# Review Record: MIL-010 (outcome: release 2.1.0)
|
|
|
|
## Metadata
|
|
| Key | Value |
|
|
| --- | --- |
|
|
| ID | RC-075 |
|
|
| CrossReference | [MIL-010], [QC-MIL-001] |
|
|
|
|
## Version History
|
|
| Date | Status | Author | Reviewer | Change | Commit |
|
|
| --- | --- | --- | --- | --- | --- |
|
|
| 2026-10-14 | Accepted | Jens Tirsvad Nielsen | AI as stand-in for S01 | Initial version; accepted | pending |
|
|
|
|
---
|
|
|
|
## Artifact Under Review
|
|
|
|
- Instance reviewed: [MIL-010]
|
|
- Checklist used: [QC-MIL-001]
|
|
- Scope: delta re-review of the results of task 9 and the closing statement of the milestone; earlier records RC-068 and RC-074
|
|
- Language and domain: n/a (technical type)
|
|
- Language reviewer: none
|
|
- Mode: autonomous, not independent (the reviewer is `AI as stand-in for S01`; the user accepted the plan in chat on 2026-10-14)
|
|
|
|
## Checklist Results
|
|
|
|
| # | Criterion | Status | Evidence/Notes |
|
|
| --- | --- | --- | --- |
|
|
| 1 | A concrete deliverable is defined for every gate | Pass | Delivered: `code-metrics.yml` with its three script files, the guide, the wiki pages in three languages and the release 2.1.0 (tag `v2.1.0`, major tag `v2`, release page). |
|
|
| 2 | Explicit Go/No-Go criteria are stated for each gate | Pass | All nine criteria are met: 1 to 8 in the results of RC-074, 9 by the release of 2.1.0 (runs 1462 and 1463, the tag and the release page read back through the API). |
|
|
| 3 | Dependencies on other milestones are explicitly mapped | Pass | MIL-003 and MIL-004 were used: the reusable workflow mechanism, `tools-ref` and the release workflow. |
|
|
| 4 | Each milestone is traceable to a Business Case objective or KPI | Pass | O5. Success criterion 5 is met only in a throwaway repository; a project repository still has to adopt it, recorded as an action item. |
|
|
| 5 | Milestone owner and approving reviewer are identified | Pass | S05 and S01. |
|
|
| 6 | Milestone has a defined target date consistent with project constraints | Pass | Target date 2027-01-30; the work was done on 2026-10-14, ahead of it. |
|
|
|
|
## Overall Verdict
|
|
|
|
Go - the milestone is complete: every Go/No-Go criterion is met and the workflow is released as 2.1.0. The AI records the decision as stand-in for S01; there is no independent reader and the decision stays open to challenge in the run summary.
|
|
|
|
## Action Items
|
|
|
|
| Action | Owner | Due |
|
|
| --- | --- | --- |
|
|
| Adopt `code-metrics.yml` in a project repository, so that success criterion 5 is met by a real project | S01 | next project that has tests |
|
|
| Delete the throwaway repository `TirSystem/code-metrics-adoption` and the branches `verify-badges-delivery` and `badges-verify` (and their copies on the GitHub mirror) | S01 | after the review of the summary |
|
|
| Find where the required check `TirSystem/github-action: Publish wiki / *` comes from; it blocked the merge of pull request 164 through the API and is not in the branch protection of the repository | S03 | before the next pull request |
|
|
|
|
---
|
|
|
|