-001] |
## Version History
| Date | Status | Author | Reviewer | Change | Commit |
| --- | --- | --- | --- | --- | --- |
| 2026-10-07 | Accepted | Jens Tirsvad Nielsen | S01 | Review record | [c24f412] |
---
## Artifact Under Review
- Instance reviewed: [MIL-002]
- Checklist used: [QC-MIL-001]
- Scope: full review
- Language and domain: en / it
- Language reviewer: none
## Checklist Results
| # | Criterion | Status | Evidence/Notes |
| --- | --- | --- | --- |
| 1 | A concrete deliverable is defined for every gate | Pass | The four modules and the tests. |
| 2 | Explicit Go/No-Go criteria are stated for each gate | Pass | Criteria are checkable by a command or a file check (pytest, pip install, doxygen, `.gitignore`). |
| 3 | Dependencies on other milestones are explicitly mapped | Pass | Depends on MIL-001, with reason. |
| 4 | Each milestone is traceable to a Business Case objective or KPI | Pass | Objectives 1 and 2, success criteria 1 and 4. |
| 5 | Milestone owner and approving reviewer are identified | Pass | Owner and approving reviewer are S01. Same person; accepted for a solo project (see Action Items). |
| 6 | Milestone has a defined target date consistent with project constraints | Pass | 2026-10-14, on or before the BC-001 completion constraint 2026-10-16. |
## Language and Domain Results
Checklist: [QC-LANG-001].
| # | Criterion | Status | Evidence/Notes |
| --- | --- | --- | --- |
| 1 | The Metadata table has a `Language` row and a `Domain` row, and neither is a placeholder | Pass | `Language | en`, `Domain | it`. |
| 2 | `Language` is a BCP 47 code and `Domain` is a value from the registry's domain list | Pass | `en` is BCP 47; `it` is in the registry's domain list. |
| 3 | The content (prose and table cells) is written in the stated language | Pass | All prose and table cells are English. |
| 4 | The register matches the one the registry gives for the artifact type | Pass | Register is IT Executive English as the registry states. |
| 5 | Domain terms are the PO terms of the domain's dictionary, with no synonyms | Pass | No dictionary (`DICT`) exists yet; terms (Menu, CoffeeMaker, MoneyMachine, drink, resource) are the assignment's own and used consistently. |
| 6 | Metadata keys, section headings, IDs and statuses are in English | Pass | Verified by reading the file. |
| 7 | No translated twin (`<name>.<language>.md`) exists beside the document | Pass | No twin file in `docs/`. |
| 8 | A change of language or domain since the previous accepted version has a Version History row and was reviewed again | N-A | First accepted version; no language change. |
| 9 | A reviewer competent in the domain, and in the language, has confirmed that the domain terms are used correctly | Pass | S01 reads English and works in the IT domain; S01 asked for this review and acceptance in chat. |
| 10 | Abbreviations are spelled out on first use, in the stated language | Pass | PO, FURPS+, CI, PP, MIL are defined by the framework; PO is spelled out in the Stakeholder Analysis. |
## Overall Verdict
Go — all criteria pass.
## Action Items
| Action | Owner | Due |
| --- | --- | --- |
| Confirm that S01 as both owner and approving reviewer is acceptable | S01 | 2026-10-09 |
---
[MIL-002]: ../../milestones/mil-002-core.md
[QC-MIL-001]: ../../../framework/qc/qc-milestones-gateways.md
[QC-LANG-001]: ../../../framework/qc/qc-language-domain.md
[c24f412]: https://git.tirsystem.com/Tirsvad-Udemy-100_days_of_code/016-oop_coffee_machine/commit/c24f41207fb15f39b0ad6501e1f3126d3bd9232e