Files
015-coffee-machine/docs/sqa/traceability-matrix.md
T
TirsvadandClaude Sonnet 5.5 2b65618c1a
CI / checks (push) Successful in 52s
CI / checks (pull_request) Successful in 54s
Resolve pending commit links in the RC-008 change
Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>
2026-10-06 21:46:06 +08:00

60 lines
2.6 KiB
Markdown

# Traceability Matrix
## Metadata
| Key | Value |
| --- | --- |
| ID | TM-001 |
| CrossReference | [BC-001] |
## Version History
| Date | Status | Author | Reviewer | Change | Commit |
| --- | --- | --- | --- | --- | --- |
| 2026-10-06 | Proposed | Jens Tirsvad Nielsen | S01 | Added RC-006, RC-007 and the source code row | [00d47e2] |
| 2026-10-06 | Proposed | Jens Tirsvad Nielsen | S01 | Business Case last reviewed in RC-008 | [71a27dd] |
---
## Purpose
Tracks backward/forward links between artifact instances so that the Business Case's
cross-artifact traceability can be measured. A row is added or updated whenever an
artifact instance is created or reviewed.
## Traceability Table
| Artifact Instance | Type | Upstream (Backward Link) | Downstream (Forward Link) | Last Reviewed (RC-ID) |
| --- | --- | --- | --- | --- |
| [SA-001] | Stakeholder Analysis | - | [BC-001] | [RC-002] |
| [BC-001] | Business Case | [SA-001] | [PP-001], [MIL-001], [MIL-002], [MIL-003], [MIL-004] | [RC-008] |
| [PP-001] | Project Plan | [BC-001], [SA-001] | [MIL-001], [MIL-002], [MIL-003], [MIL-004] | - |
| [MIL-001] | Milestone | [BC-001], [PP-001] | - | [RC-003] |
| [MIL-002] | Milestone | [BC-001], [PP-001] | - | [RC-004] |
| [MIL-003] | Milestone | [BC-001], [PP-001] | - | [RC-005] |
| [MIL-004] | Milestone | [BC-001], [PP-001] | - | [RC-007] |
| Source code (`src/`, `tests/`) | Source code | [MIL-002], [MIL-003], [MIL-004] | - | [RC-006] |
## Coverage Notes
- `-` in Upstream means foundational; in Downstream, nothing is built on it yet; in Last Reviewed, no `RC-*` exists yet.
- [PP-001] has no QC checklist in the framework, so it has no `RC-*`.
- No use case, domain model, design or data artifacts exist; the plan treats all tasks as plain technical tasks. The source code is reviewed in [RC-006].
---
[SA-001]: ../stakeholder-analysis.md
[BC-001]: ../business-case.md
[PP-001]: ../project-plan.md
[MIL-001]: ../milestones/mil-001-project-setup.md
[MIL-002]: ../milestones/mil-002-coffee-machine-core.md
[MIL-003]: ../milestones/mil-003-quality-and-publication.md
[MIL-004]: ../milestones/mil-004-code-review-and-ci.md
[RC-002]: ./reviews/rc-002-stakeholder-analysis.md
[RC-003]: ./reviews/rc-003-mil-001.md
[RC-004]: ./reviews/rc-004-mil-002.md
[RC-005]: ./reviews/rc-005-mil-003.md
[RC-006]: ./reviews/rc-006-source-code.md
[RC-007]: ./reviews/rc-007-mil-004.md
[RC-008]: ./reviews/rc-008-business-case-v3.md
[00d47e2]: https://git.tirsystem.com/Tirsvad-Udemy-100_days_of_code/015-coffee_machine/commit/00d47e244c82007bbc55e18312649189b175ec10
[71a27dd]: https://git.tirsystem.com/Tirsvad-Udemy-100_days_of_code/015-coffee_machine/commit/71a27ddc1f5555c1b836b1556fab292ebc9deb62