60 lines
2.6 KiB
Markdown
60 lines
2.6 KiB
Markdown
# Traceability Matrix
|
|
|
|
## Metadata
|
|
| Key | Value |
|
|
| --- | --- |
|
|
| ID | TM-001 |
|
|
| CrossReference | [BC-001] |
|
|
|
|
## Version History
|
|
| Date | Status | Author | Reviewer | Change | Commit |
|
|
| --- | --- | --- | --- | --- | --- |
|
|
| 2026-10-06 | Proposed | Jens Tirsvad Nielsen | S01 | Added MIL-004 | [8ef00aa] |
|
|
| 2026-10-06 | Proposed | Jens Tirsvad Nielsen | S01 | Added RC-006, RC-007 and the source code row | [00d47e2] |
|
|
|
|
---
|
|
|
|
## Purpose
|
|
|
|
Tracks backward/forward links between artifact instances so that the Business Case's
|
|
cross-artifact traceability can be measured. A row is added or updated whenever an
|
|
artifact instance is created or reviewed.
|
|
|
|
## Traceability Table
|
|
|
|
| Artifact Instance | Type | Upstream (Backward Link) | Downstream (Forward Link) | Last Reviewed (RC-ID) |
|
|
| --- | --- | --- | --- | --- |
|
|
| [SA-001] | Stakeholder Analysis | - | [BC-001] | [RC-002] |
|
|
| [BC-001] | Business Case | [SA-001] | [PP-001], [MIL-001], [MIL-002], [MIL-003], [MIL-004] | [RC-001] |
|
|
| [PP-001] | Project Plan | [BC-001], [SA-001] | [MIL-001], [MIL-002], [MIL-003], [MIL-004] | - |
|
|
| [MIL-001] | Milestone | [BC-001], [PP-001] | - | [RC-003] |
|
|
| [MIL-002] | Milestone | [BC-001], [PP-001] | - | [RC-004] |
|
|
| [MIL-003] | Milestone | [BC-001], [PP-001] | - | [RC-005] |
|
|
| [MIL-004] | Milestone | [BC-001], [PP-001] | - | [RC-007] |
|
|
| Source code (`src/`, `tests/`) | Source code | [MIL-002], [MIL-003], [MIL-004] | - | [RC-006] |
|
|
|
|
## Coverage Notes
|
|
|
|
- `-` in Upstream means foundational; in Downstream, nothing is built on it yet; in Last Reviewed, no `RC-*` exists yet.
|
|
- [PP-001] has no QC checklist in the framework, so it has no `RC-*`.
|
|
- No use case, domain model, design or data artifacts exist; the plan treats all tasks as plain technical tasks. The source code is reviewed in [RC-006].
|
|
|
|
---
|
|
|
|
[SA-001]: ../stakeholder-analysis.md
|
|
[BC-001]: ../business-case.md
|
|
[PP-001]: ../project-plan.md
|
|
[MIL-001]: ../milestones/mil-001-project-setup.md
|
|
[MIL-002]: ../milestones/mil-002-coffee-machine-core.md
|
|
[MIL-003]: ../milestones/mil-003-quality-and-publication.md
|
|
[MIL-004]: ../milestones/mil-004-code-review-and-ci.md
|
|
[RC-001]: ./reviews/rc-001-business-case.md
|
|
[RC-002]: ./reviews/rc-002-stakeholder-analysis.md
|
|
[RC-003]: ./reviews/rc-003-mil-001.md
|
|
[RC-004]: ./reviews/rc-004-mil-002.md
|
|
[RC-005]: ./reviews/rc-005-mil-003.md
|
|
[RC-006]: ./reviews/rc-006-source-code.md
|
|
[RC-007]: ./reviews/rc-007-mil-004.md
|
|
[8ef00aa]: https://git.tirsystem.com/Tirsvad-Udemy-100_days_of_code/015-coffee_machine/commit/8ef00aafaaa193ea565f1a45238d31e963a5e05d
|
|
[00d47e2]: https://git.tirsystem.com/Tirsvad-Udemy-100_days_of_code/015-coffee_machine/commit/00d47e244c82007bbc55e18312649189b175ec10
|