RC-001 Business Case Review

Metadata

Key Value
ID RC-001
CrossReference BC-001, QC-BC-001

Version History

Date Status Author Reviewer Change Commit
2026-10-06 Accepted Jens Tirsvad Nielsen S01 Initial version 8ef00aa

Artifact Under Review

  • Instance reviewed: BC-001 (docs/business-case.md)
  • Checklist used: QC-BC-001 (QC-BC-001)
  • Independence: S01 is the only stakeholder and is also the recorded author, so the reviewer-is-not-author rule cannot be met. The documents were drafted by Claude on S01's behalf; S01 reviews and signs. This is a known limit of a one-person project, not a clean independent review.

Checklist Results

# Criterion Status Evidence/Notes
1 ROI/Cost-Benefit analysis is quantitative, or where qualitative, is explicitly justified Pass Cost-Benefit table is explicitly qualitative and says why (no money involved).
2 Risks are identified with documented impact and mitigation Pass Three risks, each with impact and mitigation.
3 Success criteria are measurable, stating explicit targets rather than vague aspirations Pass Five criteria with targets and a measure each.
4 Scope explicitly separates In Scope vs Out of Scope Pass ### In Scope and ### Out of Scope are separate.
5 Stakeholders are cross-referenced to Stakeholder Analysis IDs rather than re-described inline Pass Stakeholders table cites S01 to S03 only; no roles are re-described.
6 Methodology and quality-standard foundation are stated explicitly (e.g. ISO/IEC 25010, Larman) Pass Methodology section names the framework, ISO/IEC 25010:2023 and the coding conventions.
7 Assumptions and constraints are explicit and clearly distinguished from one another Pass Fixed in v2: the first draft had no duration, although MIL-001 to MIL-003 and PP-001 cite one. Constraints now state 2026-10-05 to 2026-10-12.
8 Document supports executive decision-making with a clear, unambiguous recommendation Pass Recommendation is a single "Proceed" with a reason.

Overall Verdict

Go — all mandatory criteria pass. Criterion 7 first failed (missing duration constraint) and was fixed in the same change as BC-001 v2.

Action Items

Action Owner Due
Add the duration constraint to BC-001 (done in v2) S01 2026-10-06