🃏 Blackjack
A console Blackjack game against a computer dealer, played with emoji cards.
It is the day 11 capstone of Udemy's 100 Days of Code: The Complete Python Pro
Bootcamp, built with a plan-first process (milestones and issues in docs/).
📚 Table of Contents
🧭 Overview
The game is the day 11 capstone of the course. You and the computer dealer each get two cards, shown as emoji. You choose to draw another card (y) or to pass (n); then the dealer draws while its score is below 17, and the program tells you who won. Afterwards you can play again.
House rules:
- The deck is unlimited; cards are not removed when drawn. No jokers.
- Jack, Queen and King count 10. An ace counts 11 or 1.
- A two-card hand of ace + 10 is a blackjack.
- The computer is the dealer and draws while its score is below 17.
📋 Requirements
- Python 3.13 or newer
- No runtime dependencies
- Optional: Doxygen to build the source documentation
- A terminal with UTF-8 and emoji support (for example Windows Terminal)
🛠️ Setup
Create and activate a local virtual environment, upgrade pip, then install the project in editable mode with the development tools.
Windows (PowerShell):
python -m venv .venv
.\.venv\Scripts\Activate.ps1
python -m pip install --upgrade pip
python -m pip install -e ".[dev]"
Linux and macOS:
python3 -m venv .venv
source .venv/bin/activate
python -m pip install --upgrade pip
python -m pip install -e ".[dev]"
Leave the environment with deactivate.
▶️ Run
Start the game from the activated virtual environment:
python -m blackjack
🧪 Tests
python -m unittest discover -s tests
pytest also runs the same tests (python -m pytest).
Lint and type check:
ruff check .
ruff format --check .
mypy src
Build the source documentation from the Doxygen comments in src/ (written to docs/doxygen/):
doxygen Doxyfile
📄 License
The code is licensed under the GNU Affero General Public License v3.0 or later (AGPL-3.0-or-later). See LICENSE.
🔗 Links
📎 Appendix: Project documents
The documents a newcomer needs, in reading order.
| Document | What it tells you |
|---|---|
| Business Case | Why the project exists, its scope and success criteria |
| Stakeholder Analysis | Who is involved; the stakeholder IDs used for owners and reviewers |
| Project Plan | The gateways and their schedule |
| Milestones | One document per gateway: Go/No-Go criteria and tasks |
| Artifact registry | Where each artifact type lives, the next version, the PO language and domain |
| Traceability matrix | How the artifacts link and when each was last reviewed |