Review Record: MIL-004 (verification results)
Metadata
| Key | Value |
|---|---|
| ID | RC-048 |
| CrossReference | MIL-004, QC-MIL-001 |
Version History
| Date | Status | Author | Reviewer | Change | Commit |
|---|---|---|---|---|---|
| 2026-10-11 | Deprecated | Jens Tirsvad Nielsen | S01 | Initial version | 6933e91 |
| 2026-10-11 | Accepted | Jens Tirsvad Nielsen | S01 | Criterion 3 verified; the action item is closed | 05b635c |
Artifact Under Review
- Instance reviewed: MIL-004 after the first release, with its new Verification results section
- Checklist used: QC-MIL-001
Checklist Results
| # | Criterion | Status | Evidence/Notes |
|---|---|---|---|
| 1 | A concrete deliverable is defined for every gate | Pass | The release process, the upgrade guide, the release workflow and the scripts at a pinned reference now exist; the release page of v1.0.0 is the proof. |
| 2 | Explicit Go/No-Go criteria are stated for each gate | Pass | All five criteria have a result in the Verification results table, each naming its evidence. |
| 3 | Dependencies on other milestones are explicitly mapped | Pass | Unchanged (MIL-003). |
| 4 | Each milestone is traceable to a Business Case objective or KPI | Pass | O2 and O4, unchanged. |
| 5 | Milestone owner and approving reviewer are identified | Pass | Owner S05, approving reviewer S01, unchanged. |
| 6 | Milestone has a defined target date consistent with project constraints | Pass | 2026-11-28; the criteria are met on 2026-10-11. |
Overall Verdict
Go - all six criteria pass, and the five Go/No-Go criteria of MIL-004 are met. Criterion 3 (a consumer pinned to the previous version keeps working) was met by construction at the first release and verified on 2026-10-11 with pinned consumers after v1.0.1 and v1.1.0 (see the Verification results of MIL-004). S01 gave the Go in chat on 2026-10-11, standing in for the other reviewers as ADR-0002 records; there is no independent reader.
Action Items
| Action | Owner | Due |
|---|---|---|
Done 2026-10-11: criterion 3 verified with pinned consumers after v1.0.1 (run 660) and v1.1.0 (run 672) |
S05 | done |