Traceability Matrix

Metadata

Key Value
ID TM-001
CrossReference BC-001

Version History

Date Status Author Reviewer Change Commit
2026-10-06 Deprecated Jens Tirsvad Nielsen S01 Business Case last reviewed in RC-008 71a27dd
2026-10-06 Accepted Jens Tirsvad Nielsen S01 Project Plan last reviewed in RC-009 52b9725

Purpose

Tracks backward/forward links between artifact instances so that the Business Case's cross-artifact traceability can be measured. A row is added or updated whenever an artifact instance is created or reviewed.

Traceability Table

Artifact Instance Type Upstream (Backward Link) Downstream (Forward Link) Last Reviewed (RC-ID)
SA-001 Stakeholder Analysis - BC-001 RC-002
BC-001 Business Case SA-001 PP-001, MIL-001, MIL-002, MIL-003, MIL-004 RC-008
PP-001 Project Plan BC-001, SA-001 MIL-001, MIL-002, MIL-003, MIL-004 RC-009
MIL-001 Milestone BC-001, PP-001 - RC-003
MIL-002 Milestone BC-001, PP-001 - RC-004
MIL-003 Milestone BC-001, PP-001 - RC-005
MIL-004 Milestone BC-001, PP-001 - RC-007
Source code (src/, tests/) Source code MIL-002, MIL-003, MIL-004 - RC-006

Coverage Notes

  • - in Upstream means foundational; in Downstream, nothing is built on it yet; in Last Reviewed, no RC-* exists yet.
  • PP-001 has no QC checklist in the framework; RC-009 reviews it against criteria taken from the Project Plan reference.
  • No use case, domain model, design or data artifacts exist; the plan treats all tasks as plain technical tasks. The source code is reviewed in RC-006.