| 1 |
Follows INVEST criteria (Independent, Negotiable, Valuable, Estimable, Small, Testable) |
Pass |
INVEST check present; US-001.05 and US-001.06 depend on US-001.04 and say so. |
| 2 |
Written in "As a / I want / So that" form |
Pass |
All eight. |
| 3 |
Clear, testable acceptance criteria are included |
Pass |
Two Given/When/Then criteria per story, each checked by a run or the guide. |
| 4 |
Traceable to a use case or epic |
Pass |
Each story traces to one of UC-001 to UC-004 and to MIL-002. |
| 5 |
Story is sized to fit within a single iteration |
Pass |
Each is one goal; two are already implemented and only tested. |
| 6 |
Story statement avoids technical implementation detail |
Pass |
Domain terms only (mirror, token, runner). |
| 7 |
Role named in the story matches an actor defined in the Use Case Diagram |
Pass |
DevOps Professional and Platform Operator both appear in UCD-001. |