# SQA Review Record: Project Plan
## Metadata
| Key | Value |
| --- | --- |
| ID | RC-003 |
| CrossReference | [PP-001] |
## Version History
| Date | Status | Author | Reviewer | Change | Commit |
| --- | --- | --- | --- | --- | --- |
| 2026-10-04 | Accepted | Jens Tirsvad Nielsen | S01 | Initial version | [a1ff735] |
---
## Artifact Under Review
- Instance reviewed: [PP-001]
- Checklist used: none exists for this type (`PP` has no QC checklist); criteria below follow `references/PP.md` "Validating".
## Checklist Results
| # | Criterion | Status | Evidence/Notes |
| --- | --- | --- | --- |
| 1 | Every MIL-* gateway is scheduled | Pass | MIL-001 to MIL-004 listed with window, decision date and owner. |
| 2 | Schedule is consistent with the Business Case constraint | Pass | Ends 2026-10-14, matching the target-date constraint added to BC-001. |
| 3 | Gateway Schedule, Gantt, Scope Coverage, Dependencies, Plan Risks and Open Issues sections are present | Pass | All required sections present. |
| 4 | Each phase links to its synced Milestone | Pass | Milestones 36–39 linked. |
| 5 | Every Business Case scope item maps to a gateway | Pass | Scope Coverage table. |
## Overall Verdict
Go — no QC checklist exists for PP, so the plan was checked against BC-001 and the MIL-* documents. Open issues (README template, Python version, dates) remain listed in the plan. Reviewer and author are both S01: the project has a single participant, so the framework's author/reviewer separation cannot be met. S01 accepted this deviation when requesting acceptance (2026-10-04).
## Action Items
| Action | Owner | Due |
| --- | --- | --- |
| Provide README template before MIL-004 task 1 | S01 | 2026-10-13 |
| Confirm requires-python (>=3.13 or 3.14+) | S01 | 2026-10-06 |
---
[PP-001]: ../../project-plan.md